Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Design/Build - Industrial Wastewater Treatment Facility

Active
27-011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Town of Queen Creek, Arizona, is soliciting a Design/Build team for the development of a new wastewater treatment facility under solicitation number 27-011. The project is centered on managing municipal and industrial wastewater, with a specific focus on the first phase: the construction of an Advanced Treatment Facility (ATF) dedicated to industrial wastewater from the LG Energy Solution (LGES) manufacturing facility. The primary objective is to recycle wastewater to minimize the consumption of potable water and reduce reliance on groundwater. The facility is expected to be located within three miles of the LGES site, with a goal of being fully operational by January 1, 2032. The procurement process utilizes a point-based evaluation of Statement of Qualifications (SOQ) submittals, with a maximum of 1000 points. The Town may shortlist three to five respondents for interviews to determine the final ranking. Selected firms must demonstrate the ability to bond and insure, maintain a strong safety record, and provide comprehensive design, permitting, construction, startup, and commissioning services. The contract structure includes a Guaranteed Maximum Price (GMP) and a 10 percent retainage on construction costs until final acceptance. Key milestones include an early design contract award in 2027, full design by July 1, 2027, and full construction funding by July 1, 2028. All proposals must be submitted via the Town's e-Procurement portal by the December 8, 2026, deadline.

General Info

Queen Creek seeks a Design/Build team for an industrial wastewater treatment facility.

Documents

8

Exhibit C - Insurance Requirements

PDF, High priority: read this firstspecifications
High

Queen Creek LG Assistance and Infrastructure Evaluation - Preliminary Design Report

PDF, High priority: read this firstspecifications
High

RFQ 27-011 Industrial Wastewater Treatment Facility

PDF, High priority: read this firstrfq
High

Town of Queen Creek Design/Build Agreement

PDF, High priority: read this firstcontract-document
High

Attachment 1 Non-Collusion Affidavit

PDF, Low priority1 page · non-collusion-affidavit
Low

Attachment 4 Vendor Registration Form Taxpayer ID

PDF, Low priority1 page · vendor-registration-form
Low

Certification Regarding Debarment Attachment

PDF, Low priority2 pages · certification
Low

RFQ 27-011 Past Performance Reference Form

PDF, Low prioritypast-performance
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → CIP
Contacts1 person available
OfficeQueen Creek, AZ, 85142, USA
Organization / AgencyArizona → CIP
Office AddressQueen Creek, AZ, 85142, USA
Contacts
Michelle HoneaProcurement Officer, Senior

Interested Companies (35)

SwabackScottsdale, AZ
Control SystemsScottsdale, AZ
Varitec Controls and Service SolutionsPhoenix, AZ

See All 35 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Town of Queen Creek, Arizona (Town) is engaged in long-term planning to develop a treatment facility to manage both municipal and industrial wastewater. Over the last several years, the Town has been working with LG Energy Solution (LGES) to develop a new manufacturing facility and to account for anticipated population growth over the next 20 years. To better align wastewater treatment and local water resource needs, the Town is interested in developing a new, local wastewater treatment facility. The primary goal of the project is to recycle wastewater to minimize potable water consumption and reliance on groundwater. Additionally, development by the Arizona State land Department (ASLD) may include future industrial wastewater sources, providing an opportunity for process water recycling to further drive growth and reduce reliance on traditional potable water sources. This project will focus on planning elements for the Town's treatment facility including design and eventual construction of the first phase which is inclusive of the Advanced Treatment Facility (ATF) dedicated to industrial wastewater from the LGES manufacturing facility.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include traffic control, SWPPP, construction surveying, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is the prime contractor seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this opportunity are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and related site work including excavation, paving, and erosion control. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and MWBE compliance. Bidders must submit a signed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance with an A.M. Best rating of A-VII or better. Performance begins upon the issuance of a Notice to Proceed, and payments are processed monthly via applications for payment submitted to the Engineer, becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for a wide range of services, including infrastructure and utilities such as electrical work, pipe supply, and water truck services; material supply for aggregate, geotextile, and ready mix concrete; and professional services including surveying, QC testing, and biological services. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bids must be submitted via email or fax by October 28, 2026, at 2:00 PM and must remain valid for 120 days. All subcontractors are required to hold a valid California contractor license and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement. Additionally, Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursed up to a maximum of 3 percent. Primary contact for this solicitation is Veronica Garcia.
Flatiron Dragados Constructors, Inc.

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. Electrical and instrumentation work includes the installation of new systems, improvements to existing instrumentation, and the rehabilitation and replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and painting and coatings, are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details

More opportunities from Arizona → CIP

Same awarding agency

NAICS: 541380
SLED
Material Testing Services for Civil Construction Projects
Solicitation # RFP 27-006
The Town of Queen Creek's Capital Improvement Projects (CIP) Department is soliciting proposals under RFP 27-006 for a qualified civil construction quality assurance firm to serve as the Lab of Record. The selected firm will provide comprehensive material testing, laboratory services, and technical support for various infrastructure projects to ensure compliance with ASTM, AASHTO, MAG, and Town of Queen Creek standards. Key deliverables include testing for concrete, asphalt, and steel, as well as the provision of detailed test reports and a maintained inventory of calibrated equipment. Proposals must be submitted as an editable PDF via the OpenGov Procurement portal by October 27, 2026, at 3:00 PM. Award decisions will be based on the respondent's qualifications, experience, price, and conformity to the scope of services, with short-listed firms potentially undergoing interviews. Required submission documents include an executive summary, a detailed proposal covering staffing and approach, a signed W-9, a notarized non-collusion affidavit, and a certification regarding debarment. The successful contractor must meet strict insurance requirements for general liability, automobile, workers' compensation, and professional liability. Additionally, the firm must comply with federal immigration laws and Arizona's Public Records Act, while adhering to itemized invoicing requirements submitted within 30 days of service completion.
Testing Laboratories and Services

POSTED

29 days ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS