Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

District 1 Micro-Surfacing (JOC)

Closed
01JOC00001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; heavy construction involving tunneling, boring, jacking, and micro tunneling; and finishing work including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Additional requirements encompass the supply of ready mix, precast concrete, and various utility materials, as well as adherence to Storm Water Pollution Prevention standards. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, with certifications required from approved agencies such as the SBA or MBDA prior to the bid opening. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and furnish bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Interested parties must be invited through the Building Connected electronic system, with the final bid deadline set for November 18, 2025. Primary coordination is managed by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

2 days ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

2 days ago

DEADLINE

in about 1 month

General Info

Documents

3

01JOC00001 Addendum No. 1

PDF, High priority: read this firstamendment
High

01JOC00001 Addendum No. 2

PDF, High priority: read this firstamendment
High

Contract No. 01JOC00001 - District 1 Micro-Surfacing JOC IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Apr 16, 2024 to Apr 9, 2024. NAICS code changed from 237990 to 237310.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
01-Hum-101-109.5/120.1   ***   HUMBOLDT COUNTY NEAR ORICK FROM GEORGIA PACIFIC ROAD TO 0.4 MILES SOUTH OF SOUTH PRAIRIE CREEK UNDERCROSSING

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Rdwy excavation, place HMA and HFST, install APC and concrete barrier.
Solicitation # 01-0L3804
The California Department of Transportation (Caltrans) is soliciting bids for Contract No. 01-0L3804, a highway construction project on State Route 101 in Mendocino County. Located approximately 8 miles south of Willits, the project spans from 0.2 mile north of Ridgewood Ranch Road to 0.4 mile south of Black Bart Road. The scope of work includes roadway excavation, the placement of Hot Mix Asphalt (HMA) and High Friction Surface Treatment (HFST), and the installation of Aggregate Pavement Concrete (APC) and concrete barriers. Additionally, the project involves repairing or replacing two jurisdictional drainage systems, including culvert extensions and the installation of a new underdrain culvert. Bids must be submitted on a cost-plus-time basis by December 8, 2026. The general work must be completed within 95 to 135 working days, while permanent erosion control establishment must be finished within 250 working days. The contract is governed by the 2025 Standard Specifications and specific Special Provisions, which include requirements for Buy America/Build America compliance, professionally facilitated project partnering, and subcontractor payments within seven days of progress payments. Labor must be compensated according to the higher of the California Department of Industrial Relations or U.S. Secretary of Labor prevailing wage rates. The project requires adherence to several environmental and regulatory permits, including authorizations from the U.S. Army Corps of Engineers, the California Regional Water Quality Control Board, and the California Department of Fish and Wildlife. Quality control for HFST must be performed by independent laboratories, and personnel conducting sampling and testing must hold ACI Concrete Field-Testing Technician, Grade 1 certification. Final acceptance of materials and equipment is subject to Department testing and visual inspections for surface texture and uniformity.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Ventura County In And Near Oxnard And Ventura From Central Avenue To 0.6 Mile North Of Victoria Avenue
Solicitation # 07-367604
The California Department of Transportation has issued solicitation 07-367604 for a construction project on State Highway Route 101 in Ventura County, spanning from Central Avenue to 0.6 miles north of Victoria Avenue in and near Oxnard and Ventura. With an estimated project cost of 2,700,000 dollars and a target completion year of 2028, the scope focuses on constructing stormwater treatment Best Management Practices. Key activities include roadway excavation, asphalt concrete paving, concrete curbs, sidewalks, and the installation of Design Pollution Prevention Infiltration Areas and Gross Solids Removal Devices. The project also encompasses extensive landscape work, irrigation installation, and the management of regulated and unregulated earth material containing aerially deposited lead. Contractors must adhere to 2025 Standard Specifications and Standard Plans, ensuring compliance with Buy America/Build America requirements for manufactured products. Critical operational requirements include maintaining full traffic flow when construction is not active and the electronic submission of certified payroll records via LCPtracker Pro. The project involves the protection of various municipal utilities and requires strict adherence to environmental standards, including the management of treated wood waste. Bids are to be submitted on a unit price basis by November 19, 2026, with specific certifications required from a registered civil engineer or professional geologist. Performance is subject to rigorous inspection, including a 6,000 dollar withhold for each missing environmental product declaration.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 25 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS