Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 16, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DORCHESTER REACH - LAKE MARION REGIONAL WATER SUPPLY LINE

Awarded
W912HP-17-R-0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Dorchester Reach Lake Marion Regional Water Supply Line project, solicitation W912HP-17-R-0022, involves the installation and operational startup of approximately 56,239 to 67,400 linear feet of water main pipe with diameters of 20 inches or smaller. Managed by the U.S. Army Corps of Engineers Charleston District, the scope of work includes the placement of a check valve vault, master meter stations, roadway bores, and horizontally directionally drilled pipe. The project also encompasses all necessary valves, appurtenances, testing, quality control, and safety measures. Once completed, the system will be owned, operated, and maintained by Santee Cooper. This contract is a 100 percent small business set-aside under NAICS code 237110, with an estimated work magnitude between 5 million and 10 million dollars. Key modifications to the project specifications included replacing PVC with ductile iron pipe and revising contractor experience requirements. Eligible contractors were required to be registered in the System for Award Management. The project is located in Dorchester County, South Carolina, and follows strict utility protection and design specifications to ensure successful integration into the Lake Marion Regional Water System.

General Info

Contract Value

$13,371,297.83

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

SC, USA

Set-Aside

NONE

Award Issued Date

Documents

5

Amendment 0002 – W912HP17R0022

PDF, High priority: read this first4 pages · amendment
High

Dorchester Reach Water Main COE - 100% Design Specs

PDF, High priority: read this first442 pages · sow
High

Solicitation Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

W912HP17R0022 Dorchester Reach Lake Marion Regional Water Supply Line

PDF, High priority: read this first49 pages · ifb
High

Lake Marion Regional Water Agency July 2017 utility protection plan

PDF, Low priority57 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

Response deadline changed from Jul 21, 2017 to Jul 28, 2017. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Sources Sought → Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Combined Synopsis

Notice updated

Response deadline changed from Sep 15, 2017 to Sep 20, 2017. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Charleston
Contacts2 people available
OfficeCHARLESTON, SC, 29403-5107, USA
Office AddressCHARLESTON, SC, 29403-5107, USA
Contacts
Eugene Marshall BurnsContract Specialist
Henry WigfallContracting Officer

Full Description

Show more
Dorchester Reach - Lake Marion Regional Water Supply Line DESCRIPTION OF WORK: This project includes the installing and placing into successful operation approximately 56,239 linear feet (LF) of 20-inch diameter and smaller water main pipe, a check valve vault, and all associated work. This contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, testing, quality control, safety and all other related work, required to place project into successful operation. This project will be a portion of the Lake Marion Regional Water System and will be owned, operated and maintained by Santee Cooper, South Carolina's electric and water utility. The North American Industry Classification System Code (NAICS) is: 237110, Water and Sewer Line Related Structures with a SBA Business Size $36.5 Million MAGNITUDE OF WORK: $5,000,000.00 TO $10,000,000.00 SMALL BUSINESS SET-ASIDE: Total 100% Small Business Set-Aside The Contractor must be registered in System for Award Management (SAM). If you have any questions or need assistance, contact: Contract Specialist Mrs. Melisa L. Mosley: melisa.l.mosley@usace.army.mil ************************************************************************* AMENDMENT 0001: Released September 14, 2017 Purpose of the Amendmnemt is Extend the Proposal Due Date to September 20, 2017 at 2:00 PM EST. ********************************************************************** Amendment 0002: September 15, 2017 The purpose of this amendment is to make various changes to the specifications (See Attachment).

More opportunities from Department Of Defense → W074 Endist Charleston

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS