Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Design and Build HVAC Syatem

Active
AG-9AB5-S-17-0077Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the design and construction of a new, dedicated HVAC system for the 24-hour Federal Interagency Communications Center (FICC) dispatch unit located within the San Bernardino National Forest Supervisor's Office. The existing dispatch cooling is currently integrated into a larger system serving the building but needs to be fully isolated to meet the unique demands of this continuously operating center. The new HVAC system will be independent, energy-efficient, and designed to operate 24/7 year-round, interfacing with the existing Energy Management System for remote operation. Major components will be rooftop-mounted, with all interior equipment installed above drop ceilings and within existing chases to minimize disruptions. The contractor is responsible for the full scope of work, including design, permitting, demolition, installation, control integration, and system testing and balancing, while ensuring compliance with all relevant codes and regulations, including environmental and safety standards. The project follows a two-phase Design-Build procurement process, with an initial pre-qualification phase to shortlist qualified contractors based on technical approach, past performance, and team qualifications, followed by a second phase for detailed design and cost proposals. Construction must carefully accommodate the building’s ongoing operation, with restricted work hours and a narrowly defined window for in-area construction during the relocation of dispatch personnel. The contractor must maintain safety protocols, emergency communication plans, and provide a 12-month maintenance agreement post-construction, including EMS support. The target budget ceiling is approximately $210,000, with requirements that all design and structural work be performed or reviewed by registered professionals in California, and equipment compliant with the Buy American Act. This contract is set aside for small businesses and is managed by the USDA Forest Service with points of contact available for coordination throughout the procurement and construction phases.

General Info

Design and construct a dedicated, energy-efficient 24/7 HVAC system for FICC dispatch, USDA Forest Service.

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

San Bernardino National Forest Headquarters 602 S. Tippecanoe Ave, San Bernardino, CA 92408, SAN BERNARDINO, CA, 92408, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhasePresolicitation
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service
Contacts2 people available
OfficeNEVADA CITY, CA, 95959, USA
Office AddressNEVADA CITY, CA, 95959, USA
Contacts
William E. HarperContracting Officer
Joshua DireenAssistant Forest Engineer

Full Description

Show more
NOTE: The full solicitation and planning documents will be posted no later than 15 July 2017. A mandatory site visit will be required on a date to be determined. This project includes the complete design and construction of a new dedicated HVAC system for the 24-hour Federal Interagency Communications Center (FICC) dispatch unit located at the San Bernardino National Forest Supervisor's Office (Headquarters). The Dispatch cooling system is currently part of a larger cooling system in the San Bernadino Forest Supervisor's Office and should be completely isolated from the current system. The Dispatch Center is "center-core" on the first floor of the current two-story building, and is a 24-7 operation generating heat that makes usage uncomfortable and difficult to manage with the operating parameters of the larger system We envision major cooling components to be placed on the roof of the facility with interconnecting though an existing vertical access shaft to the first floor. The Contractor shall provide all design, labor, materials, and equipment to complete the project. This includes any and all incidental work and materials necessary for the completion of a new HVAC system including, but not limited to, demolition, disposal, plumbing, electrical, concrete, patching, painting, framing, control integration, testing, and balancing. The Contractor is responsible for securing all permits, fees, and requirements from state and local county offices. PART I - THE SCHEDULE SECTION B - SUPPLIES OR SERVICE AND PRICE/COST Design Build - FICC HVAC System, San Bernardino National Forest Item No. Description Est Qty Unit Unit Price Amount 001 Design Build HVAC & Electrical Systems Price proposal is NOT required in this Phase one solicitation. The Schedule of Items shall be determined in the pending Phase II solicitation. DESCRIPTION OF WORK 1. SCOPE OF WORK (SOW): This project includes the complete design and construction of a new dedicated HVAC system for the 24-hour Federal Interagency Communications Center (FICC) dispatch unit located at the San Bernardino National Forest Supervisor's Office (Headquarters). The Contractor shall provide all design, labor, materials, and equipment to complete the project. This includes any and all incidental work and materials necessary for the completion of a new HVAC system including, but not limited to, demolition, disposal, plumbing, electrical, concrete, patching, painting, framing, control integration, testing, and balancing. The Contractor is responsible for securing all permits, fees, and requirements from state and local county offices. 2. HVAC SYSTEM DESIGN PARAMETERS: The new HVAC system shall meet the following requirements: a. The new FICC dedicated HVAC system shall focus on energy efficiency while meeting the heating and cooling demands of the FICC area 24 hours / day, 365 days / year. The new system shall also be able to operate independently of the Headquarters existing centralized HVAC system while interfacing with the existing Energy Management System (EMS) to allow for remote operation and management of the dedicated FICC HVAC system. b. Contractor shall size, select, and configure the heating, cooling, and primary air distribution equipment for the FICC area. Selected equipment shall meet the applicable requirements of ASHRAE 90 and CA Title 24, latest editions. c. The Contractor shall make their own field measurements to verify any dimensions shown on government furnished drawings. Verification of existing construction shall be a part of this service. The Contractor shall perform all field reconnaissance, surveys, and site investigations, including travel and work required to obtain engineering information and design data for the accomplishment of the design documents of the project. d. All exterior HVAC equipment shall be located on the roof within the confines of the existing mechanical screen while meeting all required service clearances as required by the manufacturer and all applicable codes. A structural evaluation and design (drawings and calculations) must be performed and stamped by a licensed Structural Engineer registered in the state of California for all roof mounted equipment. All roof mounted equipment must incorporate vibration isolators. e. All interior HVAC equipment and lines shall be located in the areas above the existing drop ceiling and within existing pipe chases while meeting all required service clearances as required by the manufacturer and all applicable codes. f. All selected equipment shall meet the provisions of the Buy American Act. g. Final design calculations and drawings shall be performed and stamped by a Professional Mechanical engineer registered in the state of California. h. HVAC system shall also meet these parameters (alterations to these parameters may be allowed if a significant energy savings can be demonstrated to the Government during the design process): - Variable Refrigerant Flow (VRF) system - Ducted indoor fan units with completely new sheet metal ducting (supply, return, and outside air) located above drop ceiling - New ducting does not utilize or interfere with any existing ductwork - Existing HVAC system and ductwork shall remain in service during standard operating hours after project completion - New HVAC system shall operate only during non-standard business hours (after hours, weekends) 3. CONSTRUCTION PARAMETERS: a. All design and construction shall conform to all current ADAAG, International, National, State, and local Building, Plumbing, and Mechanical Codes, applicable NFPA Codes, NEC electrical code, applicable ASHRAE guidelines, the Government approved design, and accepted construction practices. b. The building will be occupied during construction. The Contractor shall plan the work layout and schedule to minimize impact to and interruption of operation activities at the site. Work requiring the HVAC system to be shut down shall be scheduled for November - December in order to minimize impact on the building and occupants. All work scheduling shall be closely coordinated with the Contracting Officer's Representative (COR). c. Construction activities within the FICC dispatch area shall only be authorized from November 6, 2017 to February 16, 2018, and shall be limited to a continuous 2-week construction period for substantial completion due to the relocation of FICC personnel. These construction activities shall be scheduled 60 days in advance with the COR. This continuous 2-week construction period shall not span over the following dates: November 21 to 26 and December 20 to January 3. In the event of a Forest Emergency Incident, the Contractor shall stop all work within the FICC dispatch area until the COR allows work to resume. All other site work outside of the FICC dispatch area is not limited to this 2 week period and may take place during normal work hours. d. Work Hours: Work hours are from 8:00am to 5:00pm, Monday through Friday. Weekend and Federal Holiday equipment work is not allowed at any time during construction. See this solicitation for further work hour limitations on construction activity within the FICC dispatch area. e. Safety, Emergency Communications and Evacuation: The Contractor shall be responsible for the safety of the Contractor's employees, Subcontractor's employees, Government employees associated with the project, and any visitors to the site both Government and private. The Contractor shall submit a project safety plan to the Contracting Officer for review prior to commencement of work. The project safety plan shall comply with the appropriate California OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan. f. Contractor shall be responsible for the demolition and proper disposal of all equipment and material removed from service as a result of this contract. 4. MAINTENANCE SERVICE AGREEMENT: The Contractor shall provide a 12-month maintenance agreement beginning on the date of final inspection. The agreement shall include manufacturer's recommended maintenance activities for the installed HVAC system and components. It shall also include 12 hours of time available for EMS programming and operational assistance throughout the year to adjust the operational parameters of the system to actual conditions. PROJECT LOCATION Work areas are located in San Bernardino County, CA at the San Bernardino National Forest Headquarters office: 602 S. Tippecanoe Ave, San Bernardino, CA 92408. INSTRUCTIONS FOR SUBMISSION OF OFFERS AND OTHER INFORMATION PROPOSAL SUBMISSION REQUIREMENTS INTRODUCTION Contract Format and Process This is a Two Phase Contract, herein also referred to as a Design-Build (D-B) contract for the design and construction/replacement of the existing HVAC & Electrical Systems. The Design-Build process will have two distinct phases. Phase 1 will be the pre-qualification process, where the Government will select ("short list") up to three to Four contractors on the basis of their qualifications and preliminary proposal(s). Only the selected contractors will then qualify for the Phase 2 process. In Phase 2 of the procurement procedure, Offerors will be given the opportunity to offer their preliminary design and/or technical approach and cost proposals. Final selection and basis for award of the Design-Build contract will be based on the "Best Value Approach". The best value approach provides the opportunity to select an offeror who is not necessarily the lowest-priced or the highest technically-ranked. If awarded the contract, the Offeror shall provide and complete all necessary and required design and construction documents, and complete construction in compliance with these requirements. General Project Description Work items will include, but are not limited to the following: See DESCRIPTION OF WORK QUALIFICATIONS FOR DESIGN-BUILD FIRM OR TEAM Any single firm or association of firms may submit a proposal. Individual firms may participate in more than one proposal by entering into more than one such association. For the purpose of this solicitation, no distinction is made between formally organized design-build entities and project-specific design/build association. Both are referred to as the design/build offeror (or simply "Offeror"), or the design/build contractor (or simply "contractor"), after award of a contract. The Offeror, or offerors subcontractor, must have a minimum five years of experience in design and construction of residential and/or commercial HVAC systems. The design of architectural, structural, mechanical, electrical, civil, structural or other engineering features of the work shall be accomplished or reviewed and approved by architects or engineers registered to practice, in the particular professional field involved. Contractor performing construction work must possess a current and valid C20, "Warm-Air Heating, Ventilating and Air-Conditioning Contractor," license to perform the applicable contract work issued by the State of California. Design documents must be prepared and stamped by a Professional Engineer registered in the state of California to perform the applicable design. COST LIMITATIONS The target ceiling for contract award for design and construction is approximately $210,000. The Government cannot guarantee that additional funds can be made available for award. Offerors are under no obligation to approach this amount. REQUIRED TECHNICAL DATA FOR PROPOSAL SUBMISSION Offerors are advised that the required data will be utilized for review and evaluation and used for determination of a "Quality Rating" by a Source Selection Evaluation Board (SSEB) and that all data submitted for consideration under this proposal will be reviewed only for the purposes required for evaluation and award. The Government will not make assumptions concerning the Offeror's intent, capabilities, facilities, or experiences. Clear identification is the sole responsibility of the Offeror. PROPOSAL PREPARATION - Phase 1 In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly indicate the material, equipment, methods, functions, schedules and price proposed. Instructions for the preparation and organization of each proposal are included herein. The proposal shall be submitted as summarized below and as required by the specifications. Format Proposals shall be labeled in a manner to afford easy identification from a Table of Contents. Font size shall be 12 point. Each page shall be identified with the appropriate page number. Sheet size of the proposal contents shall be 8-1/2 by 11 inches. Legibility, clarity, coherence, and the contents are important. The Offeror shall not submit verbatim sections or attachments of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection. A cover sheet identifying the Offeror and the project shall be provided. The second sheet(s) shall be a Table of Contents. Materials submitted but not required by this solicitation (such as company brochures and equipment lists) shall be relegated to appendices. Description of Evaluation Criteria Technical proposal shall include the information as described below and shall be presented in the sequence listed. ELEMENTS OF PROPOSAL - Phase 1 Evaluation Criteria Proposals submitted in accordance with the Phase I solicitation, will be evaluated using the three (3) Phase I evaluation factors listed below in descending order of importance. Technical approach (2 pages maximum): Describe Offeror's understanding and general approach for the design and construction of this project. Past performance: (maximum 10 pages). Describe 3-5 similar past projects within the last 5 years and at least 1 similar past project within the last 3-5 years. Each past project should have a picture of the project, a short narrative describing its relevance and/ or similarity to one or more of the attributes in the above technical approach section, and client contact information (whom we reserve the right to contact for reference). Past projects should be roughly within a $500,000 to $1,000,000 range. Each past project need not have been done by the team as a whole, but to have been done by team members who will have a substantial involvement in the present project, and the member(s) involved in the past project need to have substantially contributed to the past project (e.g. the prime team member, the civil engineer, and/ or the general contractor). The Offeror shall be responsible for providing current information regarding project experience, i.e. names and phone numbers. If experience cannot be verified due to incorrect phone numbers or contacts, the project experience will not count. Technical qualifications of members and team (10 pages maximum): (a) At a minimum identify the following team members, and provide brief technical qualifications for each: civil, licensed plumber and electrician and general contractor. The brief technical qualifications should include: Education, licenses, and specialized experience of key staff that will be assigned to lead part(s) of this project. Standard Form 330 may be used, but is not required. (b) Discuss the capability of the group to perform as a team. Include actual or proposed legal organization, and an organizational chart depicting the role and responsibilities of the team members.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe sections in both the Administration Building and King Hall. All work must conform to the Massachusetts State Plumbing Code and International Plumbing Code, utilizing new commercial-quality materials suitable for hydronic heating service. The contractor is responsible for removing all debris and repairing any facility damage caused during performance at no additional cost. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid validity period of at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, Massachusetts licensing, a W-9, a signed ETR Vendor Acknowledgement Form, and certificates of insurance. This is an SBA set-aside opportunity for various small business categories. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The project is subject to federal regulations, including the Davis-Bacon Act, Service Contract Act, and specific FAR clauses regarding anti-lobbying and debarment. Performance bonds are required for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning services at the Miami Job Corps Center in Florida. The period of performance runs from November 1, 2026, to October 31, 2027. The selected vendor will provide emergency HVAC repairs, with pricing required for non-emergency daytime services (8:00 am to 4:30 pm) as well as emergency, weekend, and holiday rates. As a federally funded facility, the Center is entitled to GSA pricing. Award decisions will be based on the most responsible bidder, considering cost, licensure, experience, and insurance capabilities. Eligible bidders must be small businesses or certified socioeconomic categories, including VOSB, SDVOSB, WOSB, and HUBZone. Mandatory requirements include a valid Unique Entity ID (UEI), active SAM.gov registration, and all necessary Florida state business and employee licenses. Vendors must maintain Workers Compensation, Automobile Liability, and Comprehensive General Liability insurance of at least $1,000,000 per occurrence. The contract is subject to the Service Contract Act (Wage Determination No. 2005-2248) and the Davis-Bacon Act, with a minimum wage of $13.65 per hour applicable through December 31, 2026. Bids must be submitted on company letterhead by October 23, 2026, and include a W9, Vendor Questionnaire, Authority to Commit, and a certificate of insurance. Payment terms are NET 30 days. Personnel performing work on-site must adhere to strict security protocols, including searches and a prohibition on fraternization with students and staff. All deliveries must be coordinated through the Center's security personnel.
Miami Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the removal of existing equipment and the installation of a new 5-ton condenser with a suitable pad, a new furnace, a 5-ton evaporator coil, a fused electrical disconnect, an electrical whip, and a new condensate drain line. The contractor is responsible for providing all labor, materials, and supervision, ensuring the system is fully operational and compliant with applicable codes. Key deliverables include two sets of operation and maintenance manuals and manufacturer and installer warranties. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by October 28, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds for 100 percent of the contract price from a surety with at least an A- rating. This opportunity is set aside for small businesses under NAICS 238220. Award decisions will be based on overall best value. Compliance requirements include the Davis-Bacon Act for prevailing wages, OSHA safety standards for personal protective equipment, and various Federal Acquisition Regulations, including those regarding first-tier subcontractor information and the submission of form SF 1413. Awarded contractors must provide a Unique Entity ID (UEI) number and complete the MTC Supplier Self-Certification packet. Payment will be made via progress payments based on percentage completion, utilizing AIA Document G702 and G703 or equivalent forms.
San Diego Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes the inspection, repair, and replacement of various components across eight exhaust fans, specifically addressing failed louver actuators, motor replacements, selector switch repairs, and the relocation of a thermostat. Contractors must provide detailed line-item pricing for each fan, separate pricing for system-wide component replacements, and detailed costs for labor and materials. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to a single responsible offeror based on technical acceptability and the lowest price. Key requirements include compliance with the Federal Acquisition Regulation, Davis-Bacon Act labor standards, and OSHA and EPA regulations. Contractors must be registered and licensed in the State of Kentucky, provide proof of insurance, and demonstrate the ability to secure performance and payment bonding. Administrative requirements include the submission of weekly certified payroll with every invoice and the provision of Materials Safety Data Sheets for all products used on site. The project involves a substantial completion process requiring a walk-through and final acceptance inspection. Quotes must be submitted electronically to the purchasing agent by October 30, 2026, and must include a completed New Vendor Profile and W-9 for any subcontractors.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
Furnace Replacement
Solicitation # 26-17
Management & Training Corporation (MTC), operator of the Tongue Point Job Corps Center in Astoria, Oregon, is soliciting bids for a fixed-price, lump sum contract to replace furnaces and thermostats in three staff houses. The project involves Quarters F (3,786 sq/ft, propane), Quarters P (1,100 sq/ft, natural gas), and Quarters Q (2,280 sq/ft, propane). Required equipment must be Carrier Comfort Series or an equivalent household good grade with at least a 96% efficiency rating, sized at approximately 80,000btu. Installations must include new transitions to existing ducting, gas regulators, electrical and condensate pump kits, and intake/exhaust venting. A lifetime warranty on the heat exchanger and a minimum 10-year warranty on parts are mandatory. The estimated price range for this solicitation is between $0 and $25,000, with bids due by October 21, 2026. This is a small business set-aside opportunity under NAICS code 238220. Award decisions will be based on overall best value. Contractors must comply with the Davis-Bacon Act and applicable prevailing wage determinations, providing certified payroll weekly. Bid and performance bonds are only required for bids equal to or exceeding $25,000. Submission requirements include a signed MTC bid form, a detailed cost breakout on company letterhead, a Unique Entity Identification number, and a completed supplier self-certification packet. Final acceptance is contingent upon functional testing, the submission of operation and maintenance manuals, and a final inspection.
Tongue Point Job Corps

POSTED

about 6 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of the existing dry system distribution piping network and failing air compressor across the Men's Dormitory (Building CM), Women's Dormitory (Building CW), and Recreation Building (Building D). The selected licensed fire sprinkler contractor must eliminate system leaks and install a new compressor sized according to NFPA standards to prevent equipment short-cycling. All work must adhere to NFPA 25 (2023 Edition) and local, state, and national codes, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be based on a mandatory site visit. Evaluation is based on overall best value and bidder responsiveness. For bids totaling $25,000 or more, a bid bond of 20% of the base bid is required at submission, and the awarded contractor must provide performance and payment bonds from an A-rated surety within five business days of the Intent to Award. Compliance requirements include adhering to Davis-Bacon prevailing wage rates for Idaho, submitting weekly certified payroll reports, and providing a 12-digit UEI number. Additionally, first-tier subcontractors with awards exceeding $45,000 must disclose debarment status per FAR 52.209-6, and contracts valued at $40,000 or more are subject to FFATA reporting.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall in Kentucky. The scope of work requires the contractor to furnish and install two 4-ton Trane split systems with a minimum 17 SEER rating, two 95% AFUE high-efficiency gas furnaces, and matching indoor evaporator coils using R-454B refrigerant. Additional requirements include the installation of a Honeywell Pro 8000 programmable thermostat, new refrigerant line sets, condensate drain piping, and pumps. The project must be completed within 45 days of award, and the contractor is responsible for all inspections, testing, and providing necessary operating and maintenance manuals. The contract will be awarded to the responsible offeror who is technically acceptable and provides the lowest price. To be considered, bidders must be registered and licensed in the State of Kentucky, verified through the SAM portal, and provide a minimum 90-day bid guarantee along with proof of ability to secure performance and payment bonding. Compliance with the Davis-Bacon Act and Certified Payroll Wage Rate requirements is mandatory, with weekly certified payroll and a signed Statement of Compliance required for invoice acceptance. All work must adhere to local codes, manufacturer specifications, OSHA, and EPA regulations. Quotes are due by October 30, 2026, and must include detailed labor and materials costs, a W-9, and a New Vendor Profile.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work includes the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or equivalent, including all necessary ducting, electrical, gas, thermostat wiring, flexible hoses, and pressure valves. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all materials used in the plenum are plenum-rated. All work must comply with NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes, with performance scheduled between 7:00 am and 4:00 pm, Monday through Friday. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding $100,000.00 require payment and performance bonding for 100% of the contract value. Submissions must include a safe work process, detailed costs for labor and materials, equipment cut sheets, warranty information, and a requested payment schedule. Final deliverables include the provision of operation manuals to the Facility Manager upon project completion.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238220
New
WOJC – Buried Domestic Hot Water (DHW) Pipe Repair
Solicitation # wojc-buried-domestic-hot-water-dhw-pipe-repair-0
Education and Training Resources is seeking quotes for a subcontracting opportunity to repair buried domestic hot water piping at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work involves the excavation, location, removal, and repair of compromised piping up to 4 inches in diameter at two specific locations: behind Singletary Hall and on the east side of Harris Hall. The selected contractor must provide all labor, materials, and equipment, ensuring work adheres to industry standards, OSHA regulations, and the National Fire Protection Association's Life Safety Code. Deliverables include a one-year equipment and workmanship warranty and the submission of weekly certified payroll reports. Interested bidders must submit a detailed cost breakdown via a Bid Sheet, a proposed service schedule, and proof of required Massachusetts licensing and credentials by November 6, 2026. Mandatory administrative documentation includes a W-9, Vendor Acknowledgement Form, Certificates of Insurance, and an active SAM.gov registration with a Unique Entity ID. This solicitation is open to various small business designations, including VOSB, SDVOSB, WOSB, and HUBZone. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Depending on the final project value, contractors may be required to provide payment and performance bonds for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details
NAICS: 238220
New
CBP7792 Cafeteria Hot Water Heater Replacement
Solicitation # CBP7792
Management & Training Corporation (MTC) is soliciting bids for a fixed-price lump sum subcontract to replace a failing commercial natural gas-fired water heater at the Sierra Nevada Job Corps Center in Reno, Nevada. The project requires a licensed plumbing contractor to isolate, remove, and dispose of the existing unit and install a new 125-gallon commercial-grade water heater, specifically a Bock Model OT300N-A-H20 or an approved equivalent. The contractor is responsible for all labor, materials, permits, and testing to ensure reliable hot water service. To minimize cafeteria disruptions, utility-interrupting work must be performed during approved off-hours, such as weekends or after 8:00 PM. Bids are due by October 27, 2026, and will be evaluated based on overall best value, considering price, quality, delivery schedule, and relevant experience. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a W-9, and a Supplier Self-Certification form. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety. Compliance requirements include adherence to federal, state, and local codes, as well as Davis-Bacon Act prevailing wage rates per Wage Determination NV20250040. Contractors must provide a Unique Entity ID (UEI) and, for first-tier subcontracts exceeding $45,000, disclose debarment or suspension status under FAR 52.209-6. Final payment is contingent upon the submission of a Notice of Final Completion, certified payroll reports, a release of liens, and two sets of Operation and Maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
WOJC - Amana PTAC Coil Replacement
Solicitation # WOJC - Amana PTAC Coil Replacement (Administration Building)
Education and Training Resources is seeking quotes for a subcontracting opportunity to replace leaking coils in two Amana Packaged Terminal Air Conditioner (PTAC) units at the Westover Job Corps Center Administration Building in Chicopee, Massachusetts. The units are located in the first-floor conference room and the third-floor CTR classroom. The selected contractor must provide all labor, materials, and supervision to recover refrigerant per EPA Section 608, install genuine Amana OEM or approved equivalent coils, and verify the operational status of cooling, heating, airflow, and condensate drainage. A one-year equipment and workmanship warranty is required, and all work must comply with the International Mechanical Code, Massachusetts state and local codes, and OSHA safety standards. Bids are due by October 30, 2026, and a mandatory site walkthrough is scheduled for October 22, 2026. To be considered, bidders must submit a completed bid sheet with a detailed cost breakdown, a proposed service schedule, Massachusetts licensing and credentials, certificates of insurance, and a completed vendor packet including a W-9 and Vendor Acknowledgement Form. The winning bidder must maintain an active SAM.gov registration and a Unique Entity ID (UEI). Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Depending on the project value, bonding requirements may apply: a 100 percent payment bond for projects between 35,000 and 150,000 dollars, and both 100 percent performance and payment bonds for projects exceeding 150,000 dollars.
Westover Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details

More opportunities from Department Of Agriculture → USDA Forest Service

Same awarding agency

NAICS: 621111
New
Federal
Boxelder JCC Medical Services
Solicitation # 1282A727Q0004
Solicitation 1282A727Q0004 is a Request for Quotation issued by the USDA Forest Service for on-site medical services at the Box Elder Job Corps Center in Nemo, South Dakota. This 100% Small Business Set-Aside seeks a licensed medical professional, such as a Physician, Nurse Practitioner, or Physician Assistant, to provide basic health services for students aged 16 to 24. The scope of work includes initial physical intakes, examinations, assessments, treatment, issuance of prescriptions for controlled and non-controlled medications, immunizations, chronic care management, and the coordination of medical referrals and hospitalizations. The requirement consists of 400 annual hours, typically delivered one or two days per week, and must comply with OSHA, HIPAA, and American Medical Association guidelines. The contract is structured as a Firm Fixed Price award featuring a base year from December 15, 2026, to December 14, 2027, with four subsequent option years and a potential six-month extension. To be considered responsive, offerors must submit pricing for all CLINs, a technical proposal including a completed Quoter’s Questionnaire, and past performance data from the last three years. Key personnel must provide current resumes, a valid DEA license, and proof of medical liability insurance of at least $1 million. Award will be based on the best value to the Government, evaluating technical capability and past performance. Quotes are due by November 5, 2026, and must be submitted in Microsoft Word or Adobe PDF format.
Offices of Physicians (except Mental Health Specialists)

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
Federal
4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming
Solicitation # 1240LT26Q0109
Solicitation 1240LT26Q0109 is a Request for Quotation issued by the USDA Forest Service for the Buckboard Marina Water System Improvements located in the Ashley National Forest, Wyoming. This total small business set-aside project, under NAICS 237110, has an estimated magnitude between 1 million and 5 million dollars. The scope of work involves comprehensive water system upgrades, including the installation of booster pumps, a pump house structure, electrical transformers, power poles, and extensive HDPE piping, as well as asphalt surface repairs and the construction of a waterline service road. The project is subject to Davis-Bacon wage determinations and requires performance and payment bonds. The government will award the contract based on the lowest price technically acceptable criteria, evaluating offerors on price, technical approach, and past performance. Successful contractors must commence work within 10 calendar days of the notice to proceed and complete all work, including final cleanup, within 240 calendar days. Following two amendments, the final deadline for quote submission is November 4, 2026. Submissions must include a signed SF1442, a completed Schedule of Items, a technical proposal detailing capabilities and sequencing, and a fully executed bid guarantee.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 15 days
View Details
NAICS: 513210
New
Federal
Operational Loads Monitoring System (OLMS)
Solicitation # RFI468
The USDA Forest Service is seeking information regarding commercially available software and system support services for the Operational Loads Monitoring System (OLMS). This web-based application is critical for analyzing aircraft maneuver loading and turbulence data to monitor the structural health and safety of aerial firefighting aircraft and determine necessary inspection intervals. The scope of work includes providing software licensing, performing maintenance and security updates for middleware such as Apache, Tomcat, or PHP, and ensuring 99 percent system availability. The government is interested in Commercial Off the Shelf (COTS) or FedRAMP certified Software as a Service (SaaS) solutions that comply with Section 508 accessibility standards and federal security protocols. The anticipated contract structure consists of a base period with up to four one-year option periods. Performance will primarily occur at the contractor's site during standard Mountain Time business hours, though after-hours support is required for emergency patches and critical troubleshooting. Administrative requirements include electronic invoicing via the Department of Treasury’s Invoice Processing Platform (IPP) and strict adherence to sensitive but unclassified data protection standards, including background investigations for personnel. This current effort is a sources-sought Request for Information (RFI468) under NAICS code 513210 to identify industry capabilities and gather feedback on the draft Performance Work Statement.
Software Publishers

POSTED

4 days ago

DEADLINE

in 7 days
View Details
NAICS: 561320
New
Federal
Center Support Services Mental Health Consultant for Pine Ridge JC
Solicitation # 12318727Q0003
The USDA Forest Service is soliciting a Total Small Business Set-Aside contract under NAICS code 561320 for a Center Mental Health Consultant to provide on-site mental health care services at the Pine Ridge Job Corps Civilian Conservation Center in Chadron, Nebraska. The scope of work focuses on the early identification and diagnosis of mental health issues, basic care, and education to help students overcome barriers to employability. Key responsibilities include performing applicant file reviews, initial intake assessments, treatment plans, student support groups, and staff training. The consultant must collaborate with center physicians and substance abuse counselors and provide monthly reports to the Center Director and Health and Wellness Manager. All services must adhere to Federal laws, OSHA and HIPAA requirements, American Psychology Association guidelines, and Department of Labor standards. The contract is structured with a base year running from November 1, 2026, to October 31, 2027, with three subsequent one-year options extending through October 31, 2030. Each year is estimated at 520 hours of service. Award will be based on best value, evaluating technical capability and past performance alongside firm-fixed pricing. The contractor must maintain professional liability insurance of at least 1 million dollars per occurrence and 3 million dollars aggregate. Performance will be monitored by a Contracting Officer Representative through a Quality Assurance Surveillance Plan, with specific acceptable quality levels for personnel fill rates and resource availability. Proposals are due to Contracting Officer Darlene Chase by October 26, 2026.
Temporary Help Services

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 115310
New
Federal
MARKET INDEX PRICES FOR USE IN FOREST MANAGEMENT
Solicitation # 12318726Q0224
The USDA Forest Service is seeking a firm-fixed-price requirements contract for the purchase of market index price data to ensure fair and transparent valuation of stumpage for timber sales west of the 100th meridian. The contractor will be responsible for developing an index log and generating quarterly composite index prices in dollars per thousand board feet for seven species groups. Key technical requirements include ensuring indices are representative of Western sawmill production with a sampling error of no more than 5 percent at a 95 percent confidence level, based on at least 50 percent of the lumber volume produced for each species group between January 2027 and December 2028. The period of performance consists of a 12-month base period from November 1, 2026, to October 31, 2027, with four subsequent one-year option periods and a potential six-month extension. Award will be based on best value, with technical capability, approach, and past performance weighted more heavily than price. Deliverables include a final index log update methodology due by January 1, 2027, and quarterly index prices starting on the same date. All electronic submissions must be Section 508 compliant and submitted via the US Treasury Invoice Processing Platform for payment. Proposals must be submitted in separate technical and price volumes by November 2, 2026.
Support Activities for Forestry

POSTED

6 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS