Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DOWNSTREAM GUIDE CELL FOR LOCK & DAM 25, NAVIGATION ECOSYSTEM SUSTAINABILITY PROJECT (NESP)

Closed
W912P924S0690Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MO, USA

Set-Aside

NONE

Documents

2

Lock and Dam No. 25 Downstream Guide Cell 65% DQC Review Plans

PDF, High priority: read this firstspecifications
High

Lock and Dam No. 25 Downstream Guide Cell 65% Specifications

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Louis
Contacts1 person available
OfficeSAINT LOUIS, MO, 63103-2833, USA
Office AddressSAINT LOUIS, MO, 63103-2833, USA

Full Description

Show more
Sources Sought Notice W912P924S0690 DOWNSTREAM GUIDE CELL FOR LOCK & DAM 25, NAVIGATION ECOSYSTEM SUSTAINABILITY PROJECT (NESP) This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or make a contract award. NO AWARD will be made from this Sources Sought Notice. This is NOT a request for proposal, quote, or invitation for bid. The sole purpose of this notice is to identify potential System for Award Management (SAM) Database registered businesses that are interested and capable of performing this work in order to determine an appropriate acquisition plan. USACE is not responsible for any costs incurred by interested parties in responding to this Sources Sought. POINT OF CONTACT: Tracy Tenholder, Contracting Officer - contact@example.gov PROJECT INFORMATION The U.S. Army Corps of Engineers (USACE), St. Louis District, is seeking businesses that are interested in and capable of constructing a Downstream (DS) Guide Cell for Lock & Dam 25. Lock and Dam 25 is located approximately 61.5 river miles upstream from St. Louis and 241.5 miles above the mouth of the Ohio River. The contract is anticipated to be a Firm-Fixed-Price Construction contract. The anticipated period of performance for this project is 365 calendar days from issuance of the notice to proceed (NTP). NAICS CODE: 237990 Other Heavy and Civil Engineering Construction SIZE STANDARD: $45M CONTRACT ESTIMATED MAGNITUDE: Between $10,000,000 and $25,000,000. PROJECT DESCRIPTION The proposed project will consist of the construction of a DS Guide Cell to support the new 1,200-foot-long lock planned at L&D 25 in Winfield, MO. The DS Guide Cell will be approximately 50 ft in diameter and will be constructed using cellular sheet pile and founded on 4 ft diameter drilled shafts socketed into bedrock. Steel plates and horizontal corner protection will be provided at the barge impact zone regions of the guide cell. The traffic faces of the cell will have standard steel wall armor on the portions that are cast-in-place concrete. The DS Guide cell will consist of providing all plant, labor, and materials, and perform all operations necessary to complete all the work associated with the Guide Cell. The current Plans & Specs are included with this notice for information purposes. These drawings are at a 65% level of design maturity and are not the final set that will go out with the solicitation. The items of work include but are not limited to: 1. Underwater excavation of site. 2. Drive steel sheet piling for construction of new cell. 3. Install drilled shafts for construction of new cell. 4. Place lifts of concrete in the wet and in the dry inside of sheet piling for new cell and construct reinforced concrete cap at the top of the cell. Concrete will be transported from plant to riverbank by ready mix trucks and transferred to the cell using barge mounted mixers by pump for a distance of approximately 500 feet. 5. Install steel armor for new cell. 6. Install new ladder and on new cell. 7. Install navigation light on new cell. 8. Place riprap for scour protection. CAPABILITY STATEMENT SUBMITTAL All interested, responsive and responsible System of Award Management (SAM) Database registered businesses are encouraged to participate in this Sources Sought by emailing the required information below to the point of contact. If your company is not SAM-registered, please do so at www.sam.gov. Responses shall include the following information and shall not exceed a total of ten (10) pages: 1. Please provide business information in the following format: Business Name: Points of Contact: (Name/Phone/Email) Address: Business Size and Category (Large/Small/8(A)/etc.) in relation to the NAICS code: CAGE and/or UEI Code: Indication of the intent to be a prime contractor or subcontractor Documentation supporting company's capability to bond projects up to $15,000,000 for a single project as a Prime Contractor. 2. Firm's intent to submit a proposal on the pending solicitation once issued (Yes/No). 3. Please provide examples of work that your company has performed as the Prime Contractor in the areas listed below. Include the total contract dollar value and amount bonded by submitting firm as the Prime Contractor. Detail what work was self-performed and what percentage of work was subcontracted. No more than three (3) projects should be provided to demonstrate competency and experience in the required areas of work. Describe past work experience showing all or more than one of the areas listed that were performed under one contract. Projects must have been bonded by submitting firm as the Prime Contractor to be considered. Areas of work involving characteristics that are similar to the types of work described herein: Installation of drilled shafts on contracts of similar size and scope. Marine Construction experience similar in size and scope. Placement of concrete via pumps or other means within inland waterways that allows for continuous placement of high volume lifts over extended periods of time. 4. The Government is considering Invitation for Bid (IFB) under FAR Part 14 as the acquisition strategy for this procurement. Provide your opinions (advantages/disadvantages) on utilizing this type of procurement method. 5. Does your company think a different procurement method other than IFB should be considered for this acquisition? Examples of other acquisition strategies being considered include: IFB with Definitive Reasonability Criteria, Lowest Price Technically Acceptable (LPTA), and Best Value Trade Off under FAR Part 15. If so, please provide your recommendation and rationale for your preferred strategy. 6. If IFB is the selected procurement method, in your opinion, should specific experience be used as a Definitive Responsibility Criteria? If so, what specific experience or certifications would you recommend that the government request to consider as definitive evidence to satisfy this criterion? 7. If IFB is the selected procurement method, in your opinion, should specific equipment be used as a Definitive Responsibility Criteria? If so, what specific equipment would you recommend the government request to consider as definitive evidence to satisfy this criterion? 8. If IFB is the selected procurement method, in your opinion, should specific facilities be used as a Definitive Responsibility Criteria? If so, what specific facilities would you recommend the government request to consider as definitive evidence to satisfy this criterion? 9. Does your company have experience with obtaining Drilled Shaft Foundation Inspection Certifications? 10. During the period of this construction contract, the lock will be continuously open to river traffic except for Approved Lock Closure Periods. The Contractor may request navigation outages where the lock is closed to navigation. The maximum total of allowed outages per month is 96 hours with each outage being no greater than 12 hours. There must be at least 24 hours between each outage to allow for passing of accumulated navigation through the lock. From your perspective, do you foresee any issues with these limitations? 11. Are there any concerns or risks with the anticipated period of performance for this project which is 365 calendar days from NTP? Please outline concerns and provide some recommendations for a different period of performance. 12. Do the draft plans and specs present any constructability risk or concerns? What do you recommend the government change to mitigate those risks. 13. Do you have any concerns with the biddability of this project? Any changes the government should consider to increase biddability. 14. Underwater concrete placement will require a continuous pour of tremie concrete in the cell up to 20 feet in thickness. Pumping distance is approximately 500 feet. Are there any concerns with supplying concrete continuously over an extended period of time in order to meet this requirement? Any information submitted by respondents to this Sources Sought Notice is strictly voluntary. Responses are to be sent via email to Tracy Tenholder no later than 2:00 p.m. CST, 29 April 2024. The subject line of the email shall reference the Market Research number in the announcement. Electronic submittals will be retained for future reference; however, they are to be considered source sensitive and not subject to public disclosure.

More opportunities from Department Of Defense → W07V Endist St Louis

Same awarding agency

NAICS: 562910
New
Federal
ENVIRONMENTAL REMEDIATION SERVICES MULTIPLE AWARD TASK ORDER CONTRACT W912P9
Solicitation # W912P927RA004
The U.S. Army Corps of Engineers St. Louis District is conducting market research through a Sources Sought notice to identify capable businesses for a future Multiple Award Task Order Contract. The anticipated contract is a five year Indefinite Delivery Indefinite Quantity IDIQ with a Firm Fixed Price structure and a total ceiling of 150 million dollars. This effort focuses on Hazardous, Toxic and Radioactive Waste environmental remediation services supporting civilian and military federal agencies. The scope includes a wide range of activities such as sampling, testing, removal, disposal, and restoration of contaminated materials, as well as dredging, wastewater treatment plant operations, and the demolition of contaminated structures. Key programs supported include Superfund, Brownfields, FUSRAP, and the Defense Environmental Restoration Program. Technical requirements include the use of MARSSIM sampling and drilling standards, GIS modeling integrated with the FUSRAP Environmental Data Management System, and performance reporting via an Earned Value Management System. This opportunity is intended as a small business set aside, and interested firms must be registered in SAM.gov and the Procurement Integrated Enterprise Environment. To participate in this market research phase, respondents must submit a capability statement of no more than five pages, including company identification, business size, subcontracting intent, and up to three relevant past performance projects from the last five years, to Marla Sawyer by November 12, 2026.
Remediation Services

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 237990
Federal
LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Solicitation # W912P926RA004
The U.S. Army Corps of Engineers, St. Louis District, is soliciting proposals for the design, construction, and commissioning of a new 1,200-foot drilled-shaft founded lock chamber at Lock and Dam 25 in Winfield, Missouri. This project, part of the Navigation and Ecosystem Sustainability Program, includes the construction of a 1,200-foot upstream ported guard wall and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place to serve as an auxiliary chamber for recreational traffic or emergency use. The contract is structured as a firm-fixed-price base plus options agreement, with a base period of 1,825 calendar days and four optional periods of 365 days each. Award will be determined using a best-value tradeoff process based on five evaluation factors: past performance, construction approach, river and intermediate wall means and methods, small business participation, and price. To be eligible, offerors must be rated at least acceptable in all non-cost factors. The solicitation includes an economic price adjustment clause based on the Producer Price Index for commodities like steel and concrete to mitigate market volatility. Key requirements include the submission of a project labor agreement, adherence to Buy American Act standards, and the use of specific brand-name instrumentation and control systems for compatibility with existing infrastructure. Proposals must be submitted electronically via the PIEE Solicitation module by December 9, 2026.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 111421
Federal
Sources Sought Notice W912P927QA001 Rivers Project Office (RPO) Tree and Plant Material Blanket Purchase Agreement (BPA) Supply
Solicitation # W912P927QA001
The Department of Defense, through the U.S. Army Corps of Engineers St. Louis District, has issued Sources Sought Notice W912P927QA001 to conduct market research for an anticipated five year Blanket Purchase Agreement (BPA). The objective is to identify qualified contractors capable of supplying and delivering tree cuttings, bare root seedlings, and container trees to various locations across Missouri and Illinois, specifically covering alluvial floodplains, upland forests, prairies, and watersheds. All materials must be top quality, healthy, and free from disease or pests, adhering to the American Association of Nurserymen, Inc. rules and ANSI Standard Z60.2 2025. Technical requirements specify that tree cuttings must be between 0.75 and 3 inches in diameter and at least 20 inches long, stored at 33 to 40 degrees Fahrenheit. Bare root seedlings must be at least one year old with a minimum height of 12 inches, sourced from Mississippi River System floodplain sites in Illinois or Missouri. Container trees must be root-pruned to ensure a dense, non-curling root system, with potting mix inoculated with mycorrhizae. Interested firms must be registered in the System for Award Management under NAICS Code 111421 and are requested to submit a capability statement by October 20, 2026, including past performance from the last five years and wholesale pricing for 2027.
Nursery and Tree Production

POSTED

13 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS