This Government Contract opportunity from Department Of Defense was posted on July 12, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Department of Veteran's Affairs American Lake (VAAL) Phase 2A Site Development at Lakewood, WA

Awarded
W912DW22R0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Department of Veteran's Affairs American Lake (VAAL) Phase 2A Site Development is a construction project located in Lakewood, Washington, managed by the U.S. Army Corps of Engineers, Seattle District. This firm-fixed-price contract, solicitation number W912DW22R0004, was awarded as a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) using a Design Bid Build acquisition strategy and a Lowest Priced Technically Acceptable evaluation process. The scope of work encompasses comprehensive site development, including utilities, paving, stormwater conveyance, and exterior site lighting, with specific requirements to ensure architectural compatibility with the campus's historic Spanish Colonial Revival style. The project involves detailed technical specifications across multiple divisions, including general requirements, existing conditions, HVAC, electrical, and utility systems. Throughout the solicitation process, several amendments were issued to refine technical plans, update Davis Bacon Act wage determinations, and revise the index of drawings. Notably, the period of performance was extended from 365 to 547 calendar days. Evaluation of offerors focused heavily on relevant project experience from the previous six years, specifically regarding project magnitude, complexity, and scope.

General Info

Contract Value

$18,313,275

NAICS

238910 - Site Preparation Contractors

Place of Performance

70000, WA, 98493, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

13

Amendment 0001 to Solicitation W912DW22R0004

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912DW22R0004

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation W912DW22R0004

PDF, High priority: read this firstamendment
High

Amendment R0004 Section 00 22 00 Attachment 1 - Offeror Experience Form

DOCX, High priority: read this first2 pages · past-performance
High

Amendment R0005 to Solicitation W912DW22R0004

PDF, High priority: read this firstamendment
High

Attachment 1: Offeror or Key Subcontractor Experience Form

DOCX, High priority: read this first2 pages · past-performance
High

Plans for Solicitation W912DW22R0004

PDF, High priority: read this firstspecifications
High

RFP W912DW22R0004 Amendment R0003

PDF, High priority: read this first49 pages · amendment
High

RFP W912DW22R0004: VAAL Phase 2A Site Development

PDF, High priority: read this first76 pages · rfp
High

Specs_W912DW22R0004 - American Lake Phase 2A Specifications

PDF, High priority: read this firstspecifications
High

Site Visit Roster - RFP W912DW22R0004

PDF, Low prioritysite-visit-roster
Low

VAAL Phase 2A Site Development Site Visit Talking Points (W912DW22R0004)

PDF, Low priority1 page · special-notice
Low

VA Phase 2A Site Development - Justification and Approval

PDF, Low priority8 pages · justification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 18, 2022 to Apr 22, 2022. The notice description changed.

Notice updated

Response deadline changed from Apr 22, 2022 to Apr 26, 2022. The notice description changed.

Notice updated

Response deadline changed from Apr 26, 2022 to Apr 28, 2022. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Seattle
Contacts1 person available
OfficeSEATTLE, WA, 98134-2329, USA
Office AddressSEATTLE, WA, 98134-2329, USA
Contacts

Full Description

Show more
FOR INFORMATION ONLY: This Synopsis/Pre-solicitation Notice is ONLY A NOTIFICATION that a Request for Proposal (RFP) is anticipated and forthcoming. All questions regarding this SYNOPSIS/Pre-solicitation notice should be submitted in writing by email to the Contract Specialist as noted below. The U.S. Army Corps of Engineers, Seattle District (NWS) intends to issue a Design Bid Build (DBB), RFP for the construction of the Department of Veteran's Affairs American Lake (VAAL) Phase 2A Site Development at Lakewood, Washington state. It has been determined that responses to this acquisition will be Service Disabled Veteran Owned Small Business (SDVOSB) under the NAICS code 238910. Project Description: USACE Seattle District has a construction requirement at Department of Veteran's Affairs American Lake (VAAL) which includes demolition and hazardous materials abatement of five (5) existing buildings, existing parking area and underground utilities. The work also includes but is not limited to construction grading, pavements, utilities, lighting, and landscaping for a 650-vehicle parking lot and 1000 feet of two-lane roadway. Utilities will include drainage, sanitary sewer, watermain, electrical, telecommunication, steam and geothermal. In accordance with Department of Defense Federal Acquisition Regulation Supplement (DFARS) 236.204, the estimated magnitude of construction is between $10,000,000 and $25,000,000. The NAICS code for this project is 238910, Commercial and Institutional Building Construction, with a small business size standard of $16.5M. The resulting contract will be firm fixed price. On or About 4 March 2022, the RFP documents for this project will be available via the SAM.gov under RFP number W912DW22R0004. Proposals will be due no sooner than 30 calendar days after actual solicitation issue date. NO CD'S OR HARD COPIES WILL BE MADE AVAILABLE. Downloads are available only through the SAM.gov website. Offerors are responsible for checking the SAM.gov website frequently for any update(s) to this Notice. The Government is not responsible for any loss of internet connectivity or for an Offeror's inability to access the document(s) at the referenced website. To obtain automatic notifications of updates to this solicitation, you MUST log in to www.SAM.gov and add the solicitation to your - Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the - Add Me to Interested Vendors button in the listing for this solicitation. The SAM Response Date listed elsewhere in this synopsis is for FBO archive purposes only. It may have no relationship to the actual solicitation due date. The solicitation due date and time will be contained in the solicitation and any solicitation amendments that are issued. POINT-OF-CONTACT: The point-of-contact for administrative or contractual questions is John Scola at email: contact@example.gov. Please no phone calls. All questions must be submitted in writing to the above point-of-contact. Please do not ask any technical questions, as answers to technical questions are only available through an online system during the RFP process.

More opportunities from Department Of Defense → W071 Endist Seattle

Same awarding agency

NAICS: 236220
New
Federal
JOINT BASE LEWIS MCCHORD MULTI DOMAIN TASK FORCE BUILDINGS 3223-3224, WASHINGTON
Solicitation # W912DW27RA014
Solicitation W912DW27RA014 is a firm fixed price, total small business set-aside contract issued by the U.S. Army Corps of Engineers, Seattle District. The project involves the renovation and conversion of two 1950s-era barracks buildings, known as the Hammer Heads, totaling approximately 63,400 square feet at Joint Base Lewis-McChord, Washington. Building 3224 will be converted into a Brigade Support Battalion facility featuring a Battalion HQ and company operations spaces, while Building 3223 will become a combined administration, readiness, and troop aid facility. The scope of work includes comprehensive site preparation, demolition, utility construction, and specialized environmental remediation for asbestos and lead-based paint abatement. The contract has a mandatory performance period of 730 calendar days from the notice to proceed. Key technical requirements include the installation of outside plant telecommunications, adherence to ABA/ADA accessibility standards, and the use of specific Monaco fire alarm radio transceivers for network compatibility. Award will be determined via a Best Value Tradeoff process, where non-price factors, including past performance and project narrative, are significantly more important than price. Contractors must provide performance and payment bonds, comply with Davis-Bacon wage determinations, and adhere to strict military standards for packaging, marking, and the handling of controlled unclassified information.
Commercial and Institutional Building Construction

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Federal
Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID
Solicitation # W912DW27R1BWMSS
The U.S. Army Corps of Engineers, Seattle District, is conducting market research via a sources sought notice for the design and construction of an Air Traffic Control Tower at Mountain Home Air Force Base in Idaho. The project has a budgeted amount of 32 million dollars and an estimated period of performance of 730 calendar days. The facility must include a control cab accommodating at least six controller stations and five trainers, as well as support spaces such as a simulator room, offices, administrative areas, training and break rooms, and electronic equipment rooms. The government intends to utilize a Progressive Design Build approach with Other Transaction Authority, employing a qualifications-based selection process. This will involve an initial screening to shortlist three firms, followed by interactive pitch meetings to evaluate technical approaches and collaborative capabilities. The procurement will be split into two phases: Phase 1 focusing on the design agreement and Phase 2 focusing on final design and construction under a Guaranteed Maximum Price. Interested firms must submit a capabilities package of no more than 10 pages, including CAGE codes, UEI numbers, and bonding information, to the designated points of contact by the specified deadline.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
Federal
Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222
Solicitation # W912DW27RA017
The USACE Seattle District is conducting market research via a special notice and survey to determine the feasibility of a Project Labor Agreement for the conversion of two barracks buildings, known as the Hammer Heads, into operational facilities for three tier levels of command at Joint Base Lewis McChord, Washington. This project, identified as Buildings 3221-3222 for the Multi Domain Task Force, has an estimated construction magnitude between 40 million and 70 million dollars and an expected duration of 730 calendar days. The effort is currently a small business set-aside. The scope of work involves extensive demolition and renovation, including hazardous material and debris abatement in crawl spaces, the removal of approximately 75 percent of the exterior envelope and interior walls, and the removal of 90 percent of existing mechanical and electrical systems. Required new work includes the installation of a new exterior envelope, updated mechanical and electrical systems, a new Thermoplastic Polyolefin roof system, and exterior painting. The project will also require coordination of new utility connections and management of shared construction boundaries with adjacent projects. This current notice is for survey purposes only and does not constitute a formal solicitation for proposals.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS