Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Earthwork, Grading, and Drainage

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Earthwork, Grading, and Drainage requires comprehensive site preparation activities at Whispering Pines Dog Park and Airport Circle, including clearing vegetation, grubbing, excavation, grading, and the installation of drainage infrastructure such as drain tile. All work must be performed to meet required specifications for drainage efficacy and land stabilization, ensuring proper water management across the designated areas. The subcontract is issued by the City of Douglas under Georgia’s state oversight, with the NAICS code 237310 identifying it as a utility system construction project. Interested parties must submit responses by the deadline of August 5, 2026, at 7:00 PM, with the solicitation posted on June 29, 2026. The work location is within the jurisdiction of the City of Douglas, though specific address details are not provided. Bidder inquiries or further details may be obtained through the official online portal linked in the contract documentation.

General Info

Earthwork, grading, and drainage work at Whispering Pines Dog Park and Airport Circle under City of Douglas contract.

Agency

Georgia → City of DouglasView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Douglas
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Douglas
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform site preparation including clearing, grubbing, excavation, grading, and installation of drainage systems such as drain tile at Whispering Pines Dog Park and Airport Circle.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The Massachusetts Department of Transportation (MassDOT) is soliciting design-build proposals for the replacement of Bridge C-13-038, I-391 over Chicopee Street (ST 116) in the City of Chicopee, with a preliminary estimated cost of $145,760,000. The project requires a four-span bridge with a concrete I-girder superstructure and concrete deck, restoring a six-lane roadway configuration matching adjacent sections of I-391, incorporating a modified CF-MTL5 barrier with snow fence, and ensuring minimum vertical clearances of 16'-6" for the roadway and 18'-0" for the parking area. Site improvements include consolidating parking to 60 spaces south of Chicopee Street, installing a new lighting system on Chicopee Street with foundations on the bridge only, and removing existing light poles, lights on both I-391 and Chicopee Street, and resetting a hydrant. The work is based on the Base Technical Concept, and the Design-Builder must deliver a final design stamped and sealed by their designer of record for approval by MassDOT and third parties. Proposals must be submitted as two separate packages—a Technical Proposal and a Price Proposal—by August 28, 2026, using the AASHTOWare Project Bids platform for pricing and a secure Dropbox link for technical submission. The Technical Proposal is limited to 40 pages, excluding the appendix, table of contents, letter of transmittal, and drawings in 11x17 format, and must be submitted as a searchable PDF with a maximum 11-point Times New Roman font on standard-sized pages. The procurement follows a Best Value Design-Build process, where award is determined by the lowest Overall Value Rating—the total price divided by the cumulative technical score. Technical merit accounts for 65% of the evaluation, weighted across Civil/Traffic (15%), Environmental (5%), Utilities (5%), Structures and Geotechnical (25%), and Construction Staging (15%); Project Management and Coordination comprise the remaining 35%, assessed on personnel experience, quality control, design and construction management, and schedule and cost controls. A 5% Proposal Guaranty is mandatory and constitutes a pass/fail criterion along with proper submission format and organization. The contract is awarded as a lump sum with payments tied to a payout schedule aligned with major
MASSDOT

POSTED

in about 1 month

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a broad range of asphalt paving, striping, and related infrastructure tasks to be carried out across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. Work includes new asphalt placement, overlays with fabric, crack sealing, seal coating, profile grinding, haulage and disposal of grinding spoils, removal of old pavement markings, surface preparation for new striping, stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and upgrades to road drainage systems, which may necessitate permitting. All tasks are performed to maintain and enhance the integrity and safety of airport and maritime roadways and pedestrian pathways. The contract is identified as a forecast for the 2026 fiscal period under the title “Asphalt Paving & Striping Portwide Unit Price 2026” and is governed under NAICS code 237310 for Highway, Street, and Bridge Construction. It is administered by the Port of Seattle through its Port Construction Services division, with primary point of contact Heather Bowden available via email and phone for inquiries. Lesley Miles serves as the project manager. The solicitation is accessible online through the Port of Seattle’s official portal, and work is expected to occur at various port-wide sites without a single fixed location, requiring coordination across a geographically dispersed operational area.
Port Construction Services

POSTED

about 2 hours ago

DEADLINE

N/A
View Details