Dogtown Road over Indian Creek Bridge Replacement Project Initial Study/MND

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Dogtown Road over Indian Creek Bridge Replacement Project involves the replacement of existing bridge 30C0051 in Calaveras County, California. Under Streambed Alteration Agreement CAL-65720-R2 and pursuant to section 1602 of the Fish and Game Code, the project will install a new structure in the same location that is approximately 2 feet higher and 40 feet longer than the original. The construction scope includes the use of spread footings or short cast-in drill hole piles socketed into rock, the creation of two excavation areas for abutment construction measuring 35 feet wide by 15 feet long by 12 feet deep, and the placement of rock slope protection and construction fill within the Indian Creek channel. Additionally, roadway approaches will be widened and adjusted to align with the grade of the new bridge. The project is managed by Calaveras County and was reviewed by the California Department of Fish and Wildlife, which determined that the project would not have a significant environmental effect within its permitting jurisdiction. This determination is supported by a mitigated negative declaration, and the execution of the project is contingent upon the implementation of specific mitigation measures as conditions of approval. The project is categorized under NAICS code 237310 for highway, street, and bridge construction.

General Info

Calaveras County will replace the Indian Creek Bridge with a larger, higher structure.

Agency

California → Calaveras County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Calaveras County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Calaveras County
Office AddressN/A
Contacts
Evan WestonProject Proponent
Hailey DonaldsonEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number CAL-65720-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Jacob Lile. The project is limited to the replacement of the existing bridge (#30C0051) with a new structure in the same location. The new bridge will be approximately 2 feet higher and 40 feet longer than the existing bridge. The bridge will be found on spread footings or short (10 to 15-foot long) cast-in drill hole piles socketed into the rock. The new bridge abutment construction will require two excavation areas approximately 35 feet wide by 15 feet long by 12 feet deep. Rock slope protection and construction fill will be placed under the bridge and within the Indian Creek channel and the roadway approaches will be widened and adjusted to match the grade of the new bridge.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo is soliciting bids for the West Side Improvements - Bus Stops Package 1 (Solicitation 26-035), a project focused on enhancing community connectivity and mobility. The scope of work involves the rehabilitation of 23 existing bus stops on the west side of Pueblo, including the installation of new concrete pads, sidewalks, curb and gutter, and ADA-compliant curb ramps. Additional improvements include the installation of new or replacement benches and illuminated bus stop signs, specifically utilizing Urban Solar PV Stop+ products. The project is funded through a Federal Highway Administration RAISE Grant and requires strict adherence to the Davis-Bacon Act for prevailing wages, Buy America/BABA requirements, and FHWA construction oversight standards. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid. Key requirements for bidders include a bid security of 5 percent of the grand total bid and the submission of performance and payment bonds prior to the Notice to Proceed. The project has a completion timeline of 180 days, with work commencing within three calendar days of contract execution. Contractors must comply with various federal and local mandates, including EEO bulletin board postings, FFATA reporting, and City of Pueblo licensing and sales tax regulations. All materials and workmanship are guaranteed by the contractor and surety for two years following final acceptance.
Public Works

POSTED

about 14 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement is a federal construction project (STP-9901(663)) managed by the City of St. Louis Board of Public Service. The scope involves the reconstruction of the Union and Lindell Boulevard Bridge over Forest Park Parkway and the MetroLink Railway in St. Louis, Missouri. Key technical requirements include the installation of MSE retaining walls, steel H-piles, drilled shafts, and specific trackwork components such as transition tie spacing and rubberized gap fillers. The project is governed by a hierarchy of specifications, with Job Special Provisions taking precedence, followed by standards from the City of St. Louis, the Missouri Department of Transportation, and the Metropolitan St. Louis Sewer District. The contract carries a performance responsibility value of approximately 27.41 million dollars and a completion timeline of 452 working days, with liquidated damages set at 4,300 dollars per day. Bidders must provide a 5 percent bid deposit and ensure surety companies have a policyholder rating of A- or better and a financial rating of V or higher. Compliance requirements are extensive, including mandatory E-Verify participation, adherence to the Buy America Certification for iron and steel, and a ten-hour OSHA Construction Safety Program for on-site employees. Additionally, the project mandates strict adherence to Disadvantaged Business Enterprise (DBE) goals and the payment of the higher of the Missouri state or federal Davis-Bacon prevailing wage rates. Submissions must be made electronically via the Bid Express Online Portal, accompanied by a comprehensive package including a signed bid proposal, various affidavits, and detailed DBE participation forms. Final acceptance of the project is contingent upon meeting ADA and PROWAG standards, with specific quality control requirements for EPS fill and AASHTO accreditation for third-party concrete testing facilities.
City of St. Louis Board of Public Service

POSTED

about 14 hours ago

DEADLINE

in about 8 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS