Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design- Culverts - Provincial Network Hydraulic Designs for Various Locations

Closed
SK-HWY-250067-LFRFPInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 11 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Saskatchewan Ministry of Highways is seeking consultants to provide hydraulic design services related to the replacement and potential new installation of culverts at various locations across the province over the next three years. The project involves preparing detailed hydraulic documentation such as Hydraulic Memos, Limited Analysis Reports, or Hydraulic Design Reports in accordance with the Ministry's Hydraulic Manual and specific contractual requirements. Design work will include tender package preparation, with a focus on bundling multiple replacement locations to achieve cost efficiencies. Additional services may be required depending on the site, including utility plan preparation and supervision, diverse survey methods, design exceptions, fish passage investigations, geotechnical analysis, and environmental permitting processes involving Fisheries and Oceans Canada, Water Security Agency, or Ministry of Environment. Emergency culvert responses and design drawing preparations are also part of the scope. Prequalified consultants must be aware of their probationary status and eligibility to participate, referring to the relevant Professional Services Procurement Manual. The solicitation is managed by SaskBuilds and Procurement under the Government of Canada, with a submission deadline set for early February 2026.

General Info

Saskatchewan seeks consultants for hydraulic design of culvert replacements over three years, including documentation.

Place of Performance

Saskatchewan, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Feb 3, 2026 to Feb 10, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → SaskBuilds and Procurement
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
SBP ConsultantsContracting Authority

Full Description

Show more
LFRFP 250067, Provincial Network Hydraulic Designs for Various Locations The Saskatchewan Ministry of Highways (Ministry) has scheduled the replacement of several existing culverts and culvert replacement designs for future delivery over the next three years. This also includes the possibility of installing culverts at new locations. Each location may include more than one culvert and require a Hydraulic Memo, a Limited Analysis Report (LAR), or a Hydraulic Design Report to be completed according to the Ministry’s Hydraulic Manual (HM) and the additional requirements as outlined in this agreement. Preparation of tender packages will be required for each replacement. It is expected that bundling of replacement locations will be economical and provide cost savings. Services that will be required on a case-by-case basis include utility plan preparation, organization and supervision of utility daylighting, right-of-way plan preparation, additional or alternative survey work or alternative survey methods, preparation of minor and major design exceptions, field investigation to determine fish passage, setup and monitoring fish survey, geotechnical investigations, design drawing preparation for Hydraulic Memos and LARs, emergency culvert response, preparation of Request for Review (RfR) from Fisheries and Oceans Canada (DFO), preparation of Aquatic Habitat Protection Permit (AHPP) application to be submitted to Water Security Agency (WSA) or Ministry of Environment (MoE) as applicable. Category of Work: Design- Culverts Additional InformationPrequalified Consultants being held in a probationary status at time of competition close and evaluation, should reference the Professional Services Procurement Manual - PSPM 100-04 for additional information pertaining to their eligibility to participate in this competition. For questions regarding a Consultants status, contact the competition contact indicated in LFRFP 250067.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS