Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Division 1 Asbestos Abatement

Closed
2026-IFB-070State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of all visible and exposed interior components, as well as the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the April 11, 2024, Micro Air Inc. Mold Testing report, with Indiana state laws prevailing where more stringent than federal requirements. Key deliverables include the provision of a Certified Industrial Hygienist to conduct daily site visits and a final clearance walkthrough, a detailed remediation plan featuring HEPA filtration and negative air pressure, and the submission of all required permits and licenses. This is a small business set-aside opportunity requiring a single lump sum bid. Award decisions are based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Successful offerors must provide proof of a valid Indiana Contractor's License, Davis-Bacon Act wage rate compliance, and specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. The contractor must commence work within 14 days of the Notice to Proceed and provide a sequenced construction schedule within 10 days of that notice. Payment terms are Net 30. Proposals must include a detailed cost breakdown, a timeline for substantial completion, a W9, and a completed vendor questionnaire.
Atterbury Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 562910
New
SLED
Environmental Clean-Up Services
Solicitation # IFB-080-3112101-EL
The County of Orange OC Public Works is soliciting bids under IFB-080-3112101-EL for emergency and non-emergency environmental clean-up services. The scope of work involves investigating and addressing pollution incidents, including accidental spills, illegal discharges, and abandoned materials, across unincorporated communities, County roadways, facilities, harbors, parks, beaches, and Flood Control District channels. Key deliverables include containment and recovery, high-pressure washing, waste management, and specialized remediation such as trauma scene and blood-borne pathogen decontamination. The contract has a not-to-exceed ceiling of 1,500,000.00 dollars, with payments made net thirty days in arrears based on quoted unit rates for labor, equipment, and materials. Qualified contractors must hold California State Contractor License Board Class A and HAZ certifications, maintain a valid U.S. EPA Identification Number, and ensure staff are HAZWOPER certified. Emergency response requirements are stringent, requiring resource confirmation within 10 minutes, a field supervisor on-scene within 30 minutes, and full mobilization within 90 minutes. Bids will be awarded to the lowest responsive and responsible bidder, with preference percentages applied to certified OCLSB and DVBE businesses. Submissions must be made electronically via the OpenGov portal by November 4, 2026, at 2:00 PM PT. Awardees are required to provide a Faithful Performance Bond and a Labor and Material Payment Bond, and must comply with California prevailing wage laws and OSHA safety standards.
OC Public Works

POSTED

1 day ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Division 1 Asbestos Abatement project at the Streets Maintenance Building located at 300 Kilbuck Rd in Riverview Park, Pittsburgh, PA, requires the safe removal and disposal of asbestos-containing materials from Room 101, specifically 4,440 square feet of cementitious wallboard and 3,250 square feet of ceiling board, some of which is partially encapsulated. Work must be conducted in strict compliance with OSHA 29 CFR 1926.1101, EPA NESHAP, Pennsylvania DEP regulations, and PennDOT Publication 408, using engineering controls, negative air containment, and decontamination procedures to prevent fiber migration and maintain full operational continuity of the facility, which serves as a critical hub for regional maintenance activities. The contractor must develop and execute a comprehensive abatement plan that isolates the work zone while preserving access to unaffected areas, complete all removal within 30 days of Notice to Proceed, and ensure site restoration and air clearance certification before final acceptance. All waste must be properly packaged, labeled, transported, and disposed of per regulatory requirements, with full documentation including waste manifests and safety logs submitted to the City. The solicitation, issued under number 2026-IFB-070 with a response deadline of May 27, 2026, follows a Lowest Price Technically Acceptable evaluation approach, awarding to the lowest responsive and responsible bidder whose proposal meets all technical and regulatory minimums. Bidders must submit required documentation including a completed W-9, Vendor Registration Form, Vendor Contact Sheet, Authorized Signatory Information, and EORC Participation Form via the City’s OpenGov platform; failure to include any document renders the bid non-responsive. The City requires DBE participation with documented outreach and reporting on each invoice, and contractors must comply with prevailing wage laws, anti-discrimination statutes, and indemnification obligations. Key personnel substitutions require prior written approval, and an on-site superintendent must be present at all times. Contractors must maintain 24/7 emergency availability, respond to City requests within 24 hours, and perform emergency work within four hours of notification. All work is subject to City inspection at multiple points and must be certified by nationally recognized testing laboratories. No contract value is disclosed, and the City retains discretion to amend, waive, or extend the contract up to 180 calendar days. No specific packaging, preservation, or labeling standards beyond certification and City-owned material

General Info

Asbestos removal at Division 1 Facility, Pittsburgh, ensuring safety and minimal operational disruption.

Place of Performance

PA, USA

Set-Aside

NONE

Documents

4

2026-IFB-070 Division 1 Asbestos Abatement

PDF, High priority: read this firstifb
High

2026-IFB-070 Division 1 Asbestos Abatement

PDF, High priority: read this firstifb
High

Pennsylvania Prevailing Wage Determination Rates 4.13.2026

OCTET-STREAM, High priority: read this firstwage-determination
High

2018 July Asbestos Inspection Report for Public Works 1st Division - B013

PDF, Low priorityreport
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 3, 2026 to May 27, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Public Works
Contacts2 people available
OfficePittsburgh, PA, 15219, USA
Organization / AgencyPennsylvania → Public Works
Office AddressPittsburgh, PA, 15219, USA
Contacts
Rhett HayworthProject Manager
Jacob GoldmannSourcing Specialist

Interested Companies (17)

ConstructConnectCincinnati, OH
North South BridgePittsburgh, PA
Dore & AssociatesBay City, Michigan

See All 17 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Division 1 Facility has undergone comprehensive asbestos testing, which confirmed the presence of asbestos-containing materials (ACMs) in concentrations exceeding applicable regulatory thresholds. Based on the assessment findings, remediation is required to ensure compliance with occupational health and environmental safety standards, as well as to protect building occupants and personnel from potential exposure. The affected materials are located within Room 101 and include both cementitious wallboard and ceiling board. As the Division 1 Facility remains active, the abatement process must be executed in a manner that effectively isolates the remediation zones through appropriate containment and enclosure methods, thereby preventing fiber release and migration into non-impacted areas. Access to unaffected portions of the building, where testing yielded negative results, must be maintained in a safe and fully operational condition for the duration of the project. The selected contractor will be responsible for the removal and lawful disposal of all identified ACMs in accordance with applicable local, state, and federal asbestos abatement regulations. All work must be performed utilizing industry-recognized best practices, including engineering controls, negative air containment, and decontamination procedures, ensuring full regulatory compliance and minimal disruption to facility operations. Additional site-specific information and inspection access will be provided upon request to support the preparation of a comprehensive abatement plan. The Division 1 Streets Maintenance Building, located at 300 Kilbuck Rd in Riverview Park, serves as a critical operational hub for maintenance activities in Pittsburgh, supporting essential infrastructure and service functions across the region. This facility is continuously occupied by maintenance personnel and functions as a centralized location for equipment storage, repair coordination, and logistical support. Because of its central role, any disruption to its daily operations can have a direct impact on the efficiency and reliability of essential city services. Ensuring a safe and compliant work environment within this facility is a top operational priority. Recent asbestos testing conducted as part of routine environmental compliance assessments has confirmed the presence of asbestos-containing materials in Room 101 at levels exceeding regulatory thresholds. Prompt and effective remediation is required to protect the health and safety of employees, meet all applicable regulatory requirements, and maintain uninterrupted facility operations. Because the building must remain fully functional throughout the project, a successful remediation will rely on effective containment strategies, precise scheduling, and minimal interference with active work areas. A contractor who can deliver a compliant, well-coordinated, and low-impact abatement process will significantly enhance operational continuity and overall project success.

More opportunities from Pennsylvania → Public Works

Same awarding agency

NAICS: 237990
New
SLED
Lewis Park Improvements
Solicitation # 2026-IFB-222
The City of Pittsburgh Department of Public Works is soliciting bids for solicitation number 2026-IFB-222 to perform general construction improvements at Lewis Park in Hazelwood. The scope of work includes the construction of two basketball courts, a playground area, a pavilion, and greenspace, as well as associated demolition, earthwork, utility connections, and site restoration. Bids must be submitted electronically via the OpenGov Procurement Platform by November 16, 2026, at 2:00 pm, following a mandatory pre-bid meeting on November 2, 2026. The contract will be awarded to the lowest responsive and responsible bidder on a lump sum basis. Key requirements for bidders include the submission of a completed Schedule of Values, a W-9 form, and an Equal Opportunity Review Commission Participation Form demonstrating commitment to specific socioeconomic goals, including 18 percent MBE, 7 percent WBE, 5 percent VOSB, and 3 percent LGBTQIA+ participation. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price within ten calendar days of the award. All work must comply with Pennsylvania Prevailing Wage rates, ADA standards, and federal safety regulations. Payment will be made through monthly progress invoices, with the City endeavoring to provide payment within 45 days of approval. Final acceptance is contingent upon a pre-final inspection and the completion of a deficiency punch-list within 30 calendar days.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS