Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Services for Albert Shores Septic to Sewer Project

Closed
RQS26-0384State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 10 hours ago

DEADLINE

in 16 days
NAICS: 541330
New
SLED
Design / Engineering for Microgrid System and DC fast charger
Solicitation # PE-64458-NONST-2027-000000037
The City of Decatur is seeking qualified professional engineering services for the design, bid assistance, and construction administration of a microgrid system and DC fast charger at the Decatur Police Department located at 420 West Trinity Place, Georgia. The project involves integrating a solar photovoltaic generation system and battery energy storage system designed to optimize renewable energy and peak demand management during normal grid-connected operations, while ensuring critical loads remain operational during emergency grid-islanded conditions. The selected consultant will provide a complete set of design plans for bidding and support the project through installation, commissioning, testing, and interconnection with Georgia Power. This solicitation, posted on September 11, 2026, requires proposals to be submitted by October 13, 2026. Funding is provided by the City and a Department of Energy grant, necessitating strict compliance with Build America, Buy America (BABA) requirements and federal regulations. Awarded consultants must maintain an umbrella insurance policy of at least 5 million dollars and adhere to comprehensive non-discrimination and civil rights policies. Evaluation is based on a 100-point weighted system, and the project is expected to begin in November following the award and coordination with Georgia Power. Payment will be made monthly upon the submission of invoices and narrative progress reports to the City Manager.
City of Decatur

POSTED

about 22 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract pertains to the design services for the Albert Shores Septic to Sewer Project in Orlando, Florida, aimed at addressing environmental concerns caused by aging private septic systems in the Albert Shores neighborhood. These failing septic systems have been contributing to nutrient pollution in Lake Holden, a water body impaired under the Lake Okeechobee Basin Management Action Plan. The project follows a 2018 city study identifying roughly 84 homes that could transition from septic to public sewer systems. Although sewer infrastructure has been installed up to the property lines, many residents have yet to make the connections necessary to improve water quality. In March 2025, the City applied for funding through the FY2024 Section 319(h) grant from the Florida Department of Environmental Protection’s Nonpoint Source Management Program and was awarded funds in July 2025. The grant will finance design and construction efforts to connect homes to existing sewer laterals, ensure proper abandonment of septic systems, and provide resident education and financial assistance. The ultimate goal is to reduce nitrogen and phosphorus discharges into Lake Holden and ensure compliance with state water quality standards. The solicitation, identified by number RQS26-0384, was posted in May 2026 by the City of Orlando’s Public Works department, with a response deadline in June 2026. Key contacts for the project include the Project Manager, Huey Pham, and Purchasing Agent II, William Resto.

General Info

Design services for Albert Shores septic-to-sewer project, funded by 2025 DEP grant, improving water quality.

Agency

Florida → Public WorksView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(7)

Exhibit_-6-_Lobbying_Certification.docx

DOCX

Exhibit_-5-_Conflict_of_Interest_Certification.docx

DOCX

Exhibit_-_1_-_NF131_Florida_Department_of_Environmental_Protection_(DEP)Albert_Shores_Grant_Agreement.pdf

PDF

Exhibit_-4-_Certification_Regarding_Debarment,_Suspension,_Ineligibility_and_Voluntary_Exclusion_for_Federal_Aid_Contracts_(4).docx

DOCX

Design Services for Albert Shores Septic to Sewer Project.pdf

PDF

Exhibit_-_3_-_Albert_Shores_Project_Area.pdf

PDF

Exhibit_-_2_-_Albert_Shores_Septic_to_Sewer_Conversion_-_List_of_Homes.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts2 people available
OfficeOrlando, FL, 32801, USA
Organization / Agency
Florida → Public Works
View Agency Profile
Office AddressOrlando, FL, 32801, USA
Contacts
Huey PhamProject Manager
William Resto NIGP-CPPPurchasing Agent II

Interested Companies (41)

Show more
Wind River Environmental
Orlando, FL
ConstructConnect
Cincinnati, OH
Geotechnical and Environmental Consultants, Inc. (GEC)
Orlando, FL

See All 41 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Albert Shores neighborhood in Orlando currently relies on aging private onsite septic systems that are increasingly prone to leaks and failures, contributing to nutrient loading into Lake Holden, an impaired water body within the Lake Okeechobee BMAP. In 2018, the City completed a study identifying approximately 84 homes that could be converted from septic to public sewer to improve water quality. Although public sewer mains and laterals installed to the right-of-way line are available, most residents have not yet connected. In March 2025, the City submitted a grant proposal for funding consideration from the FY2024 Section 319(h) grant administered by the Florida Department of Environmental Protection's Nonpoint Source Management Program. In July 2025, the City was notified of award and subsequently executed a grant Agreement. Funds from the grant will be used to fund design and construction to connect residences to existing sewer laterals, properly abandon septic systems, and support residents with education and financial assistance. Completion of the project will reduce nitrogen and phosphorus loads to Lake Holden and support compliance with state water quality requirements.

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 541330
New
SLED
Professional Water Management Consulting Engineering Services for Commercial Irrigation Monitoring, Technical Support, and CUP Compliance
Solicitation # 20260236
The City of Port St. Lucie is seeking a qualified consulting engineering firm to provide professional water management services for 50 commercial irrigation sites. The scope of work focuses on irrigation monitoring, technical support, and ensuring compliance with Consumptive Use Permits (CUP) and Florida Statute 373.62(7) variance requirements. The selected consultant will be responsible for 24/7/365 monitoring of 1,444 zones using Rain Bird Maxicom II and Baseline central control systems, providing the necessary software to the City free of charge, and conducting annual smart site inspections with reports due to the South Florida Water Management District by February 1 each year. All services must adhere to the City of Port St. Lucie Public Works Irrigation Standards 328400. The contract is for an initial term of three years with one optional two-year renewal. To be eligible, the firm must employ a Florida licensed Professional Engineer and a licensed Irrigation Contractor, both with at least five years of experience. Additional staffing requirements include a Certified Landscape Irrigation Auditor, a training expert with a degree from a U.S. accredited institution, and personnel proficient in CRBasic programming. The procurement is conducted under the Consultants’ Competitive Negotiation Act, utilizing a best-value analysis that weights qualifications and experience at 70 percent and methodology at 30 percent, followed by an oral presentation. Invoices are submitted monthly and paid in accordance with Florida’s Prompt Payment Act.
Engineering Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS