Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on June 17, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build Services of Design & Construction for Decommission & Demolition of Building's 7 & 9 located on NIH's Main Campus NIHOF2014006

Closed
NIH2014006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 19 days

General Info

Agency

N/A

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Office of Research Facilities/Office of Acquisition 9000 Rockville Pike, Building 13, BETHESDA, MD, 20892, USA

Set-Aside

8A

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

6 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jun 23, 2014 to Jun 24, 2014. The notice description changed.

Notice updated

Response deadline changed from Jun 24, 2014 to Jun 23, 2014. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Michelle D. JordanContracting Officer
Mital J. PancholiContracting Officer

Full Description

Show more
PLEASE NOTE: THE RESPONSE DATE HAS BEEN EXTENDED TO TUESDAY, JUNE 24, 2014 - NO LATER THAN 3:00 PM (EST) PLEASE NOTE: THE PREVIOUS SOLICITATION NUMBER IS AN ERROR; THE CORRECT SOLICITATION NUMBER IS NIHOF2014006 The National Institutes of Health (NIH) Office of Research Facilities (ORF), Office of Acquisition (OA) has a requirement for the construction of Decommission and Demolition of two (2) structures, buildings 7 and 9 located in Bethesda, Maryland on NIH's main campus. Description of Requirement NIH Building 7 previously a research building; it has 3 floors plus ground floor with a total area of 53,500 GSF. Due to research function constraints and inadequacy of the utilities to support the facility, the building was vacated in 2005. It will be the first of the two buildings to be demolished as directed by the Government; it is currently vacant and unoccupied. NIH Building 9 is an administration and research building; it has 1 floor plus basement with a total area of 38,900 GSF. The office spaces in Building 9 are currently occupied by eight (8) Institutes and ORF offices. The institutes are currently being relocated to new facilities. In accordance with the 2012 NIH Master Plan, the two (2) buildings are to be demolished to make space for a new research building. The current NIH Master Plan calls for the demolition of Buildings 7 & 9 as part of the plan to clear the Southeast portion of the site closest to Building 10. The site will be used for the new Research Facility (Building D). The schedule for the project is dependent on the current occupants vacating building 9. In addition, once buildings 7 and 9 are demolished the area will be used as a construction lay down site for Building 10 E Wing renovation project. It is anticipated to start in 2015. The contractor shall provide Design-Build services to facilitate the complete removal of buildings 7 & 9 in their entirety including all remnants of their foundations, leaving the plotted areas backfilled with compacted suitable soil, graded level with a grassy (sod) park like setting (Allow for the installation of approximately 300 lf of 4 foot wide standard thickness reinforced sidewalk, 10 - Autumn Blaze Maples tree each with a minimum of 4 inch calipers with appropriate soil amendments prior to planting) and finished as directed by the Government. The contractor is required to provide architectural and engineering design services by professionals licensed to practice in Maryland. The Design/Build Contractor (aka D/BC, DBC, or Contractor) shall provide decommissioning and demolition construction documents (working drawings and specifications), featuring the following disciplines and or representative systems; architectural, structural, civil, mechanical, plumbing, fire suppression and electrical, and security systems. The provided construction documents and specifications are subject to the NIH Peer Review (owners review) procedure. The documents shall include the necessary information to facilitate the demolition of the buildings without damaging and or causing disturbance to any of the other adjacent facilities. The contractor shall be responsible for delivering a project that is LEED accredited/certified and provides sustainable features to achieve flexibility, energy efficiency, for quality of environment. Procurement strategy Pursuant to FAR Subpart 15.3, NIH will employ source selection tradeoff procedures to procure and award the construction contract for this project. All evaluation factors other than cost or price, when combined, are significantly greater than cost or price. This is a Two Phase Design Build Selection Procedure in accordance with FAR 36.303-1(b). The selection process will have two phases. Phase I, Request for Qualifications (RFQ), shall result in the establishment of a list of offerors identified as Viable Competitors, who will be invited to participate in the next stage of the procurement, Phase II. Phase II, Request for Proposals (RFP), shall result in the selection of the construction contractor whose offer provides the Government with the best value. In Phase I, the Government shall identify the evaluation factors other than cost or price that are critical to this procurement and that will serve as the basis for the determination of the viable competitors. Interested offerors will be required to submit their responses to the RFQ by the due date established in the RFQ. The Government will evaluate all the responses to the RFQ in accordance with the criteria in the RFQ, and advise each offeror in writing either that it will be invited to participate in the RFP or, based on the information submitted in the RFQ response that it is unlikely to be a viable competitor. Notwithstanding this advice, an offeror that is unlikely to be a viable competitor may not participate in Phase II of the procurement. Offerors that did not submit a timely RFQ response in Phase I will not be allowed to participate in Phase II of the procurement. After evaluating Phase I proposals, the Government shall select the most highly qualified offerors, not to exceed three (3). In Phase II, the Government will issue the RFP to the viable competitors and the other offerors from Phase I that elect to participate in Phase II. The RFP will serve as the basis for the firm-fixed price offers from the offerors in Phase II. The firm-fixed price offers will be due by the date established in the RFP. Based on the Phase I and Phase II submissions, the Government shall select the offer that reflects the best value to the Government. The Government reserves the right to make an award upon the basis of the initial Phase I and Phase II offers without discussions. Any resulting contract will be firm fixed price. NAICS Code: 236220 with a size standard of $33.5 million. It has been determined that competition will be limited to eligible 8(a) firms located within the geographical area serviced by the Washington DC Metropolitan District Office, and other eligible 8(a) construction firms with a bona fide place of business located within the geographical competitive area per 13 CFR - 124.507. All other 8(a) participants are deemed ineligible to submit offers. Magnitude of Construction is between $1 million and $5 million. All responders are advised that this project may be cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and final award. All contractors are advised that they must be registered, by the time of Phase 1 submissions, in SAM's database (https://www.sam.gov). Joint ventures must also be registered into this database as a joint venture. We advise contractors to begin this process when they prepare their proposal in order to ensure this registration is in place should they be selected for the award. Lack of registration in the SAM's database will make an offeror ineligible for award. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. The procurement is an 8(a) competitive set aside for the local area of Metropolitan Washington DC District Office of the Small Business Administration per FAR 19.804-3(d). Program of Requirements and a Past Performance Questionnaire Templates are attached to solicitation. No questions will be taken by telephone.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award