Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

DTLA South Park Properties Sites 2 and 3 Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Los Angeles

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Hope St & 11th St, Los Angeles, CA, 90015

Set-Aside

NONE

Documents

(1)

NOD CPC-2018-2600 Mack Site 2 Environmental Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Kevin LindquistRepresentative

Full Description

Show more
At its meeting of August 5, 2025, the Los Angeles City Council took the actions below in conjunction with the following Project: CPC-2018-2600-ZV-TDR-DD-SPR-MCUP permits the demolition of existing surface parking lot and the construction, use, and maintenance of a 51- story mixed use development comprised of 536 residential dwelling units and up to 4,178 square feet of ground floor commercial uses on a 36,120 square foot area lot pre-dedication and 35,734 square feet of lot area post-dedication. The Project would provide 581 automobile parking spaces for residential use in six subterranean levels and three above-grade levels. The building would have a maximum height of 603 feet, a floor area ratio of 9.13:1 (491,515 square feet), the removal of one street tree on Olive Street and replacement with six new London plane trees; the removal of two street trees on 11th Street and replacement with two Chinese flame trees; and would require the export of approximately 118,543 cubic yards of soil. (1) FOUND, pursuant to Public Resources Code (PRC) Section 21155.2(b), in consideration of the whole of the administrative record, that the SCEA No. ENV-2018-2601-SCEA, was considered and adopted by the City Council on December 11, 2024 (Council file No. 24-0976), adopted Findings pursuant to PRC Section 21155.2 (Transit Priority Project); and, adopted the Mitigation Monitoring and Reporting Program and related Environmental Findings prepared for the SCEA; (2) ADOPTED, the revised FINDINGS of the PLUM Committee, dated June 24, 2025, as the Findings of Council; (3) APPROVED, pursuant to Section 14.5.6 B of Chapter 1 of the Los Angeles Municipal Code (LAMC), a TFAR of up to 274,795 square feet of floor area from the Los Angeles Convention Center (Donor Site), located at 1201 South Figueroa Street, to the Project Site (Receiver Site), thereby permitting a maximum 9.13:1 Floor Area Ratio (FAR) in lieu of the otherwise permitted 6:1 FAR; the TFAR Transfer Payment in the amount of $1,373,975, pursuant to Section 14.5.10 of Chapter 1 of the Los Angeles Municipal Code (LAMC), and Public Benefits Payment in the amount of $11,462,471.39, pursuant to Sections 14.5.9 and 14.5.6B of Chapter 1 of the LAMC; for the demolition of existing surface parking lot and the construction, use, and maintenance of a 51-story mixed use development comprised of 536 residential dwelling units and up to 4,178 square feet of ground floor commercial uses on a 36,120 square foot lot area pre-dedication and 35,734 square feet of lot area post-dedication. The Project would provide 581 automobile parking spaces for residential use in six subterranean levels and three above-grade levels. The building would have a maximum height of 603 feet, a FAR of 9.13:1(491,515 square feet), the removal of one street tree on Olive Street and replacement with six new London plane trees; the removal of two street trees on 11th Street and replacement with two Chinese flame trees; and would require the export of approximately 118,543 cubic yards of soil; for the property located at 1105 – 1123 South Olive Street; subject to revised Conditions of Approval, as amended by the PLUM Committee on June 24, 2025, attached to the Council file; (4) INSTRUCTED the Chief Legislative Analyst to convene the Public Benefit Trust Fund Committee within six months of the receipt of the Public Benefits Payment by the Public Benefit Trust Fund, pursuant to Section 14.5.12 of Chapter 1 of the LAMC; (5) INSTRUCTED the Department of City Planning to prepare any revised Conditions of Approval and Findings to effectuate the following amendment as requested by Council District 14: A payment to the Council District 14 Public Benefits Trust Fund in the amount of $5,731,235.70 (50 percent). The funds shall be to provide Public Benefits as defined by LAMC 14.5.9 A of the TFAR ordinance: affordable housing; public open space; historic preservation; recreational; cultural community and public facilities; job training and outreach programs; affordable child care; streetscape improvements; public arts programs; homelessness services programs; or public transportation improvements; (6) REQUESTED that the PLUM Committee continue to discuss the TFAR policy more broadly. Incidental Case: Vesting Tentative Tract Map No. 82109 permits the merger and re-subdivision of five (5) lots into a 19-lot subdivision for the construction of a mixed-use development consisting of 536 residential condominium units and 4,178 square feet of ground floor commercial floor area; vacation of a portion of the airspace above an alley abutting the site to the northwest. The Project Site is located at 1105 -1123 South Olive Street, Los Angeles CA 90015.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Both structures will feature shallow foundations, structural steel framing, standing-seam roofs, and a combination of masonry and metal panel exterior walls. The scope of work is extensive, covering everything from demolition of an existing engineering facility to comprehensive site improvements, including stormwater retention, utilities, landscaping, and parking. Bids are requested across numerous trades, including concrete, masonry, electrical, mechanical, plumbing, and structural steel. The project adheres to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional structures include a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive site preparation involving rock excavation, grading, and wetland mitigation. Technical requirements include specialized foundation features such as rigid inclusions and load transfer mats, as well as the installation of grounding, lightning protection, and intrusion detection systems. The scope covers a wide array of trades, including structural steel, electrical utilities, plumbing, mechanical systems, and paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS