This Solicitation opportunity from Department Of Defense was posted on December 21, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design-Build Solicitation Related to Power and Communication Line and Related Structures Construction, Architect and Engineering Services (A-E), Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC)

Closed
W912EP20R0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 10 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

2 days ago

DEADLINE

in 14 days

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

PR, USA

Set-Aside

HZC

Documents

6

Amendment+0001+to+W912EP20R0012.pdf

PDF

Amendment+0002+to+W912EP20R0012.pdf

PDF

Amendment+0003+to+W912EP20R0012.pdf

PDF

Amendment+0004+to+W912EP20R0012.pdf

PDF

W912EP20R0012-IDIQ-SATOC-ERCIP-SPECS-RTA.pdf

PDF

W912EP20R0012-MILCON_ERCIP_SOW_TO0001_RTA.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 15, 2020 to Oct 19, 2020.

Deadline changed

Response deadline changed from Oct 19, 2020 to Oct 26, 2020.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Oct 26, 2020 to Dec 21, 2020.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts

Full Description

Show more
Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) For Design-Build and Construction Projects Related to Power and Communication Systems and Related Structures within the Boundaries of the U.S. Army Corps of Engineers (USACE), Jacksonville District And, Task Order 0001 for MILCON Energy Resilience and Conservation Investment Program (ERCIP) Puerto Nuevo, Puerto Rico The acquisition will utilize a Two Phase Design-Build Selection Procedures (See FAR 36.303). In Phase 1 of the 2 phase design-build selection procedure, interested firms or joint venture entities (referred to as - offerors) submit certain specified performance capability proposals, demonstrating their capability to successfully execute the design-build construction contract resulting from this solicitation. PHASE 1 DOES NOT INVOLVE PRICING SUBMISSION. DO NOT SUBMIT PRICING INFORMATION WITH PHASE 1 PROPOSALS. SCOPE OF WORK: Task Orders placed under this Single-Award Task Order Contract (SATOC) include, but not limited to energy conservation, energy resilience/energy security or demolition, construction, renovation, and repairs related to multiple facility types throughout the United States. Facilities may be commercial, residential (detached or multi-unit), industrial, institutional, training and education, medical, law enforcement, military, logistical, or any other types where general construction trades and practices are typically used in the construction, renovation, expansion, and repairs. Facilities may be located within private lands, within federal, state, municipal, territorial or Indian Lands, or within the contiguous coastal zones to a depth of 12 feet. Project sponsors may be military, other government agencies, organizations, or entities for whom the U.S. Army Corps of Engineers is assigned as the Construction Agent. The contract is not only intended to execute new construction and design-build project delivery, but to provide timely response to remediation of real and personal property facilities, e.g. maintenance, repair, and construction related to architectural, structural, roofing, carpentry, masonry, mechanical, heating ventilation and air conditioning (HVAC), plumbing, electrical and electronic, fire protection or life safety systems, solar microgrid systems, typical interior and exterior finishes, as well as, associated site work, utilities, landscaping, security, force protection, petroleum oil and lubricant (POL) systems, instrumentation, or interior design. Tasks may involve renewable energy, energy efficiency, water conservation, industrial process equipment, industrial ventilation systems, building controls, and energy management systems. Incidental tasks may include non-professional services, preliminary assessments or inspections to identify or quantify specific facility concerns such as lead based paint, asbestos containing materials, equipment repair or maintenance deficiencies including systems test and balancing and commissioning (system-specific, or whole building), building systems deficiencies, etc. Task Orders may be issued solely for construction services or solely for design-build services. No Task Orders will be issued for design services only. CAPACITY: The SATOC will be awarded for a period of one year with 4 one-year options. The total of all task orders issued under the contract will not be more than $40,000,000.00. The minimum award amount of any individual task order will not be less than $150,000 and the maximum award amount of any individual task order will be not more than $10,000,000. TASK ORDER 0001, MILCON Energy Resilience and Conservation Investment Program (ERCIP), Puerto Nuevo, Puerto Rico SCOPE OF WORK: The project work consists of the design and construction a photovoltaic (PV) microgrid system with full islanding capability and will be divided into a Base, Option A, and Option B. The Base project consists of a new 300 kW ground-mounted PV solar array, a new 375kW/375kWh Battery Energy Storage System (BESS), two (2) 375kW diesel EPA Tier 4 final certified backup generator systems with outdoor rated and sound proof enclosure with a 12,000 gallon above ground fuel tank with concrete spill containment. Include a master microgrid controller and an automated distribution switch to disconnect the Army Reserve Center (ARC) from PREPA during grid outages and incorporate the existing 200 kW PV array that exists at the project site. Option A project consists of increasing the ground-mounted PV solar array to 550 kW (an additional 250 kW). Option B project consists of increasing the new BESS to 750kW/750kWh (an additional 375 kW/375kWh). This project is a turnkey design-build contract. The Contractor shall be responsible for the full design and construction of the solar array, generator systems, design of the Diesel Emission Fluid (DEF) system, commissioning, and the applicable site work. All aspects of the design shall be signed and sealed by a Registered Professional Architect, Registered Professional Engineer, or other Registered Professional for the discipline of work required in the Commonwealth of Puerto Rico. ESTIMATED TASK ORDER MAGNITUDE OF CONSTRUCTION: $5,000,000 to $10,000,000 ESTIMATED TASK ORDER PERIOD OF PERFORMANCE: 770 calendar days. Offeror's are responsible for providing a clear, well organized proposal. Each volume shall contain the offeror's Name/Address/Telephone Number/E-mail address and the following (if applicable): Table of Contents, List of Tables, List of Figures and/or List of Appendixes. No information may be incorporated into the proposal by reference. When completing the information for transmittal at the DOD SAFE website, you will be asked to enter email addresses for the recipients. Use the email addresses below to submit your proposal to both the Contract Specialist and the Contracting Officer. When your proposal is submitted via the DOD SAFE website, the website will provide notification of the submittal to the recipients. The Contract Specialist is Ms. Halis L. Batista at contact@example.gov. The Contracting Officer is Mr. James Tracy at contact@example.gov. Submit the two electronic files using the DoD Secure Access File Exchange (DoD SAFE) https://safe.apps.mil/. A help guide can be found at https://dl.dod.cyber.mil/wp-content/uploads/dcs/pdf/unclass-DOD_SAFE_User_Guidev0_2d1.pdf. Non CAC card holders: This type of drop-off allows a non-authenticated user (Guest) to upload a file that has been requested by an authenticated user. An authenticated user must first execute the "Request a Drop-Off" procedure to obtain a "Request Code" for external delivery to the non-authenticated user. You must contact Ms. Halis L. Batista at contact@example.gov and Mr. James Tracy at contact@example.gov NLT 3 days before proposal due date to receive your - Request Code Proposals shall be submitted electronically to DOD SAFE website prior to the proposal due date required in the solicitation. It is the offeror's responsibility to ensure that the electronic proposals have been received. The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the DOD SAFE website. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal, virus scans, etc. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients email inboxes until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the information provided.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS