This Solicitation opportunity from Utah was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DFCM Construction - Prequalified General Stage II - Utah Valley University- UVU Pope Science Safety Railing Upgrade- Project #24160790
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to a Stage II Invitation to Bid issued by the Utah Division of Facilities Construction and Management (DFCM) for a project at Utah Valley University's Pope Science building. The scope involves removing existing safety railings and installing new safety and hand railings in the atrium, with the work scheduled during the campus summer break from May 10, 2026, to August 17, 2026. The project has an estimated construction cost of $300,000 and requires bidders to be prequalified under a prior Stage I process, ensuring only qualified contractors on the DFCM prequalified list as of the solicitation date are eligible to bid. The procurement process includes detailed bid submission procedures, mandatory meetings, and adherence to DFCM’s contractual and safety standards, with a focus on compliance with current building codes and safety regulations. Supporting documentation includes comprehensive project manuals, stamped architectural and structural plans, and technical reports such as structural calculations and environmental safety assessments, including lead-based paint inspection reports. The project manual outlines scope, procedures, and general requirements for construction, while the DFCM General Conditions provide the contractual framework governing project execution, safety, modifications, and claims. The plans specify the design and installation details for the railings to meet current standards. Additional instructions cover subcontractor listing procedures and health insurance compliance forms, ensuring administrative and environmental safety considerations are addressed. Overall, the project emphasizes safety upgrades, regulatory compliance, and efficient project management within the defined budget and schedule.
General Info
Place of Performance
UT, USASet-Aside
Documents
8AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Building 262 Renovations FLETC GlyncoOpen now, due in 15 days
- Repair Auto Maintenance Bldg 575Open now, due in 7 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
