Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Pennsylvania was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Earthwork and Grading for Sidewalk Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 14 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract involves excavation, leveling, and comprehensive site preparation work necessary for the installation of a sidewalk and retaining wall, including the placement of a gravel foundation to support both structures. The scope encompasses all earthwork and grading activities required to create a stable, properly graded base prior to concrete or hardscape installation, ensuring compliance with engineering and safety standards. Work is to be performed within Washington County, Pennsylvania, with all materials and labor sourced and executed on-site to meet project specifications. This is a subcontract opportunity posted by Washington County, Pennsylvania, with a response deadline of June 5, 2026, at 6:00 PM. The North American Industry Classification System code 237990 designates the work as other heavy and civil engineering construction, aligning it with infrastructure and site development projects. While no specific set-aside provisions or point of contact information are provided, interested contractors must submit proposals through the designated PennBid platform before the deadline to be considered for award.

General Info

Excavation, grading, and gravel foundation for sidewalk and retaining wall in Washington County, PA, due June 5, 2026.

Place of Performance

Washington County, PA, USA

Set-Aside

NONE

Documents

This scope was carved out of Contract No. 26-01.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Contract No. 26-01 – Veterans Park Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Washington County
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, leveling, and site preparation including installation of gravel foundation for retaining wall and sidewalk base.

More opportunities from Pennsylvania → Washington County

Same awarding agency

New
SLED
Rebid of WCTA Fuel System Installation - WCTA PA 2026-1.1GC – General Construction
Solicitation # WCTA PA 2026-1.1GC
Washington County Transportation Authority dba Freedom Transit is soliciting bids for contract WCTA PA 2026-1.1GC to construct a new fuel system at the WCTA Operations Facility located at 375 Berry Road, Washington, PA. The scope of work includes the construction of a concrete fuel tank pad with protective bollards, the installation of one 12,000-gallon gasoline aboveground storage tank and one 6,000-gallon diesel aboveground storage tank, two combo gas/diesel dispensers, two fuel management units, and a metal canopy. The project also requires the installation of all necessary electrical power and control wiring. Bids must be submitted electronically via the PennBid portal by 2:00 PM EST on November 18, 2026. The contract will be awarded to the lowest responsible proposer, with a strong emphasis on the use of Disadvantaged Business Enterprises (DBE). Compliance with Federal Davis-Bacon prevailing wage rates, Buy America requirements, and FTA Circular 4220.1 is mandatory. Bidders must provide a bid guarantee equal to 5 percent of the bid price, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. Project administration will be handled by a Construction Manager, and payments will be processed using AIA Documents G702/CMa and G703. The contractor is responsible for all quality control testing and inspections, and the project includes a 60-day warranty period from the date of installation.

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237310
SLED
Contract No. 26-01 - North Street Bridge Replacement
Solicitation # 26-01
Contract No. 26-01 is a solicitation issued by Robinson Township, Washington County, Pennsylvania, for the demolition and replacement of the North Street Bridge located in McDonald, PA. The project involves replacing an existing concrete bridge with an aluminum box culvert bridge, including the installation of footers, backfilling, riprap installation, storm line relocation, and the placement of Superpave WMA wearing course with keyway milling. Additional requirements include the installation of guiderails, traffic control, erosion and sediment control BMPs, and a permanent post-mounted sign acknowledging funding from the Commonwealth Financing Authority. Redcon Engineering, LLC serves as the project engineer. Sealed bids must be submitted electronically via PennBid by 2:00 PM on Thursday, October 29, 2026. Proposals must include a completed bid form, a non-collusion affidavit, a public works verification form, a nondiscrimination/sexual harassment clause, and a bid bond or certified check equal to 10 percent of the total proposal amount. The contract will be awarded to the lowest responsible and qualified bidder based on price, previous experience, financial ability, and technical data. The project must be completed within 120 calendar days from the issuance of the Notice to Proceed, with liquidated damages assessed at 500 dollars per day for delays. The successful contractor is required to maintain commercial general and umbrella liability insurance of at least 2 million dollars per occurrence and provide full bonding in accordance with the Public Works Contractor Bond Act 1967. All excavation is to be performed on an unclassified basis, and preference is given to domestic construction materials, subject to the Steel Products Procurement Act.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS