Ductwork Fabrication and Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract encompasses the fabrication, delivery, and installation of a complete ductwork system to support a newly designed HVAC layout, including main trunks, branches, diffusers, and return air components. This work is critical to ensuring proper airflow and climate control across the facilities involved, with all materials and labor required to meet the technical specifications of the updated HVAC system. The project falls under the NAICS code 238220, indicating it is classified as a heating, air conditioning, and ductwork installation subcontract. Awarded by the Pomona Unified School District in California, the contract was posted on July 10, 2026, and is intended to support infrastructure improvements within school facilities. While specific location details such as city or zip code are not provided, the performance location is within the district’s jurisdiction, and the work must be executed in compliance with applicable building and safety codes. The contract does not specify a set-aside type or point of contact, and all obligations are bound to the terms outlined in the subcontract agreement, with performance expected to align with the project’s timeline and technical requirements as defined by the district.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
This scope was carved out of Heating, Ventilation, and Air Condition (HVAC) System Upgrade at Diamond Ranch High School Gym.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
