Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on July 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Earthwork and Trenching for Utilities

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

1 day ago

DEADLINE

in 11 days
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

1 day ago

DEADLINE

in about 1 year

AI Contract Overview

Show more

The Earthwork and Trenching for Utilities subcontract involves specialized excavation and backfill operations required for the installation of underground sanitary, gas, and electrical utilities. This project is being conducted for the City of Redlands in California and falls under NAICS code 237990. The solicitation was posted on July 22, 2025, with a response deadline set for August 26, 2025. Interested parties can find further details and submission guidelines through the PlanetBids portal.

General Info

Documents

This scope was carved out of 521028.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Joint Utilities Laboratory Building Renovation & Expansion Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Redlands
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Redlands
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation and backfill operations for installation of sanitary, gas, and electrical underground utilities.

More opportunities from California → City of Redlands

Same awarding agency

NAICS: 237310
SLED
Traffic Signal Head Improvements
Solicitation # S400029
Solicitation S400029, also identified as Federal Project HSIPL 5083 (028), is a project for the City of Redlands, California, focused on Traffic Signal Head Improvements. The scope of work includes the project management, labor, and equipment necessary to remove existing equipment and install 88 three-section vehicle heads and 116 three-section backplates with yellow retroreflective borders. The contractor is responsible for all temporary traffic control, including the use of arrow boards, barricades, and flagmen, and must ensure all components are fully operational upon completion. The project is subject to Buy America provisions, federal-aid contract language, and the Standard Specifications for Public Works Construction Greenbook. The contract will be awarded to the responsible bidder offering the lowest bid price. Bidders must provide a bid bond and, upon award, furnish faithful performance and labor and material bonds each equal to 100 percent of the contract price. Work must commence within 10 days of the Notice to Proceed and be completed within 40 consecutive working days. The contractor is required to comply with California prevailing wage laws, Title VI assurances, and the City of Redlands Contractor Safety Program. Final acceptance is contingent upon an inspection by the Engineer, and the contractor must correct any defective workmanship discovered within one year of the final acceptance date.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
SLED
Church Street And San Bernardino Avenue Traffic Signal Installation
Solicitation # S400028
The City of Redlands is soliciting bids for the Church Street and San Bernardino Avenue Traffic Signal Installation project, identified as Project No. S400028 and Federal Project No. HSIPL-5083(029). The scope of work requires the contractor to provide all project management, labor, materials, and equipment for traffic signal installation, signing and striping operations, civil improvements, and utility location and verification. The project includes specific requirements for traffic control, including the use of four changeable message boards and a comprehensive Traffic Control Plan. All work must be completed within sixty working days from the Notice to Proceed and must adhere to City of Redlands standards, Caltrans 2024/2025 specifications, the 2014 CA MUTCD, and the 2024 Greenbook. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must submit their proposals by November 16, 2026, at 2:00 p.m. to the City Clerk's office. Required submission documents include a bid bond of at least 10 percent of the bid amount, a qualification and experience statement, and a non-collusion affidavit. The awarded contractor must provide faithful performance and labor and material bonds for 100 percent of the bid amount. Compliance with the Buy America provisions, ADA standards, and California prevailing wage laws is mandatory. Final acceptance is contingent upon an inspection by the City Engineer following a written assertion of completion by the contractor.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS