This Government Contract opportunity was posted on October 4, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Doors and Frames Buildings #1, #7 and #8

Awarded
WS1230Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Adams and Associates, Inc., acting for the Department of Labor, is soliciting quotes for a subcontracting project to replace exterior doors and frames at the Woodstock Job Corps Center in Maryland. The scope of work involves addressing specific deficiencies across three buildings, including the installation of nine insulated hollow metal doors and frames with new hardware, weather stripping, and paint. Notably, work in Building 8 requires increasing an opening and providing a new lintel for a door that is currently undersized. All materials must meet ANSI A250.8 standards, and the contractor is responsible for the removal and disposal of all construction debris. The project must be completed within 60 days of the contract award, with payments issued within 30 days of final acceptance. Bidders are required to adhere to Davis-Bacon prevailing wage rates and maintain comprehensive insurance coverage, including general liability and workers compensation. Evaluation criteria focus on cost, schedule, the adequacy of the proposed system, and the contractor's financial stability. The estimated price range for the project is between 10,000 and 16,000 dollars.

General Info

Agency

N/A

Contract Value

$15,975

NAICS

321911 - Wood Window and Door Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Denora BrownPurchasing Agent

Full Description

Show more
Woodstock Job Corps Center On-site services Adams and Associates, Inc., contracting for the Department of Labor, for the operation of the Woodstock Job Corps Center, a 505-student residential training facility located at 10900 Old Court Road, Woodstock, Maryland 21163. We are currently soliciting request for written quotes for the following on-site Service. Exterior doors/frames for Buildings #1,#7 and #8 Deficiencies #71532,#71735,#71737 and #88479. Scope of Work WOODSTOCK JOB CORPS CENTER Exterior doors/frames for Buildings #1,#7 and #8 Deficiencies #71532, #71735,#71737, and #88479 Table of Contents I. Proposal Requirements II. Project Description III. Specific Requirements IV Construction Requirements V. Proposal Form I. Proposal Requirements Project: Owner: US Department of Labor (DOL) Employment and Training Administration Center Operator: Adams and Associates, Inc Mailing address Woodstock Job Corps Center at 10900 Old Court Rd, Woodstock MD 21163 Proposal Due Date: 1 week after site visit Evaluation Criteria: Cost Schedule Evaluation of adequacy of system proposed Financial strength of contractor to replace equipment if it does not meet specification Payment: The Center will make payment within 30 days of completion and acceptance of the project. Site Visit Date: a) Contractor shall visit the site and familiarize himself with the condition under which the work will be performed. No allowance will be made for any error on the contractors part for failure to take into account any conditions or circumstance existing at the site which might affect the contemplate work. The fact that a bid is submitted will be taken as evidence that the contractor has full knowledge of the extent and character of the contemplate work and any problem to be encountered in the performing same. II. Project Description Scope of Project: Deficiency # 71532. Five exterior doors/frames in Building #1 at the following locations need to be replaced: The North end of the fourth floor East wing. The North end of the third floor West wing. The North and South ends of the second floor East wing. The North end of the first floor East wing. Deficiency # 71735. One exterior door/frame in Building #7 at the following location: The Northeast corner of the building. Deficiencies #71737/#88479. Three exterior doors in Building #8 at the following locations: The North exterior door of the facility Maintenance shop Door at the welding lockers/tool room. Door at the Facility Maintenance storage area. III Specific Requirements: - A. Building #1: 1. Replace five exterior doors and frames with new insulated hollow metal doors and hollow metal frames with welded mitered corners. 2. Install new latching hardware and closers. 3. Install weather stripping and door bottoms. 4. These frames are in masonry walls. 5. Finish doors and frames with one coat rust inhibiting primer. 6. Finish with two coats of paint. B. Building #7: 1. Remove the door and frame. 2. Install new hollow metal frame. 3. Install insulated 3'x7' hollow metal door with hardware. 4. Finish door with one coat rust inhibiting primer. 5. Finish with two coats of paint. C. Building #8: 1. Provide three new 3'x7' doors and matching metal frames. A. Door at Facil. Maint. is currently undersized. i. Opening needs to be increased. ii. Provide new lintel to support new opening. D. Doors shall meet ANSI A250.8 Level 3, galvanized steel with polyurethane or polystyrene core and U value of .09. E. Frame shall also comply with ANSI A250.8 Level 14 gauge steel. F. Doors and frames shall be factory prime finished and field painted with exterior grade paint. G. Provide new hardware sets including lockset, hinges, closer, silencers, weather stripping and thresholds. H. All debris from construction i.e. doors, frames, hardware, miscellaneous materials, etc. will be removed from the Center and disposed of properly by the Contractor. Warrantees: The contractor is to provide written warranty for the above statements at time of completion of job IV Construction Requirements Center Regulations: Contractor and his employees shall abide by all of the Center's rules and regulations. There shall be no fraternization between contractor personnel and Job Corps Center students or personnel. The Contractor will be required to follow all Center safety and security requirements. Management of Jobsite: The Contractor shall maintain a clean and safe workplace that is secured at the end of each working day. The Contractor shall clear all deliveries with the Center's security personnel. Wage Rates: The bidders shall conform to the latest Davis-Bacon prevailing wage rate decisions for the area. Insurance: The Contractor shall obtain and maintain insurance as follows: Workman's Compensation/Employers Liability insurance, to meet Maryland statutory requirements Comprehensive General Liability ($1,000,000 per occurrence) Comprehensive Automobile Liability ($1,000,000/combined single limit) Fire Legal Liability ($500,000 per occurrence) The Contractor must cover any deductible costs. Upon contract award, the Contractor must add Woodstock Job Corps academy as additional named insured to the policies. Schedule: The Contractor shall submit a schedule for the work. The project shall be completed within 60 days of the award of the contract. Written authorization is required to extend the 60 day completion requirements. Final Acceptance The Contractor shall notify the Center's facility manager when the project is substantially complete, and shall request an inspection. The completion of this inspection shall determine the date for the commencement of the warrantees, and the date for payment. V. Proposal Form The Contractor's proposal shall be submitted on the Job Corps Center standard proposal form. The Contractor shall submit the following information with the proposal: A list of materials and product data sheets proposed for use. References Copies of Insurance Certificates Proof of a valid Contractor's License for the State of Maryland Note: "THIS IS A SUBCONTRACTING OPPORTUNITY" Please note that a walk-through will be conducted on January 25, 2011 at 9:00 am. Contractors who intend to submit a bid for this solicitation MUST submit the following by e-mail to contact@example.gov or fax to +1 (555) 000-0000 for receipt by close of business (5:00PM EST) on January 14,2011: (1) a positive statement of your intention to submit a bid for this solicitation as a Prime Contractor: (2) statement of bonding capability, to include single and aggregate totals: and (3) listing of experience in work similar in type and scope to include contract numbers, project titles, dollar amounts, and points of contact including phone numbers. Failure to submit all information requested will result in a contractor being considered not interested in this solicitation. Estimated price range is between $10,000.00 - $16,000.00. Tentative advertisement date is July 25, 2012. PLEASE NOTE: The invitation for Bid (solicitation documents) will be available only for bidders who attend the walk-thru at the Woodstock Job Corps Facility scheduled on August 8, 2012 at 9:00am. Bids will be due by COB on August 17, 2012 at 5:00PM. Award will be posted once award has been made. Please note that Adams and Associates, Inc., reserves the right to reject any bids and select the bid deemed most responsible. Bidders should be aware of bid requirements for federally funded projects and act accordingly.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS