Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Doors, Windows, and Glazing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves the installation of openings and glazing for prime contractors working on facility projects for Whitehall District Schools in Michigan. The scope of work requires the delivery of fully installed and functional door and window systems, specifically including the installation of flush wood doors, coiling counter doors, door hardware, fixed louvers, and commercial glazing. The project is categorized under NAICS code 238150. Interested parties should note that the solicitation was posted on November 4, 2026, with a response deadline set for November 11, 2026.

General Info

Documents

This scope was carved out of RFP-WDS-270000000188-2.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP-WDS-270000000188-2 | WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMichigan → Whitehall District Schools
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs openings and glazing for prime contractors on Whitehall District Schools facility projects. Installs flush wood doors, coiling counter doors, door hardware, fixed louvers, and commercial glazing. Delivers fully installed and functional door and window systems.

Similar Contracts

Same NAICS industry code

NAICS: 238150
New
CBP5501 Bldg. 181 Door Replacement Services
Solicitation # CBP5501
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace two commercial storefront door assemblies at the San Diego Job Corps Center Building 181 cafeteria in Imperial Beach, California. The project focuses on improving security, accessibility, and weather resistance. According to Addendum 1, the contractor shall retain existing full-height storefront framing and upper glazing, focusing instead on replacing doors, door-level headers, thresholds, hardware, electrified access-control components, closers, and weather seals, while repairing any minor defects in the retained aluminum framing. The estimated price range for this effort is between 0 and 25,000 dollars, with a performance period of 30 consecutive business days following the receipt of parts or a written Notice to Proceed. Bidders must conduct a physical site visit and sign an attendance roster to be eligible for award. Submissions must include a signed MTC bid form, a detailed cost breakout on company letterhead, proof of insurance, and three references. A bid bond of 20 percent, as well as performance and payment bonds, are only required if the base bid is 25,000 dollars or greater. The contract is subject to the Davis-Bacon Act, ADA compliance, and various Federal Acquisition Regulations, including requirements for a Unique Entity ID (UEI) and small business self-certification. Award will be based on overall best value, with MTC serving as the sole judge of responsiveness.
San Diego Job Corps Center

POSTED

44 minutes ago

DEADLINE

in 8 days
View Details
NAICS: 238150
New
SLED
IH-25043/ State Parking Garage Single Entrance Remodel-1350
Solicitation # IH-25043
Solicitation IH-25043 is a request for the turnkey remodel of a single storefront entrance at the State Parking Garage located at 1350 Lincoln in Denver, Colorado. Managed by the Department of Personnel and Administration, the project has a budget of 75,000 dollars and a completion deadline of May 30, 2027, with final closeout required by June 30, 2027. The scope of work includes the procurement, assembly, and installation of a framing system and glass, as well as electrical and security components. Specific technical requirements include the installation of a Von Duprin motorized latch retraction rim exit device, a Hirsch keypad/proximity card reader, and additional conduit runs. The project also involves the disposal of roll-up door components and the salvage of existing handrails. The contract will be awarded to the lowest responsible bidder, taking into account the Colorado resident bidder preference. Bidders must have attended the mandatory site walk on October 29, 2026, to be eligible. For construction values of 50,000 dollars or more, a bid security of at least 5 percent is required. Performance and labor and material payment bonds, along with insurance certificates and an affidavit regarding illegal aliens, must be furnished within ten days of the notice of award. All work must comply with OSHA standards, 2010 ADA Standards for Accessible Design, and AAMA SFM1 guidelines. Project administration is led by Project Manager Richard Sartirana and Buyer Brady Rog.
DPA - Capital Construction/controlled Maintenance

POSTED

1 day ago

DEADLINE

in 2 days
View Details

More opportunities from Michigan → Whitehall District Schools

Same awarding agency

NAICS: 236220
New
SLED
RFP-WDS-270000000188-2 | WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline
Solicitation # RFP-WDS-270000000188-2
The WDS Bond Proposal Phase 1 is a construction and equipment installation project for Whitehall Middle School in Michigan, managed by Whitehall District Schools. The scope of work is divided into several bid categories, including food service equipment installation, HVAC and plumbing systems, and electrical wiring. Key deliverables include electronic PDF shop drawings, dimensioned rough-in drawings for trade coordination, and detailed daily reports. The project is scheduled to begin on November 26, 2025, and conclude by September 9, 2027. Contractors must adhere to strict technical and administrative standards, including NFPA 70 and various UL standards. Specific requirements include the use of corrosion-resistant metal nameplates for equipment, engraved phenolic plastic signage for controls, and Mylar-protected Code 3 of 9 bar codes for inspection devices. All grading and site improvements must comply with ADA permits. Financial administration is handled through electronic submissions to Clark Construction Company, with a strict monthly deadline of the 25th and a requirement for sworn statements and lien waivers to avoid payment rejection. Bidding requires electronic submission via Building Connected, including a familial disclosure statement, an iron economic sanctions statement, and a criminal background check affidavit. Security requirements include a bid security of at least 5% of the total base bid sum, with full performance and payment bonds required within 10 days of acceptance. Additionally, contractors must maintain a two-day safety plan for school access, coordinate utilities via Michigan 811, and perform continuous red-lining of as-built drawings throughout the project duration.
Commercial and Institutional Building Construction

POSTED

about 13 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS