Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Park Entrance and Land Acknowledgement Signs

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation is seeking to install or replace park entrance signs at Azalea State Natural Reserve, Fort Humboldt State Historic Park, and Little River State Beach. These signs are intended to provide land acknowledgments, informing visitors of the indigenous people whose land the parks occupy. A total of five signs will be installed, with one at Azalea State Natural Reserve and two each at Little River State Beach and Fort Humboldt State Historic Park. The installation process involves excavating two 12-inch diameter holes at a depth of 48 inches, spaced approximately 96 inches apart, using hand tools or small gas-powered augers. To minimize ground disturbance, the project will prioritize placing the new signs in the same locations as existing signage where reasonable. The project is based in Eureka, California, and is managed by District Planner Rosalind Litzky.

General Info

California Department of Parks and Recreation installing five land acknowledgment signs in Eureka.

Agency

California Parks and Recreation, Department of

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Eureka, CA

Set-Aside

NONE

Documents

(1)

CEQA #14594 / District Project #635-25-025 Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Rosalind LitzkyDistrict Planner

Full Description

Show more
The project proposes to install or replace park entrance signs in Azalea State Natural Reserve, Fort Humboldt State Historic Park and Little River State Beach to inform visitors of the names of the people whose land the park is built on. Per sign, work will use hand tools or a small gas-powered auger to excavate two (2) 12-in. dia. by 48-in. deep holes approximately 96-inches apart. There will be one (1) sign at Azalea State Natural Reserve, two (2) signs installed at Little River State Beach, and two (2) signs installed at Fort Humboldt State Historic Park. Where reasonable, signs will be installed in the locations as existing signs, to minimize ground disturbance.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
DEMOLITION OF 3019 FAIRWEST PLACE
Solicitation # CP 2507
This solicitation, identified as CP 2507, involves the complete demolition and removal of the existing building and site improvements located at 3019 Fairwest Place in Montgomery, Alabama. The scope of work requires the contractor to demolish the structure down to the building pad, encompassing all architectural, structural, mechanical, electrical, and plumbing systems, as well as concrete slabs, sidewalks, and fencing. The project includes the disconnection and capping of all utilities in coordination with relevant agencies, the removal of the water meter, and the protection of services to adjacent properties. All hazardous materials, refrigerants, and debris must be disposed of in strict accordance with EPA, state, and local regulations, with debris removed from the site daily. Following the demolition, the contractor is responsible for backfilling and grading the site to ensure positive drainage and stabilization for mowing. The project also mandates the installation and maintenance of erosion and sediment control measures throughout the construction process. All work must comply with applicable codes and permitting requirements, maintaining coordination with governing authorities and utility providers. Interested parties must submit their responses by the deadline of September 29, 2026, at 5:00 PM. The project is managed by the Alabama agency PIPE-Inspections, with Walter Bush serving as the primary point of contact.
PIPE-Inspections

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS