Earthwork and Floodplain Recontouring

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the San Diego County Water Authority involves earthwork and floodplain recontouring in Fallbrook, California. The project focuses on river restoration by excavating approximately 43,000 cubic yards of soil to expand the first terrace of the San Luis Rey River floodplain, effectively replacing agricultural land with naturalized topography. The contractor is required to utilize heavy excavation equipment, including scrapers, dozers, and excavators, to deliver a fully recontoured floodplain terrace. All operations must strictly comply with the Subregional Natural Community Conservation Plan and CEQA regulations.

General Info

Subcontract for earthwork and floodplain recontouring for river restoration in Fallbrook, California.

Agency

California → San Diego County Water Authority

Place of Performance

Fallbrook, CA

Set-Aside

NONE

Documents

This scope was carved out of EPIMS-SDO-16574-R5.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

San Luis Rey Habitat Management Area Restoration Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County Water Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → San Diego County Water Authority
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs soil excavation, grading, and recontouring for prime contractors on San Diego County Water Authority river restoration projects. Excavates approximately 43,000 cubic yards of soil to expand the first terrace of the San Luis Rey River's floodplain, replacing flattened agricultural land with naturalized topography. Requires heavy excavation equipment including excavators, dozers, and scrapers. Must comply with CEQA and the Subregional Natural Community Conservation Plan. Delivers a recontoured floodplain terrace.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS