This Sources Sought opportunity from Department Of The Army was posted on June 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the Norfolk CSRM Program, specifically focusing on the construction of the Phase 1A Floodwall in downtown Norfolk, Virginia, extending from the Berkley Bridge to the Campostella off-ramp. This project is part of a larger citywide effort to enhance flood protection and is divided into multiple phases, with Phase 1A involving several key acquisitions. The scope of this particular contract includes the construction of a floodwall featuring various structural elements such as bin walls, L-shaped walls supported by H-piles, T-walls, a wetland living shoreline, and sheet pile tieback walls. Additionally, the project involves installing a double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and ensuring all work complies with access and security requirements. The contract, identified as a SATOC (Single Award Task Order Contract) under the solicitation number W9123625S13MA, is scheduled for posting on June 5, 2025, with responses due by June 19, 2025. It is managed by the U.S. Army Corps of Engineers, Norfolk District, and is categorized under NAICS code 237990, which covers other heavy and civil engineering construction. The primary points of contact are Raven D. Sasser and Candace C. Lotomau, both from the U.S. Army Corps of Engineers. The project emphasizes adherence to security protocols and environmental considerations, with additional details available through the provided online link.
General Info
Agency
Place of Performance
Norfolk, VA, 23510, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A – Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton’s Creek Pump Station (DBB).
This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton’s Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer.
See attached document for addiitional information.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS