Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Ductile Iron Pipe (DIP) Water Main Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 26-55-05.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-26-55-05 BCW Cassville White Road Ph2 Widening and Sewer Relocation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Bartow County Government
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs ductile iron water mains for prime contractors on Bartow County Government utility relocation projects. Installs 2,060 total linear feet of DIP water mains, including 1,500 LF of 12”, 160 LF of 8”, and 400 LF of 6” pipe per PC 350 specifications. Requires trenching equipment and pipe laying tools. Must provide insurance and E-Verify documentation. Delivers the installed and tested water main system.

Similar Contracts

Same NAICS industry code

More opportunities from Georgia → Bartow County Government

Same awarding agency

NAICS: 541330
SLED
RFQ 26-35-007 Elm Street from Main Street to SR3 (GDOT PI#0021602) (CB-207)
Solicitation # 26-35-007
Bartow County is soliciting Statements of Qualifications for professional engineering and design services to improve drainage and pedestrian access along Elm Street, spanning from Main Street to SR 3. This project, identified as GDOT PI# 0021602, aims to support the Downtown Development Authority Master Plan by designing new sidewalk infrastructure and enhancing connectivity into Downtown Adairsville. The selected consultant will be responsible for advancing the project from concept development through preliminary design, which includes delivering a Concept Report featuring traffic engineering analyses, roundabout feasibility evaluations, and preliminary construction cost estimates. Additionally, the consultant will assist with construction inspections to ensure compliance with project specifications. The selection process is conducted in two distinct phases. Phase I focuses on shortlisting three to five firms based on experience and qualifications (30%) and resources and workload capacity (20%). Finalists will then proceed to Phase II, where they are evaluated on their technical approach (40%) and past performance (10%). To be eligible, the Prime Consultant must be prequalified by the Georgia Department of Transportation in the required area classes. Submissions must adhere to strict formatting guidelines, including specific page limits and the use of a minimum 11-point font, and must be submitted by the October 23, 2026, deadline. Compliance with the Georgia Security and Immigration Compliance Act and adherence to 48 CFR Part 31 cost principles are mandatory requirements for all participating firms.
Engineering Services

POSTED

22 days ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS