Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on April 12, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DIA ATCT Modernization

Awarded
697DCK-23-R-00508Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the modernization and refurbishment of the Federal Aviation Administration's Airport Traffic Control Tower and Base Building at Denver International Airport. With an estimated value between 5 million and 10 million dollars, the scope focuses on completing facility upgrades that were previously interrupted. Because the tower is a 24/7 operational facility, all work must be sequenced to avoid interrupting air traffic operations, which may necessitate night work and strict coordination regarding elevator usage and service interruptions. The comprehensive scope of work includes architectural upgrades such as replacing interior finishes, remediating mold, and ensuring ABA/ADA compliance for restrooms and signage. Fire and life safety improvements involve restoring fire-rated walls, replacing doors, and upgrading fire suppression and alarm systems. Extensive mechanical overhauls are required, including the replacement of numerous air-handling units, boilers, and pumps, as well as the installation of a redundant temporary boiler plant. Electrical work will support these new installations through additional receptacles, telecommunications outlets, and panel modifications to meet FAA and code compliance.

General Info

Contract Value

$54,000

NAICS

23622

Place of Performance

Denver, CO, 80249, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 697DCK Regional Acquisitions Svcs
Contacts1 person available
OfficeFORT WORTH, TX, 76177, USA
Office AddressFORT WORTH, TX, 76177, USA

Full Description

Show more
GENERAL The work described here is representative at best and is not all-encompassing of the project scope modernization and refurbishment of the Federal Aviation Administration's Airport Traffic Control Tower (ATCT) and Base Building located at the Denver International Airport. The ATCT is a 24/7 operational facility. This project is to complete the facility modernization; most of the work in the upper floors of the ATCT was completed before the original construction contract was terminated due to COVID in 2020. The ATCT and Base Building are constructed of architectural precast concrete panels. The ATCT panels cover cast-in-place concrete up to 240 feet in building elevation and above this level, the tower is constructed of precast panels over structural steel. Adjacent to the ATCT is the 3-story Base Building and the Mechanical / Cooling Tower Building. Coordination will be required with all Mechanical, Plumbing, and Fire Suppression refurbishment and replacement work, along with movement of parts, equipment and labor when using the ATCT's elevator. Periods of sustained elevator usage will need to be coordinated with the facility so as to avoid impacting air traffic operations. Refurbishment will be designed and sequenced to prevent interruption of operations in the Base Building and ATCT, and may include night work. Any required interruption of services will require advanced scheduling and coordination with the responsible authorities and managers of the FAA and in some case the Denver International Airport. Estimated value is between $5,000,000.00 and $10,000,000.00. Architectural Work includes: Replacement of all interior finishes in the Base Building and stairways with Class A finishes. Penetrations and openings at fire-rated floor and wall assemblies will be repaired with the appropriate fire-stopping assemblies. Repair and refinishing of the exterior soffit at the ATCT Junction Level, approximately 22 stories above ground level Remodel Base Building restrooms and break rooms to meet ABA/ADA requirements. ABA/ADA compliant signage will be provided inside and outside of the stair enclosures. Handrails and metal stair tread riser panels will be added between ground level and junction level to the existing fire exit stairs in the ATCT. Replace new room signage in both the Base Building and ATCT. Remediate mold contamination, previously identified at interior walls and at perimeter unit heaters. Replace drywall in areas where it has been damaged by water, primarily due to leaking mechanically/plumbing systems. Replace backflow preventer, hose bibs, and valves. Remove and relocate water heater and mop sink, necessary to accommodate mold remediation work. Water closets, sinks and water coolers will be replaced and installed in compliance with the ABA/ADA accessibility requirements. Remediate exterior sealant joints at the 2nd Floor Base Building window perimeters due to water infiltration with a weeped two-stage joint added at the architectural concrete panel joints at the windows heads of the north and west facing windows. Fire and Life Safety Work includes repair or replacement to existing fire-rated walls and door assemblies, adjustment or replacement where damaged or deficient in order to restore fire ratings. Listed firestop assemblies will be provided where missing at all rated barriers. Provide UL approved fire-stopping assemblies at penetrations of fire rated walls and floor assemblies. Replace fire rated doors with full flush steel construction, minimum 1-3/4 thick. All exterior hollow metal doors and frames will be galvanized and insulated meeting NFPA 80 requirements. Provide flush, solid core wood doors with paint, veneer, or plastic laminate clad finish to match facility standard and meeting NFPA 80 requirements. Access Doors: Replace existing floor hatch at Cable Access level with fire rated hatch. Replace existing door knobs with ADA-ABA compliant levers. Provide power assist door openers and door closers at fire rated door assemblies and meeting NFPA 80A requirements. Install pre-finished steel semi-recessed Fire Extinguisher cabinets with solid doors and magnetic flashlight. Install stair access and fall protection atop of the diesel fuel tank and a guardrail around the access hatch to the cooling towers. Fire Suppression work includes: Maintenance and service to all existing fire suppression riser assemblies including new gaskets, valve packing replacement and verification of each risers operation. Provide releasing modules at each pre-action riser assembly. Install butterfly valves above each pre-action riser assembly. Replace sprinkler head escutcheons in ceiling. Provide automatic chemical suppression system at one (1) break room in the Base Building with a range hood with manual electric disconnect and manual suppression system activation. Replace existing ATCT fire pump. Add damper control and damper control strategy through DDC to the ATCT Stairwell as well as the fire alarm system. The sequence will interrupt the stair pressurization to allow occupancy. Fire Alarm work includes: Relocating the smoke detector in the supply ductwork of AHU-1 to be upstream of the duct humidifier. Fire alarm system devices where affected or modified, will be coordinated with the FAA Building Management and the local fire alarm control panel to avoid all trouble/alarm signals. The existing Fire Alarm System will be modified and/or expanded to include additional fire detection devices, release of sprinkler system detection, and notification devices including strobes, and combination horn/strobe appliances where deficiencies have been identified. The system devices will be addressable, non-coded, with sufficient capacity for required coverage. Manufacturer type will be compatible with existing system. Mechanical work includes: Below is a list of major mechanical equipment that is to be replaced as part of this project. This equipment will be identified in the project design documents and is not all encompassing of the project scope: Replacement of existing Air-Handling units in the Base Building. Replacement Existing Boiler units and Control Panels in the Base Building. Replacement Existing Hot Water System Pumps in the Base Building. Replacement Existing Exhaust Fans in the Base Building & ATCT. Replacement Existing Unit Heaters in the ATCT pipe chase. Replace AHU-1 on a one-for-one basis in the Base Building. Replace AHU-2, AHU-3, and AHU-4 and all ancillary devices with CRAC units of similar capacity in the Base Building. Replace AHU-5 and AHU-6 and all ancillary devices with vertical air handling units of similar capacity in the Base Building. Replace AHU-7 and AHU-8 and all ancillary devices with CRAC units of similar capacity in the Base Building. The supply air will be ducted above the ceiling to supply diffusers to better distribute airflow between racks of equipment. Replace AHU-11 and AHU-12 and all ancillary devices on a one-for-one basis on the Sub-junction level of the ATCT. Provide temporary, portable AHUs and ducting during the replacement. Remove portion of wall at sub-junction level to allow for replacement of AHU-12. Infill opening after replacement is complete. Replace AHU-13 and 14 on a one-for-one basis on the Junction level of the ATCT. Remove and provide new finned tube elements, control valves, balancing valves, shut off valves and associated piping on a one-for-one basis in the Base Building. The covers for the existing finned tube heating will be removed and re-installed. New valves will be installed in the hot water piping branch lines to facilitate work. Provide a full capacity temporary boiler plant with 100% redundancy during the removal and replacement of existing boilers, pumps and heat exchanger. Including (2) new boilers, (2) Tower hot water pumps, (2) Base Building hot water pumps, insulated steel piping between temporary boilers and temporary pumps, flexible piping between temporary pumps and existing system, temporary heated pump enclosures for winter operation, and temporary controls that mimic the existing configuration. Note: the temporary boiler plant was partially constructed at the time of original contract termination. The temporary boilers, pumps and associated piping and electrical supplies have already been purchased and are stored off-site and will be available for use, along with the original design drawings. Remove the existing boilers and replace with high efficiency boilers. The new boilers will be capable of local DDC control. Replace the hot water expansion tank and air separator on a one-for-one basis. The existing three hot water pumps were designed at 50% heating load each which provided partial redundancy. Replace with two (2) new hot water pumps designed each at 100% of the heating load providing 100% redundancy. New pumps provided with VFD for balancing to match existing flow characteristics. Replace hot water heat exchanger in the mechanical room of the Base Building. Replacement will include adding a second heat exchanger and the required valves, piping, and accessories for a fully redundant system. Replace all hydronic unit heaters in the pipe chase from the ground floor to the 13th floor with electric unit heaters. Existing hydronic piping taken back to the mains and capped. Re-locate humidifier wand diffusers for AHU-1 downstream of the duct smoke detector in the mechanical room of the Base Building. Add air handling units and humidifier to the 10th floor of the tower to serve the 11th floor of the tower. Remove AHU from the ASDE equipment room on the 11th floor above the Cab of the ATCT. Increase outside air circulation for ATCT stairwell free-cooling. This will include tying a new fan into the supply ductwork for the stair pressurization system to provide ventilation air into the space, and using the relief air damper and louver near the top of the stairwell to relieve air from the space. Controls will be modified to disable the ventilation system in case of emergency, and allow the stair pressurization system to function. Replace the chemical feed system for the heating hot water system. In the UPS room in the Base Building, install a filter bank on the air intake hood. Thermostat protection for cab under architectural scope of work. Provide 13th floor battery room ventilation. Replacement of duct electric coil EDH-11 located on the cable access level of the tower. Install electric unit heater in boiler room. Cap existing grilles in ATCT stairwell. The Electrical Work As part of this project, includes additional receptacles, fire alarm, telecommunications outlets and additional electrical equipment associated with new Architectural, Mechanical and Plumbing installations. Other miscellaneous electrical work is to be performed in various panels (for code and FAA order compliance) as noted in the design drawiings

More opportunities from Department Of Transportation → 697DCK Regional Acquisitions Svcs

Same awarding agency

NAICS: 541330
New
Federal
Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA
Solicitation # 697DCK-27-R-00022A
The Federal Aviation Administration is soliciting engineering design services for the renovation of a 4,992 square foot leased building located at 3551 Combine St., Paso Robles, California, to establish a new System Support Center. The selected contractor will be responsible for developing permit-ready Mechanical, Electrical, Plumbing, Life Safety, and Fire Protection documents based on provided Design Intent Drawings. Key deliverables include the submission of final drawings to the City of Paso Robles and the procurement of city-stamped approval, ensuring all work complies with the 2022 California building, mechanical, electrical, and fire codes, as well as ANSI A117-1-2009 accessibility standards. This procurement is a total small business set-aside under NAICS code 541330. The government intends to award the contract based on best value, considering price and other solicitation criteria, following the negotiation of a fair and reasonable price. Interested offerors must submit a business proposal, including completed representations and certifications and past performance information, to Linda Hennequant by November 12, 2026. Submissions must be sent via email in PDF or Word format, ensuring the solicitation number 697DCK-27-R-00022A is included in the subject line. Payment for services will be processed through the Delphi eInvoicing web-portal.
Engineering Services

POSTED

2 days ago

DEADLINE

in 15 days
View Details
NAICS: 325992
Federal
Printer Consumables for the Strategic Sourcing for the Acquisition of Various Supplies and Equipment (SAVES) Program
Solicitation # 697DCK-25-R-00368
The Federal Aviation Administration (FAA) Office of Information and Technology is seeking a single qualified small business to establish an agency-wide indefinite delivery indefinite quantity (IDIQ) contract for toner and printer consumables under the Strategic Sourcing for the Acquisition of Various Equipment and Supplies (SAVES) program. This total small business set-aside, under NAICS 325992, covers over 750 items from specific original equipment manufacturers, including Brother, Canon, Dell, Epson, HP, Lexmark, Okidata, and Xerox. The contract features a five-year period of performance from February 19, 2027, to February 18, 2032, consisting of one base year and four one-year ordering periods, with a minimum ordering obligation of 1,000 dollars. Award will be made to the Lowest Priced Technically Acceptable (LPTA) offeror. Evaluation is based on non-price factors, including technical acceptability and past experience, and a price proposal evaluated via a discount-based model against manufacturer suggested retail prices. Proposals must be submitted in three volumes: Business, Technical, and Price. Following several amendments, the final proposal due date is November 5, 2026, at 5:00 PM ET. Deliveries are required for CONUS locations to specific delivery points, with OCONUS delivery permitted subject to approved shipping charges. Contractors must maintain a quality system ensuring high responsiveness for quote requests and customer service.
Photographic Film, Paper, Plate, Chemical, and Copy Toner Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 5417
Federal
BEYOND Phase 2
Solicitation # 697DCK-26-R-00423
Screening Information Request 697DCK-26-R-00423 is a competitive selection process for the Federal Aviation Administration's BEYOND Phase 2 program, managed by the Unmanned Aircraft Systems and Advanced Air Mobility Integration Office. This initiative seeks to award up to eight Other Transaction Agreements (OTAs) to State, Local, Tribal, or Territorial (SLTT) governments to test and evaluate emerging aviation concepts. The program focuses on four programmatic areas—infrastructure, scalability, safety, and automation—and five operational challenges, including controlled airspace, on-airport operations, and cross-border flights. This is a non-funded process where participants are responsible for their own costs, and the period of performance extends through September 30, 2029. Eligible offerors must be instrumentalities of an SLTT government, provide a letter of attestation, and maintain an active registration in the System for Award Management (SAM). Proposals are evaluated on a pass/fail basis for eligibility, followed by a holistic confidence rating of the Technical Submission Package based on goal specificity, innovation, alignment with FAA priorities, and the use of SMART methodology. Following several extensions, the final proposal submission deadline is October 30, 2026, at 3:00 pm ET. Submissions must be sent via email in PDF format, adhering to strict page limits and formatting requirements, including a 26-page limit for the main technical narrative.
Scientific Research and Development Services

POSTED

7 days ago

DEADLINE

in 2 days
View Details
NAICS: 561730
Federal
CONSOLIDATED WEED CONTROL FOR WESTERN SIDE OF KANSAS CITY DISTRICT FACILITIES
Solicitation # 697DCK-26-R-00432
Solicitation 697DCK-26-R-00432 is a small business set-aside for consolidated weed control services for the Western side of the Kansas City District, managed by the Federal Aviation Administration. The contract is a firm-fixed price award with a performance period spanning a base year from January 1, 2027, to December 31, 2027, and four subsequent option years extending through December 31, 2031. The scope of work requires the contractor to provide all labor, equipment, and materials to perform chemical vegetation management on gravel roadways, general plot areas, ditches, and fence lines across multiple sites, including Wichita, High Plains, Gardner, Kansas City, Ozark, Tulsa, and MCI. Key performance requirements include an initial treatment completed by March 15th and a guaranteed 90 percent vegetation kill rate. The procurement process has been modified through three amendments, which updated site data attachments, revised pricing formulas to include touch-ups, and extended the bid due date to November 6, 2026, at 5:00 PM ET. Award will be granted to the responsible offeror providing the lowest priced, technically acceptable offer. Technical acceptability is based on the submission of at least three successful relevant contracts from the past five years and three customer satisfaction surveys with an average rating of Good or higher. Additionally, the contractor must comply with hazardous material identification and Safety Data Sheet requirements, utilize the Delphi e-Invoicing portal, and ensure all personnel are escorted while on FAA property.
Landscaping Services

POSTED

22 days ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS