Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Drainage and Utility Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of PE-63400-NONST-2027-000000029.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Coffee County CDBG FY25 Street and Drainage Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Coffee County Board of Commissioners
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs drainage systems and underground utilities for prime contractors on Coffee County Board of Commissioners street projects. Performs excavation, trenching, laying drainage pipes, and installing catch basins and manholes. All iron and steel piping must comply with Build America, Buy America (BABA) requirements and GDOT 2025 Construction Standards. Delivers a completed, functional street drainage system.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Keystone Job Corps Building 14 Demo
Solicitation # keystone-job-corps-building-14-demo
The Keystone Job Corps is soliciting bids for the complete demolition of Building 14, the old security building, and its foundation at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work includes the demolition of an old septic system, removal of debris, trees, and rocks, and the subsequent backfilling, grading, and seeding of the area. Critical infrastructure requirements include capping the sewer line and disconnecting building power while ensuring that power and communications remain operational for the guard shack and the mountain pump house and water tank, which may require the installation of new telephone poles. Additionally, the contractor must replace the water shut-off valve with a straight pipe, a task that must be completed within a single day between 8:30 AM and 3:00 PM to minimize water service disruptions for students. This is a small business set-aside solicitation requiring contractors to be active and registered in SAM.gov. The selected contractor is responsible for providing all necessary permits, dumpsters for haul-off, chain of responsibility letters for debris, and traffic control flaggers on Foothills Drive to manage heavy equipment and local traffic. Bidders must provide separate costs for labor and materials. Compliance with the Davis-Bacon Act is mandatory, requiring the payment of prevailing wages and the submission of certified payroll.
Keystone Job Corps

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Georgia → Coffee County Board of Commissioners

Same awarding agency

NAICS: 237310
New
SLED
Coffee County CDBG FY25 Street and Drainage Improvements
Solicitation # PE-63400-NONST-2027-000000029
The Coffee County Board of Commissioners is soliciting sealed bids for the installation of street and drainage improvements on Second Avenue in the Oak Park Community of Coffee County, Georgia. This project, covering 0.0657 miles, is funded through the fiscal year 2025 Community Development Block Grant (Grant Number 25-p-y-034-1-6780) via the Georgia Department of Community Affairs. The scope of work includes providing all necessary materials, labor, tools, and equipment, with a required completion timeline of 270 consecutive calendar days from the Notice to Proceed. All work must adhere to the 2021 GDOT Standard Specifications, 2024 Supplemental Specifications, and 2025 Construction Standards and Details. Bids must be submitted by 11:00 AM local time on Wednesday, November 18, 2026, to the County Administrator in Douglas, Georgia. Proposals must include a bid bond of at least five percent of the lump sum bid and completed Section 3 compliance certifications to be considered responsive. The contract will be awarded to the lowest bidder, though preference may be given to Section 3 contractors if all other criteria, including price, are equal. The successful bidder must provide performance and payment bonds equal to 100 percent of the contract amount within ten days of award. Additionally, the project mandates compliance with the Build America, Buy America Act, requiring all iron, steel, and construction materials to be produced in the United States, and adheres to HUD Section 3 requirements for providing employment opportunities to low-income residents.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS