Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Agriculture was posted on June 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Deschutes National Forest - GAOA Forest Wide Trail Bridge Reconstruction

Awarded
1240BH25Q0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 1 hour ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 15 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This project on the Deschutes National Forest involves the demolition of two existing multi-log stringer bridges measuring 36 and 25 feet in length, followed by the construction of two new trail bridges. The scope includes providing and installing all necessary materials such as structural timber, steel hardware, bearing pads, stringers, sills, timber railings, backwall systems, and foundation systems. The new structures consist of a 41-foot Glulam Stringer Trail Bridge at East Cultus Lake and a 31-foot Longitudinal Glulam Deck Panel Trail Bridge at Todd Meadow Nordic, with the contractor responsible for fabricating or furnishing these components. Construction will also include approaches with overlapping step systems and borrow material placement, with the contractor supplying sawn timber for these features. The project is valued between $100,000 and $250,000 and is part of a blanket purchase agreement under the Trail Construction and Maintenance BPA, specifically under a previously issued call request. This notice does not seek new contractors and is solely informational. The work is set within Oregon, with the Department of Agriculture’s Forest Service overseeing the project, and responses are due by July 7, 2025.

General Info

Demolition and replacement of two trail bridges in Deschutes Forest, $100K-$250K, small businesses only.

Agency

Department Of Agriculture → Csa Northwest 6 Usda-fs

Contract Value

$180,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

OR, 97701, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Northwest 6 Usda-fs
Contacts1 person available
OfficePortland, OR, 972042829, USA
Organization / Agency
Department Of Agriculture → Csa Northwest 6 Usda-fs
Office AddressPortland, OR, 972042829, USA

Full Description

Show more

This project involves:


This work is taking place on the Deschutes National Forest.  The work entails the demolition of two existing Multi-Log Stringer Bridges measuring 36 feet and 25 feet in length. The scope includes furnishing, fabricating, and treating structural timber, along with all required yard lumber to complete the bridge system, followed by delivery and installation at the existing site. The contractor shall provide all necessary anchoring and fastening hardware, structural steel, bearing shoes/pads, stringers, sills, timber curbs, timber railings on both sides, backwall systems, blocking, running planks, and geocell foundation systems for the construction of two new trail bridges—a 41-foot Glulam Stringer Trail Bridge and a 31-foot Longitudinal Glulam Deck Panel Trail Bridge. The East Cultus Lake Trail Bridge will be constructed using a newly fabricated Glulam Trail Bridge supplied by the contractor, while the Todd Meadow Nordic Trail Bridge will be built using a newly furnished Longitudinal Glulam Deck Panel Trail Bridge, also provided by the contractor. Construction at the East Cultus Lake Trail Bridge will include Overlapping Step Systems and borrow material will be placed for the approaches to the Todd Meadow Nordic Trail Bridge. The contractor is responsible for furnishing the sawn timber necessary for constructing Overlapping Step Systems.


The magnitude of this construction project is between $100,000 and $250,000. 


THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES.


This notice is for the issuance of a blanket purchase agreement call request on the Trail Construction and Maintenance BPA 1240BJ21Q0015.


THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA.


 WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME.  

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS