Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Disposal of RCRA Hazardous Soil at Class I Landfill

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → FA4664 452 Msg PkView Agency

NAICS

562212 - Solid Waste LandfillView NAICS

Place of Performance

LINDA, CA, 92518, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4664 452 Msg Pk
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA4664 452 Msg Pk
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Final disposal of RCRA-hazardous soil in a permitted Class I hazardous waste landfill.

Similar Contracts

Same NAICS industry code

NAICS: 562212
New
SLED
Regional Landfill Options for Orange County (RELOOC) Strategic Plan - Frank R. Bowerman (FRB) Landfill ImplementationThe Frank R. Bowerman Landfill Implementation, part of the Regional Landfill Options for Orange County (RELOOC) Strategic Plan, involves a series of environmental and operational upgrades to extend the landfill’s capacity and lifespan to approximately 2053. Authorized under the California Environmental Quality Act, the project includes phased vertical and horizontal expansions within the existing property boundary, an increase in the maximum daily disposal rate to 11,500 tons, and measures to address on-site landslides through temporary disturbance of adjacent areas for slope stabilization. A Soil Management Plan is in place to protect nearby canyons and habitat, ensuring compliance with environmental safeguards for local flora and fauna. The project also incorporates comprehensive landfill gas management improvements, including the replacement of two existing flares with new enclosed, LFG-fired flares, the installation of a unified sulfur removal system common to all flares, and administrative reorganization of permits to isolate each flare into individual permitting structures. Emission limits for sulfur oxides and hydrogen sulfide on existing flares have been updated to meet current Best Available Control Technology standards without increasing the volume of gas flared. Permit applications have been submitted to the South Coast Air Quality Management District to modify or establish new permits for the upgraded flare system, the integrated treatment infrastructure, and a Significant Title V Permit Revision, ensuring regulatory alignment and environmental accountability.
OC Waste&Recycling

POSTED

3 days ago

DEADLINE

N/A
View Details

More opportunities from Department Of Defense → FA4664 452 Msg Pk

Same awarding agency

NAICS: 562910
Federal
Request for Information for PFAS Contaminated Soil Disposal ServicesThe project involves the remediation and disposal of PFAS-contaminated soil generated from the WMWD Sewer Rehabilitation Project at March Air Reserve Base in California, managed under Project Number PDPG26-2400. The contractor is responsible for all aspects of on-site handling, including secure stockpiling with plastic sheeting and containment berms, strict adherence to a 90-day accumulation limit for non-RCRA soil, and continuous air and dust monitoring during excavation and loading. Soil must be sampled and analyzed by a certified laboratory and classified according to federal and California hazardous waste standards, distinguishing between RCRA hazardous material requiring Class I landfill disposal and California-only hazardous material exceeding Title 22 thresholds. All transportation of contaminated soil must be managed by licensed hazardous waste carriers, with full compliance to state manifest tracking systems and mandatory vehicle decontamination before leaving the site. The contractor must operate under rigorous regulatory frameworks including UFC guidelines, OSHA safety standards, the March ARB Environmental Protection Guide, and California environmental regulations. Work is subject to strict environmental controls to prevent contamination spread, ensure worker safety, and maintain regulatory compliance throughout the entire process from excavation to final disposal. The solicitation is a sources sought notice issued by the Department of Defense, with responses due by July 27, 2026, and inquiries directed to the project point of contact at March ARB, California.
Remediation Services

POSTED

8 days ago

DEADLINE

in 2 days
View Details
NAICS: 541330
Federal
A-E 35% Design Repair Runway PDPG26-0103 March ARB, CAFunds are not currently available for this effort, but a solicitation is planned for the A-E 35% design services for airfield pavement rehabilitation at March ARB, California, under contract number PDPG26-0103. The work involves a comprehensive evaluation and planning effort to update the existing pavement network by dividing it into distinct branches and sections, requiring the service provider to supply all personnel, equipment, materials, and facilities necessary to complete the scope as outlined in the Statement of Work. This acquisition is strictly a 100% set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and will follow FAR Part 36 procedures for selecting architect-engineer firms, with the NAICS code 541330 and a size standard of $25.5 million. The Request for Qualifications, including the Statement of Work and supporting documents, will be posted on SAM.gov on or around July 13, 2026, with responses due by July 31, 2026, and a contract performance period of 120 days following award. All prospective contractors must be registered in the System for Award Management (SAM) with a valid UEI number prior to any potential award, and failure to register will disqualify eligibility. All updates, amendments, and official communications will be posted exclusively on SAM.gov, and inquiries should be directed to Contracting Officer Marissa Lopez or Chief Contracting Officer Ellie Frias via the provided contact information.
Engineering Services

POSTED

12 days ago

DEADLINE

in 7 days
View Details