Design Build of the Trommel Screen No. 2 Replacement, Project No. RA27001

Active
IFB-JV-26-016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This design-build contract, identified as Project No. RA27001 and solicitation IFB-JV-26-016, entails the complete replacement of Trommel Screen No. 2 at the Inland Empire Regional Composting Facility. The scope of work encompasses the entire project lifecycle, including engineering, design, the demolition and disposal of the existing screen, and the installation of a new screening system. Additionally, the contractor is responsible for modifying or replacing associated conveyors, feed systems, electrical components, and SCADA integration to ensure a fully operational system. The project requires the provision of all necessary labor, materials, and equipment, concluding with testing, commissioning, operator training, and the delivery of record drawings and warranties. Managed by the Contracts and Procurement Department of the Inland Empire Utilities Agency in California, the contract requires a bid bond of 10 percent. The response deadline for this solicitation is October 7, 2026.

General Info

Design-build contract to replace Trommel Screen No. 2 at Inland Empire Regional Facility.

Agency

California → Contracts & Procurement Department of Inland Empire Utilities AgencyView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

12645 6th St, Rancho Cucamonga, CA 91739, CA, USA

Set-Aside

NONE

Documents

(1)

IFB-JV-26-016 Trommel Screen No. 2 Replacement

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contracts & Procurement Department of Inland Empire Utilities Agency
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Contracts & Procurement Department of Inland Empire Utilities Agency
View Agency Profile
Office AddressCA, USA
Contacts
Jordan VillalobosContact

Full Description

Show more
Scope: The Work consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, install, commission, start up and deliver a complete and fully functional project in accordance with Bid Documents. The Project is a Design-Build replacement of Trommel Screen No. 2, Project No. RA27001 at the Inland Empire Regional Composting Facility (IERCF). The Work generally includes engineering, design, demolition, removal and disposal of the existing Trommel Screen No. 2; furnishing and installation of a new trommel screening system; replacement or modification of associated conveyors, feed system, chutes, supports, platforms, stairs, walkways, access components, mechanical equipment, electrical systems, instrumentation, controls, and SCADA integration as required; testing, startup, commissioning, operator training, record drawings, warranties, and all appurtenant work necessary to provide a complete and fully operational system.
Bid Bond: 10.00%

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 Water Resource Recovery Facility (WRRF) Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, electrical work, and the supply of various piping materials. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. Because the project is partially financed through the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, it is subject to the American Iron and Steel (AIS) provisions, Davis-Bacon Related Acts, and DBE Program requirements. Kiewit is specifically seeking quotes from certified Disadvantaged Business Enterprises (DBE), including MBE, WBE, and SBE firms. Qualified bidders must possess a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, Kiewit emphasizes the importance of labor harmony and will consider bidders who demonstrate the ability to maintain positive human relations on the project.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. The project has an estimated bid value of 19,300,000.00 dollars and focuses on the design and removal of existing trailer-mounted electrodialysis reversal, slab-mounted membrane filtration, and reverse osmosis units. These will be replaced with new slab-mounted membrane filtration and reverse osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, has a response deadline of August 27, 2026, by 2:00 PM PT. Garney Pacific is seeking competitive quotes from subcontractors for various trades, including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project mandates the use of union labor and requires subcontractors to be prepared to provide a 100 percent payment and performance bond from a US Treasury listed surety company, though Garney will reimburse the bond premium. There is a strong emphasis on diversity and inclusion, with active solicitation for SLBE, ELBE, DBE, MBE, WBE, and SBE certified firms, including assistance for these firms in obtaining bonding lines of credit or insurance. Contracting will be based on Garney Standard Purchase Order and Subcontract forms.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 11 hours
View Details

More opportunities from California → Contracts & Procurement Department of Inland Empire Utilities Agency

Same awarding agency