Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

East Bakersfield High School: Football Scoreboard Installation

Awarded
Bid No. 7086State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing emergency power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to prevent corrosion from salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, secure anchoring to the existing concrete slab using galvanized Grade 5 or higher bolts, and integration with existing fuel and electrical systems. The contractor must also perform generator load testing and adhere to NFPA 70, IBC, and NEC Article 445 standards. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) with an estimated magnitude of $250,000 to $300,000. The period of performance is 270 calendar days from the Notice to Proceed, with a requirement to submit a project schedule within 15 days of that notice. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding and a sound implementation approach. Key compliance requirements include the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and the signing of DHS non-disclosure agreements for all personnel. Payment requests must be processed electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The US Department of Homeland Security, Immigration and Customs Enforcement (ICE) is soliciting proposals for a firm-fixed price task order under an 8(a) Multiple Award Construction Contract (MACC) to upgrade the lighting and occupancy sensors at the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, supervision, equipment, and materials to install energy-efficient LED lighting fixtures and occupancy sensors, as well as the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated value of the project is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. The selected contractor must adhere to Davis-Bacon Act wage determinations, OSHA safety standards, and compliance with the Americans with Disabilities Act, the International Building Code, and American Correctional Association standards. Key deliverables include a quality control plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. Award will be based solely on the lowest total evaluated price. Proposals must be submitted via email to the contracting officer and contracting specialist by September 29, 2026, and must include a detailed pricing template and a management narrative regarding quality control and safety.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40-foot steel FLEXTAINER conex offices for forensic personnel at the St. Thomas HSI Building Crown Mountain Radar Site in the US Virgin Islands. The scope of work includes the construction of two 42 by 10 by 6-inch reinforced concrete slabs and the installation of units equipped with split-system air conditioning, R-11 insulation, vinyl flooring, LED lighting, and security features including steel doors with Cypher locks and security windows. Each unit must also include a 5-pound ABC fire extinguisher and be connected to the nearest electrical circuit via PVC or uPVC conduit. The project is subject to the Buy American Act, NFPA 70, and International Building Code standards. The contract is a Firm-Fixed-Price task order set aside for 8(a) MACC IDIQ contractors, with an estimated magnitude between 250,000 and 300,000 dollars. The award will be based on the lowest total evaluated price, considering the technical approach, safety and quality control plans, and price. The period of performance is 364 calendar days from the Notice to Proceed, and contractors must provide a project schedule within 15 days of that notice. Key administrative requirements include the use of the Invoice Processing Platform for payments, submission of certified payroll, and adherence to US Virgin Islands prevailing wage determinations. Additionally, all personnel must sign a DHS Non-Disclosure Agreement and comply with specific security and cybersecurity training requirements.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 4 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The project involves the complete removal of the existing football scoreboard, including its structural columns and footings, which must be excavated to a minimum of one foot below grade, followed by the installation of a new electronic scoreboard unit. The owner will supply the scoreboard and all associated hardware, while the contractor is fully responsible for providing and installing new support posts and footings that comply with the provided PC drawings, as well as all necessary power and data infrastructure to connect and operate the new system. The contractor must also coordinate the commissioning process directly with the manufacturer to ensure full functionality upon project completion. The solicitation, titled East Bakersfield High School Football Scoreboard Installation and identified by Bid No. 7086, was posted on May 6, 2026, with bids due by June 3, 2026. A bid bond equal to ten percent of the proposed contract amount is required for submission. The project falls under NAICS Code 238210 and is being procured by the Business Services Department of the Kern High School District in California. The designated point of contact for inquiries is Sandy Castorena, reachable via phone and email provided in the solicitation. The anticipated award date is June 8, 2026.

General Info

Remove old scoreboard, install new electronic unit with support posts and infrastructure at East Bakersfield High School.

Agency

California → Business Services Department of Kern High School DistrictView Agency

Contract Value

$149,998.95

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Meet at the East Bakersfield High School Stadium Entrance, 2200 Quincy St., Bakersfield, CA 93306, CA, USA

Set-Aside

NONE

Awardee

KYA Services LLCView Profile

Award Issued Date

Documents

(5)

Bid No. 7086 Non-Mandatory Job Walk Sign-In Sheet

PDFother

Bid No. 7086 - East Bakersfield High School: Football Scoreboard Installation

PDF184 pagesspecifications

Kern High School District - Abbreviations List

PDF15 pagesspecifications

Bid No. 7086 - East Bakersfield High School Football Scoreboard Installation

PDF305 pagesspecifications

02-Notice_to_Contractors.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Contract opportunity posted

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Business Services Department of Kern High School District
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Business Services Department of Kern High School District
View Agency Profile
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: This project includes all labor, material and equipment for the removal of the existing football scoreboard, along with its structural columns and footings, to a minimum of 1 foot below grade, and its replacement with a new PC unit. The owner will provide the scoreboard and associated hardware. The contractor is responsible for providing and installing new posts and footings in accordance with the PC drawings, as well as installing the scoreboard, including new power and data infrastructure. The contractor will also be responsible for coordinating commissioning with the manufacturer.
Notes: Anticipated Award Date is Monday, June 8, 2026
Bid Bond: 10.00%

More opportunities from California → Business Services Department of Kern High School District

Same awarding agency

NAICS: 562910
New
SLED
District-Wide Annual Contract for Hazardous Abatement at Various Sites
Solicitation # Bid No. 7100
The Kern High School District is soliciting bids for a district-wide annual contract for hazardous materials abatement at various sites. The project is anticipated to start on October 1, 2026, with an initial duration of 365 calendar days, though the agreement may be extended year-by-year for up to five years. The scope includes providing all labor, materials, and equipment necessary to perform abatement tasks as defined by individual District Work Orders. The contract will be awarded to the lowest responsive and responsible bidder based on financial standing, general competency, and industry reputation. Bidders must possess a C-22 contractor's license and submit their sealed bids by September 30, 2026, at 2:00 p.m. Required submission documents include a 10 percent bid bond, a contractor's qualification questionnaire, and certifications regarding a drug-free workplace, worker's compensation, and the Iran Contracting Act. For contracts exceeding 25,000 dollars, both payment and performance bonds are required. This is a prevailing wage project governed by California Labor Code Part 7 Chapter I, and contractors must provide fingerprinting certification for all personnel who may come into contact with pupils. The contractor is responsible for strict adherence to Cal/OSHA, NESHAPS, and DTSC standards for waste packaging, labeling, and transport. All work is subject to final visual inspection and written acceptance by the HMS, Inc. Project Manager. Payment is structured based on the duration of the work order: for projects of 60 days or less, 95 percent is paid upon acceptance and 5 percent upon recording a Notice of Completion; for projects exceeding 60 days, monthly payments are made based on the percentage of work completed. Liquidated damages are set at 1,000 dollars per day.
Remediation Services

POSTED

2 days ago

DEADLINE

in 18 days
View Details
NAICS: 562991
New
SLED
District-wide Portable Restroom Facilities & Services
Solicitation # Bid No. 7187
The Kern High School District is soliciting bids for district-wide portable restroom facilities and services to support construction, sporting, and special events. The contract begins on October 1, 2026, and runs through September 30, 2027, with the possibility of four additional one-year extensions. The scope of work includes the rental, delivery, and maintenance of standard and handicap-accessible portable restroom skid units, with or without lighting. All unit pricing is based on a 28-day period. The selected contractor must provide daily waste removal and cursory inspections before events start and must respond to emergency service requests within one hour. Bidders are required to submit a completed bid schedule and a copy of their Environmental Health Permit by September 30, 2026. Compliance requirements include adhering to ADA standards and providing Material Safety Data Sheets for any hazardous substances per California General Order 5194. The contractor must maintain public liability and property damage insurance of at least 1,000,000 dollars per occurrence, as well as required workers compensation coverage. Payment is processed monthly within 45 days of receipt of a satisfactory invoice, and the agreement may be terminated by either party with 30 days written notice. Price escalations for contract extensions are capped at 5% and require justification.
Septic Tank and Related Services

POSTED

2 days ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS