Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Design Of Cable Creek Basin (Upper)

Active
20260730019State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract seeks engineering design services for the Cable Creek Basin (Upper) in San Bernardino County, California, with the objective of reducing peak flow rates into the Cable Creek Channel and its confluence with the Devil Creek Diversion Channel. The scope includes comprehensive hydrologic and hydraulic analyses, geotechnical services, utility coordination and relocation, environmental compliance under CEQA and NEPA, wetland delineation, CRAM analysis, biological resource assessments, and permitting from state and federal agencies including the US Army Corps of Engineers, Regional Water Quality Control Board, and California Department of Fish and Wildlife. The Consultant must also prepare Engineer’s Cost Estimates and provide necessary survey data—despite surveying data being furnished by the District—for design purposes including control, boundary, and topographic mapping. The project demands prior experience with similar detention basin projects requiring approval from the Department of Water Resources and the Department of State Hospitals. The proposed site is located east of Frontage Road, west of W. Meyers Road, and south of Cable Canyon Road within San Bernardino County, with performance extending over a maximum contract term of five years, though the project itself must be completed within thirty months of award. Proposals are evaluated on a best value basis using a trade-off process, with qualifications and experience weighted at 35%, technical review at 25%, scope of work at 25%, and references at 15%. The Consultant must submit a complete proposal package including mandatory attachments such as an Indemnification and Insurance Requirements Affidavit, certified by an insurance agent, and must maintain all required professional licenses with immediate reporting of any suspension or loss. Key personnel and subcontractors must comply with all contractual obligations, and the Consultant assumes full liability for subcontractor performance. Insurance policies must be primary, non-contributory, and include severability of interests with waived subrogation rights against the District. Proposals must be submitted electronically via the County’s ePro portal with three hard copies and a USB drive, while the fee proposal must be sealed and delivered physically. The Consultant must adhere to prevailing wage laws under the California Labor Code, maintain auditable records compliant with GAAP and federal fiscal guidelines, and submit monthly invoices in arrears via EFT. The District retains the right to terminate for convenience with thirty days’ notice or for cause due to misrepresentation or license loss. All submissions must comply with strict formatting requirements including 11-point font, 3/4-inch margins, and consecutively numbered pages, with no email or fax submissions permitted.

General Info

Design flood control basin in Cable Creek Basin with environmental compliance, regulatory permits, and engineering analyses for San Bernardino County.

Agency

California → San Bernardino County Flood Control DistrictView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

San Bernardino, CA, 92407, USA

Set-Aside

NONE

Documents

(4)

230241CableCreekTopoSBCO2025.dwg

DWG

RFP-PWG126-ADMIN-6438 Design of Cable Creek Basin

PDFrfp

Addendum No. 1 to RFP PWG126-ADMIN-6438 Design of Cable Creek Basin

PDFamendment

California Prevailing Wage Determination C-14-X-2-2026-1

PDFwage-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County Flood Control District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino County Flood Control District
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #PWG126-ADMIN-6438: The project involves engineering design services for the Cable Creek Basin (Upper) to reduce peak flow rates into the Cable Creek Channel and its confluence with Devil Creek Diversion Channel. The goal is to attenuate downstream flows, provide stormwater recharge, and improve water quality. The scope includes preparing hydrology and hydraulic reports, geotechnical services, utility coordination/relocation, environmental compliance (CEQA/NEPA, Biological Resources, Wetland Delineation, CRAM analysis), and regulatory permitting (USACE, RWQCB, CDFW). The consultant is also responsible for creating Engineer's Cost Estimates. Surveying data will be provided by the District, but the consultant must provide necessary survey data for design, including control, boundary, and topographic surveys. The consultant must have experience with similar detention basin projects requiring DSOD and DWR approval.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified firms, specifically targeting Disadvantaged Business Enterprises (DBE), to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, mechanical, electrical, and instrumentation design, as well as the equipping, testing, and commissioning of the groundwater production well. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water standards, Riverside County, and California State Water Resources Control Board regulations. The solicitation is open to various small business set-asides, including SDB, WOSB, and VOSB. Proposals must be submitted by September 1, 2026, and must include a cover letter, a detailed project approach, staff qualifications, a five-year representative project list, and three professional references. Award selection is based on the most advantageous proposal, considering both price and other factors. Selected consultants must maintain active SAM registration, provide a 100 percent performance and payment bond, and adhere to California prevailing wage laws. Payment is processed via monthly itemized statements with a 45-day review period, though federal award reimbursements must be made within 30 calendar days. The contract also mandates strict adherence to Cal/OSHA safety standards and requires a dedicated Project Manager to coordinate all communications with the District.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details