This Solicitation opportunity from Utah was posted on December 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DFCM Construction - Standard Low Bid - Department of Natural Resources - Soldier Hollow Upper Zone Pump Upgrades - Project #25372500
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The State of Utah Division of Facilities Construction and Management (DFCM) has issued a solicitation (CS26036) for a low-bid construction contract focused on upgrades to the Soldier Hollow Upper Zone Pump system, specifically pump house and booster pump work at a golf course located in Midway, Utah. The estimated construction budget is approximately $700,000, with bids due by January 8, 2026. The project aims for substantial completion by August 19, 2026, with liquidated damages set at $1,500 per day for delays beyond this date. The scope includes comprehensive construction activities adhering to detailed specifications and approved plans prepared by Ensign Engineering, covering earthwork, concrete, electrical, mechanical systems, and related site improvements. Contractor responsibilities extend to scheduling, coordination with third parties and utilities, safety compliance, and submission of all required documentation such as shop drawings, as-built records, warranties, and operation manuals. The contract is governed by standardized DFCM General Conditions (August 2020 revision as of July 2023), which outline roles, responsibilities, insurance, bonding, claim procedures, nondiscrimination policies, and warranty requirements. Inspection and acceptance of work are conducted onsite by representatives from DFCM and the architect/engineer, with formal certification of substantial and final completion tied to payment milestones. The project does not incorporate typical federal acquisition clauses or socioeconomic certifications, nor are explicit details provided regarding evaluation criteria or payment office data. Subcontractor licensing and disclosure prerequisites are in place, and change orders and claims must follow established processes. Proposals must comply with Instructions to Bidders (not fully detailed in the available information), and communication is managed by the DFCM Project Manager, Mathew Daley. Overall, this contract represents a standard state-managed construction project requiring rigorous adherence to detailed technical specifications, timely delivery, and comprehensive documentation within a fixed budget and schedule framework.
General Info
Place of Performance
Set-Aside
Documents
6AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 28 days
- Building 262 Renovations FLETC GlyncoOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
