Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 2, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DVA Livermore Phase C, Utilities Relocation

Closed
W9123823S0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 15 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 15 hours ago

DEADLINE

in about 15 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 15 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 20 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Fremont, CA, 94538, USA

Set-Aside

NONE

Documents

1

Livermore+PHC+Sources+Sought.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
Contacts2 people available
OfficeSACRAMENTO, CA, 95814-2922, USA
Office AddressSACRAMENTO, CA, 95814-2922, USA

Full Description

Show more
PALO ALTO HEALTH CARE SYSTEM LIVERMORE, PHASE C - UTILITY RELOCATION, FREMONT, CA This is a SOURCES SOUGHT NOTICE for Market Research ONLY. NO SOLICITATION, SPECIFICATIONS, OR DRAWINGS ARE AVAILABLE AT THIS TIME. Therefore, please do not request a copy of a solicitation from the Government POCs. This project could be cancelled at any time. Potential offerors having the skill, capabilities and bonding necessary to perform the described project are invited to provide feedback via email to Julie Maxwell at Julie.maxwell@uscae.army.mil. All responses will be used to determine the appropriate acquisition strategy for a potential future acquisition. Particularly, the purpose of this NOTICE is to gain knowledge of potential business sources for the construction of the Department of Veteran's Affairs (DVA) Palo Alto Health Care System Livermore, Phase C - Utility Relocation, Fremont, CA. This project is planned for advertising in or around September of 2022. In accordance with FAR 36.204(f), the estimated value of the resulting contract is expected to be between $1,000,000 and $5,000,000. It is expected to have a duration of approximately 183 days. The resulting contract type is expected to be a Firm-Fixed Price. NAICS 237990 - Other Heavy and Civil Engineering Construction SBA size standard - $39.5 million. Product Service Code Y1NZ - Construction of Other Utilities Under Federal Acquisition Regulation (FAR) guidelines 52.219-14, any 8(a) concern will perform at least 15% of the cost of the contract, not including the cost of materials, with its own employees for specialty general construction. Under FAR 52.236-1, any other-than-small business concern shall perform on the site, and with its own organization, work equivalent to at least 15% of the total amount of work to be performed under the contract. GENERAL INFORMATION As part of the overarching Veterans Health Administration (VHA) National Capital Assets Realignment for Enhanced Services (CARES) plan to improve access, and create a safe, modern environment to treat veterans; Livermore VA Medical Center has been identified to fulfill this vision through construction realignment. The VA has entered into an agreement with the US Army Corps of Engineers (USACE) to serve as the construction agent for the construction, alteration, or acquisition of any VA medical facility that involves a total life cycle expenditure of more than $100,000,000 DVA Project 640-423 contains the requirement for construction of an East Bay Community Based Outpatient Clinic (CBOC) in Fremont, CA. The site where the CBOC will be built is currently incumbered by eight easements: six utility and two planting easements. It also includes multiple lots and a cul-de-sac (Technology Court) which is currently a city-owned right of way (ROW). U.S Army Corps of Engineers (USACE) and the Department of Veteran Affairs (DVA) are working with the Fremont Planning Commission and the City Council for approval to vacate Technology Court and the public utility easements (PUEs), to facilitate construction of the proposed CBOC development plan. A two bid-package acquisition strategy will be executed for this project. The first bid-package will address relocation of existing utilities, demolition of Technology Court and site clean-up. A second future bid-package will address construction of the CBOC and all other remaining project features. A Design-Bid-Build, firm fixed price contract will be used for the utility relocation and site clean-up project and a Design-Bid, firm fixed price contract will used for the future construction of the CBOC. This Source Sought Notice is for Utility Relocation and Site Clean-up. PROJECT DESCRIPTION: PHASE C - Utility Relocation and Site Clean-up The proposed action will consist of trenching and backfill for removal and relocation of existing storm drain, sanitary sewer, water, electrical, and telecommunication utilities, in addition to demolition and removal of Technology Court and site clean-up. Expected period of performance will be 183 days from issuance of the Notice to Proceed for this first utility relocation and site clean-up bid package. CAPABILITY STATEMENT The following requests are designed to apprise the US Army Corps of Engineers, Sacramento District, of any prospective construction contractors project execution capabilities. All types of businesses, large and small, are encouraged to respond to this notice. Please provide your response to the following. The submission is limited to ten (10) 8.5 x 11 pages and a minimum font size of 10. 1) Offeror's name, DUNS#, address, point of contact, phone number, and e-mail address. 2) Offeror's interest in bidding on the solicitation when it is issued. 3) Offeror's capability to perform contracts of this magnitude and complexity and comparable work performed within the past 5 years - Describe your self-performed effort, brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project) - provide at least 3 examples. For Joint Ventures, please include projects completed by the Joint Venture as well. 4) Offeror's socioeconomic type and Business Size (Small Business, HUBZone, Service-Disabled Veteran Owned and/or Small Business, 8(a), WOSB, etc.). 5) Offeror's Joint Venture information if applicable - existing and potential. 6) Offeror's Bonding Capability in the form of a letter from Surety. The Capabilities Statement for this sources sought is not expected to be a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach, but rather short statements regarding the company's ability to demonstrate existing-or-developed expertise and experience in relation to the areas specified herein. Any commercial brochures or currently existing marketing material may also be submitted with the Capabilities statement. Please ensure that all information is submitted as one (1) document. Submission of Capabilities statement is not a prerequisite to any potential future offerings, but participation will assist the Corps of Engineers in tailoring requirements to be consistent with industry capabilities. This synopsis is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. Respondents will not be notified of the results of the evaluation. After completing its analysis, the Government will determine whether to limit competition among 8(a), Service-Disabled Veteran, HUBZone, etc., or all Small Business firms or proceed with full and open competition as Other Than Small Business. Offers that do not meet all requirements or submit within the allotted time will not be considered. Please submit your capability statement not later than 11:00 AM Pacific Time on 1 June 2022. Submit requested information via email to the contract specialist at: julie.maxwell@usace.army.mil. Please include the Sources Sought No. W91238-23-S-0003 in the subject line. Please be advised that this project could be cancelled at any time.

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

NAICS: 237990
Federal
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA
Solicitation # W9123826BA013
The USACE SPK is soliciting design-bid-build construction services for the renovation of three critical irrigation pumping stations—Elkhorn, Riverside, and Pritchard—located along the Garden Highway Levee in Sacramento, California. The project scope involves removing existing discharge piping that penetrates the levees and installing new piping that traverses over the levees to connect with landside irrigation canals. Additional requirements include levee excavation, backfilling, pavement restoration, and utility relocation. The estimated target price range for this effort is between $10,000,000 and $15,000,000, with a total period of performance of 1,095 calendar days from the date of the Notice to Proceed. This requirement is pursued through full and open competition without a set-aside, falling under NAICS code 237110. Eligible offerors must be registered in SAM and PIEE and provide a surety letter confirming bonding capability for a single action of at least $10,000,000. The contract is subject to the Davis-Bacon Act and EM 385-1-1 safety standards. Key administrative requirements include the use of the Resident Management System (RMS) for payment requests and the maintenance of a rigorous Quality Control program. Proposals must be submitted by November 3, 2026, and must include a completed SF 1442, bid guarantee, and a pre-award survey.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 14 days
View Details
NAICS: 237990
Federal
USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, California
Solicitation # W9123827X1CQR
The United States Army Corps of Engineers Sacramento District is conducting market research via Sources Sought Notice W9123827X1CQR for a potential levee repair and remediation project known as the Sacramento River East Levee Contract 5 (SREL C5). Located in Sacramento, California, the project involves remediating approximately 0.4 miles of levee segments south of downtown. The scope of work includes the construction of seepage and stability berms and buried curb walls, utility relocation and protection, soil management, and site restoration. The government estimates the construction value between $6,000,000 and $9,000,000, with an anticipated performance period of 411 calendar days from the Notice to Proceed. The government anticipates issuing a firm-fixed-price solicitation in mid-November 2026, with an intended award date in mid-February 2027. The requirement falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and Product Service Code Y1LC. Depending on the response from small business concerns, the acquisition may be set aside for small businesses under FAR 52.219-14 or competed full and open, in which case FAR 52.236-1 regarding self-performance would apply. Interested parties must submit a capability statement by 11:00 a.m. PT on October 23, 2026, detailing their experience with similar projects over the last six years and providing a surety letter to prove bonding capability.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details
NAICS: 541620
Federal
USACE Sacramento District (SPK) $47.2M Planning, Environmental, and Cultural Services (PECS) MATOC
Solicitation # W9123826RA024
The USACE Sacramento District is soliciting for a 47.2 million dollar Multiple Award Task Order Contract (MATOC) under solicitation W9123826RA024 for Planning, Environmental, and Cultural Services (PECS). This contract, categorized under NAICS code 541620, provides comprehensive support for civil works and military actions throughout the feasibility, design, construction, and operations and maintenance phases. The scope of work encompasses environmental planning and compliance, including NEPA and CEQA tasks, species and habitat surveys, air and noise assessments, and construction monitoring. Additionally, the contract covers cultural resources services, focusing on Section 106 compliance, NHPA, NAGPRA, and ARPA support, tribal consultations, the development of Memoranda of Agreement and Programmatic Agreements, and specific archival and curation requirements. Interested vendors are encouraged to attend a virtual industry meeting on September 15, 2026, at 11:00 AM Pacific Daylight Time via Microsoft Teams. To participate, vendors must submit a capability statement not exceeding four pages to the designated contracting email address prior to the meeting. The primary point of contact for this opportunity is Sean Summer, and the contract is managed by the Department of Defense through the USACE Sacramento District office located in Sacramento, California.
Environmental Consulting Services

POSTED

29 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS