Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on August 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Domestic Water, Sanitary & Storm Deferred Maint. FY26

Closed
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-OSU-250084_AE.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Project OSU-260084 involves addressing deferred maintenance for the domestic cold water service line at Converse Hall, with a target construction window in the summer of 2027. Additionally, the project requires a sanitary sewer study to prevent backups from the OSIS into the 12th Avenue Dorms Sanitary Sewer System. The selected Architect/Engineer will provide comprehensive services including program verification, schematic design, construction documents, bidding support, and post-construction services. The selected firm must adhere to University Sustainability Standards and the EDGE Program, while utilizing the university's e-Builder Project Management System for closeout. Construction administration requires at least 10 hours of on-site presence per week. Qualified candidates should demonstrate experience in campus utility infrastructure replacement, sanitary sewer evaluation, and stormwater management, specifically within tunnel environments.

General Info

Architect/Engineer services for Converse Hall water line and sanitary sewer study by 2027.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1

OSU-260084 Domestic Water, Sanitary & Storm Deferred Maint. FY26

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
Contacts
Donovan KitchenProject Manager

Full Description

Show more
Project number: OSU-260084
This project will address deferred maintenance on the domestic cold water service line for Converse Hall. Extents of its replacement will be determined as part of this project. The target construction schedule for this portion of work is the summer of 2027. Concurrent to that waterline design, a sanitary sewer study is needed to determine a method to prevent sanitary sewer backup from the OSIS into the 12 th Avenue Dorms Sanitary Sewer System.
Scope of Services: The project and construction budget as listed in this RFQ is estimated. Current available funding is listed within the RFQ documents. This project has been approved for full design and construction services. This request is for Architect/Engineer (A/E) to provide design and project management to establish the schematic design concept, continue to design development and construction documents. This project will be publicly bid with the selected AE developing bidding documents, providing assistance through the award process, construction administration services and post- construction services. The university may amend the A/E contract if additional funds become available to the project. For projects advertised with an appropriately developed Program of Requirements (POR), upon award of the Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing the Program of Requirements. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A – A/E Terms and Conditions Article 7.2.6. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. F110-02-2024-NOVPublish Date: [leave blank]Page 2 of 6 Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. During the construction period, provide not less than 10 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. The project team (Owner / A/E / Contractor) will be required to utilize the University’s Project Management System, for all compatible services required by the University. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors, and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using the e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1.Utility infrastructure replacement work on a college campus 2.Storm and Sanitary Sewer evaluation experience 3.Experience evaluating utilities within tunnels (preferred) 4.Stormwater management For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must be designed by the Lead Firm.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 238220
New
SLED
OSU-255480, JOC HHW and CHW Meter Replacement
Solicitation # OSU-255480
The OSU-255480 project involves the replacement of existing insertion-style chilled water and heating water meters with in-line electromagnetic flow meters at the James Outpatient Care facility in Columbus, Ohio. The scope of work includes necessary pipe modifications to meet straight-pipe requirements, the installation of 304 stainless steel flow tubes with 316 stainless steel electrodes, and the provision of remote wall-mounted programmable transmitters with a billing accuracy of plus or minus 0.25 percent. Additionally, the contractor must provide and wire OSU and ENGIE compliant gas meter integration, including all required power, building automation, and wiring pathways. All work must adhere to the 2024 Ohio Building Code, NFPA 70, NFPA 70E, and ANSI standards for pipe identification and safety signs. The contract has a trade estimate of 341,000 dollars and a performance period of 120 consecutive days from the Notice to Proceed. Bids are due by October 30, 2026, and will be awarded to the lowest responsive and responsible bidder based on experience, financial condition, and management capability. Key requirements include a 5.0 percent EDGE participation goal, compliance with Ohio prevailing wage laws, and the maintenance of builder's risk insurance on a special causes of loss form. Contractors are required to submit detailed bidder qualifications and a pre-work evaluation regarding construction site safety. Final acceptance is contingent upon a successful final inspection by the Architect/Engineer and the delivery of approved O&M manuals.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS