Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 20, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair and drydock Tug Cheraw

Awarded
W912P4-10-R-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 488390
New
SLED
Derelict Vessel Removal Service Continuing Contract (Disaster)
Solicitation # 26-067
The City of Fort Myers is soliciting proposals for a continuing contract for derelict vessel removal services to be utilized during disaster response scenarios, such as those following Hurricane Ian. The scope of work requires the contractor to provide all labor, equipment, and materials for the stabilization, towing, lifting, transportation, and lawful disposal of abandoned vessels, including boats, personal watercraft, airboats, barges, and floating docks, as well as associated debris within a 300-foot radius. Operations must adhere to strict environmental and safety standards, including FDEP Best Management Practices to prevent turbidity and ADCI, OSHA, and IMCA standards for commercial diving operations. Contractors are required to maintain comprehensive insurance coverage, including Commercial General Liability, Professional Liability Marine Coverage, and Pollution Liability. Proposals must be submitted electronically via the OpenGov portal by November 10, 2026. Evaluation is based on a points system, with a significant emphasis on relevant experience and past performance, specifically requiring a minimum of two completed hurricane-related projects of similar size and scope. The contract is subject to federal funding guidelines, including compliance with 2 C.F.R. Part 200, the Davis-Bacon Act for construction services exceeding 2,000 dollars, and Build America, Buy America requirements. Pricing is based on a line-item fee schedule featuring a unit price per linear foot for removal and disposal, along with flat-rate mobilization fees for both standard and emergency response windows.
Emergency Management (Fire)

POSTED

about 13 hours ago

DEADLINE

in 12 days
NAICS: 488390
International
Provision of a mobile barge system to support a crane and log lifter (approx. 10-ton) to allow PCA to complete the log lifter swap at Dam 11
Solicitation # 5P300-26-0186/A
Parks Canada Agency is soliciting quotations for the provision of a mobile barge system and an appropriately sized crane to facilitate a log lifter swap at Dam 11 in Campbellford, Ontario. The contractor is responsible for providing and assembling the barge to safely transport a 10-ton refurbished log lifter and the crane to the work site, including the loading of tools and the removal of the existing log lifter. If the barge is not self-propelled, the contractor must provide the necessary support vessels. The contract period extends from the date of award until March 31, 2027, with a requirement for a stamped stability analysis to be delivered within one week of the project award. The contract will be awarded to the compliant offer with the lowest evaluated price in Canadian dollars. Bidders must maintain Commercial General Liability insurance of at least 2 million dollars per accident or occurrence and provide proof of WSIB or similar workers compensation coverage. All work must comply with the National Park Act, Part II of the Canada Labour Code, and Canada Occupational Health and Safety Regulations. Bids must be submitted via fax to [phone hidden] or email to [email hidden] by the closing date of November 10, 2026. Submissions via SAP Ariba, courier, or in-person will not be accepted.
Parks Canada Agency

POSTED

8 days ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This amendment to solicitation W912P4-10-R-0002 concerns the repair and drydocking of the Tug Cheraw for the Department of Defense. The primary purpose of the document is to provide formal responses to contractor inquiries and update the location of drawings to include safety specifications. Key technical clarifications include specifying that hull blasting and painting must extend from the keel to a deep load line of 14 feet, and that any bearing liner renewals must be completed as a single piece. The amendment further clarifies that the contractor is responsible for providing a docking facility with sufficient draft, noting minimum requirements of approximately 10 feet at the bow and 14 feet at the stern. Regarding fuel management, the contractor must handle the off-vessel storage, filtering, and return of 8,000 gallons of fuel. Additionally, it is established that the fee for the ABS survey is not to be included in the dry-dock contract and that bidders must price the specific fathometer model listed in the original solicitation.

General Info

Contract Value

$541,473.25

NAICS

488390 - Other Support Activities for Water Transportation

Place of Performance

NY, USA

Set-Aside

NONE

Award Issued Date

Documents

3

Tug Cheraw Drydocking Bid Sheet

PDF, High priority: read this firstbid-schedule
High

Tug Cheraw Drydocking Specifications FY10

PDF, High priority: read this firstsow
High

U.S. Tug Cheraw Repair Special Provisions FY10

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Buffalo
Contacts2 people available
OfficeBUFFALO, NY, 14202-0000, USA
Office AddressBUFFALO, NY, 14202-0000, USA
Contacts
Tyrone B. PalaganasContract Specialist

Full Description

Show more
The Purpose of this amendment is to answer questions submitted 10/16/2009 and 10/19/2009 and to correct statement "Drawings are located at ftp://ftp.usace.army.mil/pub/lrb/Tug%20Cheraw%20Drawings/," at the end of the solicitation to add Safety Specifications. Part I. Questions 10/16/2009 1. ABS Survey - Work Item 2: Is the fee for this survey to be covered by your agency or Contractor? Is this vessel ABS-classed? Or do you just want a "Statement of Fact" survey? What all shall their survey cover? -Answer "The fee for the ABS survey is not to be included in the dry-dock contract." 2. Hull recoat - Work Item 8: please clarify what constitutes the "hull" for this. Up to a certain line? Or all the way up to the top of the bulwarks? - Answer "The blasting and painting of the hull shall be from the deep load line to the keel, with the deep load line cut in at 14 ft. Also, the Contractor shall repaint all draft marks, legends, and plimsols, with one coat of white marine enamel paint." 3. Fuel transfer - Work Item 11: is there somewhere on board the vessel that the 8000 gallons of fuel shall be transferred to? Or shall Contractor store it - to put back on the vessel? Or shall that fuel be replaced with new? By your agency or Contractor? -Answer "The Contractor shall be responsible for off-vessel storage all transferred fuel, then filter and return it to the tanks upon acceptance by the government of this item of work as complete." 4. Fuel tanks - Work Item 11: please clarify what is meant by the term "siamesed together". - Answer "This is an error in the scope of work and refers to a different vessel. Delete the sentence 'The No. 2 center and starboard tanks are siamesed together,' and correct the reference to the 'Chetek' to read 'Cheraw.'" 5. Fathometer - Work Item 15: we have been informed that the Furuno model ED222 is a "legacy" item - for which parts will no longer be made after 2010; and that their model RD30 is replacing that atquite a price reduction. Please advise if you still want Contractor to include the ED222 in pricing. - Answer "Please bid the item listed in the solicitation." Questions 10/19/2009 1. Looking at your draft in the spec and due to the time you want to dry dock your Tug we would have to put you in our small dock. If you can give me your bow and stern drafts of what you may be when you would get her. It would be great to know due to the water level we are at 14-3 above our blocks but with the declivity you will to close with your bow. So if you can supply me with this information, we will decide if we should bid on your project. -Answer "The Contractor shall be responsible for providing a docking facility with sufficient draft for the vessel. With ballast tanks empty and minimal fuel aboard, the minimum draft requirements for the vessel are approximately 10 ft at bow and 14 ft at stern. The stern draft requirement can be reduced to approximately 13 ft by taking on ballast in the bow, but this increases the bow draft requirement. A deck load may be required to achieve a 13 ft stern draft, and shall be supplied by the Contractor if needed." 2. Item 8 CLEAN AND RECOAT THE HULL: Does the entire hull get painted or just up to the water line? Do fenders have to be removed? - Answer "Please refer to the answer to Question 2 from 10/16/2009. No fenders will need to be removed to perform this work." 3. Item 13 BEARING LINER RENEWAL (OPTIONAL): Does the liner have to be one piece or can it be made out of two pieces? - Answer "The liner shall be one piece." Questions 10/20/2009 1. ITEM 10 CLEANING OF FUEL TANKS (OPTIONAL) Does the 8000 gals of fuel get disposed of? - Answer "Please refer to the answer to Question 3 from 10/16/2009. Note that CLEANING OF FUEL TANKS (OPTIONAL) is ITEM 11, not ITEM 10." Part II. Correct final line of Solicitation "Drawings are located at ftp://ftp.usace.army.mil/pub/lrb/Tug%20Cheraw%20Drawings/," is hereby changed to "Drawings and Safety Specifications are located at ftp://ftp.usace.army.mil/pub/lrb/Tug%20Cheraw%20Drawings/."

More opportunities from Department Of Defense → W072 Endist Buffalo

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS