Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Design Services For Electric Vehicle Charging Infrastructure For The City Of Pinole

Closed
State & Local
Submission Closed
Solicitation #
20261008066

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is seeking engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project. The scope of work includes project initiation, data gathering, developing a 30 percent Basis of Design report, and creating detailed designs at 60, 90, and final levels for injection well equipping. Key deliverables include technical memoranda, drilling plans, and a Class 1 Opinion of Probable Construction Cost. The project must comply with California Code of Regulations Title 22 for indirect potable reuse and adhere to IEUA Engineering Design Guidelines and SCADA standards. This is a small business set-aside available to SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract is a not-to-exceed agreement paid on a time and material basis, with payments made monthly via ACH. Proposals are due by January 26, 2027, via PlanetBids and are subject to a 35-page limit. Selection is based on a ranking of consultants, with fee envelopes opened only for the top three candidates. The final selection requires approval from the IEUA Board of Directors. The contract is governed by the laws of the State of California, County of San Bernardino, and requires compliance with various federal grant requirements, including the Davis-Bacon Act and Buy America preferences. IEUA retains full ownership of all reports, drawings, and data produced during the performance of the contract.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency (IEUA) is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project. The scope of work involves the design and bid period assistance for a purified water conveyance system that delivers water from the Advanced Water Purification Facility to injection wells. Key responsibilities include project initiation, data gathering, detailed design, and providing an Opinion of Probable Construction Cost and construction schedule. This is a small business set-aside available to SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. Proposals are due by January 26, 2027, and will be evaluated based on a 100-point scale focusing on project implementation, technical challenges, regulatory requirements, and cost and schedule control. The selection process involves ranking proposals, with the top three candidates potentially undergoing interviews before the top-ranked consultant negotiates a not-to-exceed contract approved by the IEUA Board of Directors. The contract is governed by the laws of the State of California and County of San Bernardino, and requires adherence to 2 CFR Part 200, including Buy America preferences for iron, steel, and construction materials. Payments will be made via ACH, and the agency retains ownership of all resulting reports and documentation.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
SLED
Storm Drain System Master Plan
Solicitation # PWD-2026-03
The Town of Woodside is soliciting a qualified engineering firm to develop a comprehensive Storm Drain System Master Plan. The scope of work includes updating GIS databases, conducting video inspections of town-owned drainage systems, and creating a stormwater infrastructure capital improvement and financial plan. Key deliverables include an updated system inventory in ESRI GIS format, hydrological calculations and modeling for 25, 50, and 100-year frequency storms based on the County of San Mateo Hydrology Manual, a ten-year Capital Improvement Program with priority lists and cost estimates, and three 8-hour staff training sessions. The project also requires the preparation of a stormwater rate and revenue plan along with necessary municipal code revisions. Proposals are due by 4 p.m. on January 21, 2027, and must be submitted as two hard copies and one digital PDF on a flash drive. Award selection is based on a weighted scoring system evaluating proposed implementation and workflow, experience with similar projects in California within the last five years, project management qualifications, staffing capability, and cost-effectiveness. The contract requires compliance with California Labor Code regarding prevailing wages, workers' compensation, and non-discrimination, as well as adherence to the Federal Americans With Disabilities Act. Payment is handled via monthly itemized billing, and the final award is subject to approval by the Town Council. There is no set-aside status for this solicitation.
Town of Woodside

POSTED

about 5 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The City of Pinole is soliciting proposals for a fixed-fee agreement to provide construction-ready, shovel-ready designs for dual-port, Level II electric vehicle supply equipment (EVSE) across six municipal sites. The project encompasses Pinole City Hall, Pinole Senior Center, Bayfront Park, Pinole Swimming Pool, Meadow Park, and Louis Francis Park, with a total of 29 chargers planned. The scope of work is divided into three primary tasks: conducting site assessments for electrical capacity and ADA compliance, providing design recommendations and cost estimations, and delivering final permit-ready designs that include electrical engineering, demolition, improvement plans, and ADA-compliant striping and signage. The project is subject to rigorous federal and state regulations, including the Build America, Buy America Act, 2 CFR Part 200, the Davis-Bacon Act, and the 2025 California Building Code. Proposals will be evaluated on a 100-point scale focusing on technical expertise, project plan quality, understanding of the scope, regulatory familiarity, cost-effectiveness, and prior performance. Selected vendors must be available to commence work by November 18, 2026, with all final designs delivered by December 18, 2026. Requirements include maintaining specific liability and workers compensation insurance, obtaining a City business tax certificate, and adhering to strict record-keeping and audit standards for three years following final payment.

General Info

Pinole seeks proposals for shovel-ready designs for 29 EV chargers across six sites.

Place of Performance

Pinole, CA, 94564, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

25 mandatory

28 requirements in 8 areas

  • Compliance10 · 10 must
    009

    City Right to Reject or Cancel RFP

  • Submission6 · 5 must
    001

    Proposal Submission Deadline

  • Technical4 · 4 must
    019

    Construction-ready EVSE designs for City of Pinole

  • 25 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 28 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 60 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 5 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF PINOLE
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → CITY OF PINOLE
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
$18

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS