Department of Public Utilities Operations & Maintenance Building Demolition

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fresno is seeking a licensed contractor for the demolition of two structures at the Department of Public Utilities Operations and Maintenance facility in Fresno, California. The project scope includes the demolition of the primary O&M building, which is approximately 295,225 gross square feet with a 162,320 square foot footprint, and a 1,000 square foot maintenance shop building. Key activities involve hazardous materials abatement for asbestos and lead-based paint, vegetation removal, the removal of an existing railroad spur, and the cutting and plugging of water, gas, and sewer lines near E and G Streets. Following demolition, the contractor must backfill the 10,360 square foot basement and other excavated areas using approximately 10,250 cubic yards of imported soil to match the existing site grade. The project is estimated to take five months, consisting of an eight-week hazardous materials abatement phase and a twelve-week building demolition phase. A critical requirement is the development and implementation of a Hazardous Materials Abatement Plan by certified professionals as a condition of the contract award. Environmental compliance is mandatory, including adherence to the California Construction General Permit for stormwater and erosion control, CALGreen standards, and a requirement to divert at least 75 percent of construction waste. For safety and security, the demolished areas must be fenced with six-foot windscreens and fiber rolls, while the existing parking lot will remain operational for storage and parking.

General Info

City of Fresno seeks licensed contractor for demolition and hazardous abatement of two buildings.

Agency

California → City of Fresno

Place of Performance

E Street, Stanislaus Street, Fresno, CA, 93706

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Fresno
Office AddressN/A
Contacts
Daniel CarrionLicensed Professional Engineer

Full Description

Show more
The City is proposing to demolish two structures currently used as DPU’s O&M facilities. The project consists of hazardous materials abatement, demolition, vegetation removal, and disposal. In total, the O&M building is approximately 295,225 gross square feet in size, with a building footprint of approximately 162,320 square feet. The maintenance shop building is approximately 1,000 square feet. The project is limited to demolition activities and does not include construction of new structures or operational uses. During demolition, any excavated areas and the existing basement would be backfilled to match existing grade of the project site. The demolished areas would be fenced to prevent entry. The parking lot would remain in operation as parking and storage.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS