Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on May 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

East Hill Road Culvert RFP

Closed
61186State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County for the demolition and waste removal of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and side wall walkways. Additionally, the contractor is responsible for removing above-grade utilities, capping or abandoning underground utilities, and clearing dumped materials and interior fencing at the neighboring Emory Grove Village parcel. The selected firm will be tasked with procuring all necessary Montgomery County demolition and raze permits, managing the removal of hazardous materials such as asbestos, and stabilizing the property according to the approved Sediment Control Plan. The contract features an initial performance period of four months from the Notice to Proceed. Proposals are due by October 30, 2026, via the OpenGov Procurement Portal and are evaluated based on schedule (20%), price (15%), and MFD participation. Key compliance requirements include adherence to Davis-Bacon and Maryland Prevailing Wage Laws, mandatory background screenings for all personnel, and participation in the HOC Works Program. Awardees must provide 100% payment and performance bonds, proof of insurance, and execute HUD certifications regarding debarment and suspension. HOC will retain 5% of payments until final acceptance, with liquidated damages of up to 1,000 dollars per day for incomplete work.
Real Estate

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 238910
New
Federal
Trenching, Conduit and Ground-well Installation
Solicitation # 19JM3727Q0002
The US Embassy in Kingston, Jamaica, is soliciting proposals for a firm fixed price contract to perform infrastructure support work, specifically trenching, conduit, and ground-well installation at various locations within the embassy compound. The scope of work includes identifying and marking underground utilities, performing trenching across multiple identified locations, and installing Schedule 80 PVC conduit with a minimum 24-inch cover, transitioning to rigid galvanized steel above grade. The contractor is responsible for providing all labor, equipment, and supervision, including a qualified English-speaking supervisor with at least two years of experience. All work must adhere to strict technical standards, including the 2014 National Electrical Code, 2015 International Fire Code, 2019 OBO Design Standards, and the 1990 Americans with Disabilities Act. The anticipated period of performance is 21 days following the issuance of a Notice to Proceed, with work performed Monday through Friday during standard business hours. Award will be granted to the lowest priced, acceptable, and responsible quoter who meets all technical and organizational requirements. Eligible offerors must maintain active registration in the System for Award Management (SAM.gov) and provide proof of Local Insurance and Defense Base Act (DBA) insurance. Proposals must be submitted in PDF format and include a performance bar chart and a detailed business management and technical proposal outlining the firm's experience and past performance over the last three years. Final acceptance is contingent upon the work being completed in a satisfactory manner and the restoration of all work areas to pre-construction conditions.
US Embassy Kingston

POSTED

about 6 hours ago

DEADLINE

in 28 days
NAICS: 238910
New
Federal
Camptonville Housing Decommissioning
Solicitation # 127EAX26Q0076
Solicitation 127EAX27Q0010 is a combined synopsis and request for quotation issued by the USDA Forest Service for the decommissioning of barracks and other buildings at the Tahoe National Forest in Nevada City, California. The scope of work includes demolishing structures, clearing and disposing of debris, capping utilities, and performing HAZMAT mitigation for lead paint, asbestos, and animal feces. This is a total small business set-aside under NAICS code 238910, with a small business size standard of 19 million dollars. The anticipated contract is a firm fixed price award with an estimated price range between 100,000 and 250,000 dollars. The government will award the contract based on the lowest price technically acceptable criteria. Qualified offerors must be registered in the System for Award Management and submit four separate PDF documents, including a signed SF-1442, a price proposal schedule of items, and a technical proposal detailing their approach and past performance. A bid guarantee of 20 percent is required for quotes exceeding 150,000 dollars. The selected contractor must commence work within 10 calendar days of the notice to proceed and complete all activities, including final cleanup, within 90 calendar days. The project is subject to the Davis-Bacon Act and Buy American requirements for construction materials.
USDA Forest Serivce

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Town of Wardsboro is seeking proposals from qualified contractors to install a three-sided box culvert on East Hill Road, Vermont. The project involves reviewing provided plans, obtaining necessary permits, preparing the site, safely removing the existing culvert, and constructing the new culvert according to specified designs. Contractors must also implement erosion control measures and restore the site post-construction, ensuring environmental compliance throughout. Documentation of all activities, including progress reports and as-built drawings, is required upon completion. Proposals should include a detailed timeline, cost estimate, contractor qualifications, references, and proof of insurance and bonding. The evaluation will prioritize technical expertise, adherence to specifications, cost, project timeline, and past performance. The deadline for submission is June 4th, 2024, with the Town reserving the right to reject any proposals and not obligate itself to award a contract or cover proposal costs. Interested parties can contact Jake Garland, the Highway Foreman, for inquiries or submissions.

General Info

Agency

Vermont → Town of Wardsboro

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Town of Wardsboro
Contacts1 person available
OfficeN/A
Organization / Agency
Vermont → Town of Wardsboro
Office AddressN/A

Full Description

Show more
OFFICE OF THE SELECTBOARD Town of Wardsboro P.O. Box 48 Wardsboro, Vermont 05355 Request for Proposal (RFP): Installation of Three-Sided Box Culvert on East Hill Road Project Overview: The Town of Wardsboro invites qualified contractors to submit proposals for the installation of a three-sided box culvert on East Hill Road. This project will utilize plans provided by the Town for the construction of the culvert, encompassing the removal of the existing culvert and all associated works necessary for project completion. Project Location: The project site is located on East Hill Road in Wardsboro, Vermont. Detailed location coordinates and plan specifications will be provided to interested contractors upon request. Scope of Work: 1. Plan Review and Pre-Construction Meeting: Meeting will be held on May 27th @ 9am meeting at the Town Office. - Thoroughly review and understand the plans provided by the Town for the construction of the three-sided box culvert. - Participate in a pre-construction meeting with Town representatives to discuss project specifics, timelines, and any concerns. 2. Permit Acquisition: - Obtain all required permits for the installation of the culvert, including environmental, zoning, and construction permits. - Ensure compliance with all local, state, and federal regulations throughout the permitting process. 3. Site Preparation and Existing Culvert Removal: - Prepare the project site for construction activities, including clearing vegetation and establishing proper access. - Safely remove the existing culvert and dispose of all debris in accordance with applicable regulations and environmental best practices. 4. Construction According to Provided Plans: - Execute the construction of the three-sided box culvert precisely according to the plans provided by the Town, ensuring adherence to all specifications, dimensions, and design requirements. - Utilize appropriate construction techniques and materials to ensure the durability and longevity of the culvert structure. 5. Site Restoration and Erosion Control: - Implement erosion control measures throughout the construction process to minimize environmental impact. - Restore the project site to its original condition upon completion of construction activities, including grading, landscaping, and installation of erosion control features as necessary. 6. Project Documentation and Reporting: - Provide comprehensive documentation of all construction activities, including daily progress reports, as-built drawings, material certifications, and any relevant photographs. - Submit a final project report summarizing the work completed, deviations from the original plans (if any), and any recommendations for future maintenance or improvements. Proposal Submission Requirements: Interested contractors are required to submit the following information as part of their proposal: 1. Proposed project timeline, outlining key milestones, construction phases, and anticipated completion date. 2. Detailed cost estimate, including labor, materials, equipment rentals, subcontractor fees, permit costs, and any additional expenses. 3. Qualifications and experience of key personnel who will be involved in the project. 4. List of references from previous clients for similar projects, including contact information for verification purposes. 5. Insurance and Bonding: Provide proof of insurance coverage and bonding as required by the Town of Wardsboro. Proposal Evaluation Criteria: Proposals will be evaluated based on the following criteria: 1. Technical expertise and experience of the contractor and team members. 2. Compliance with project specifications, including the ability to construct the culvert according to provided plans. 3. Cost-effectiveness and value for the Town of Wardsboro. 4. Proposed project timeline and approach, including the ability to complete the project within the specified timeframe. 5. References and past performance on similar projects, including the quality of workmanship and client satisfaction. Submission Deadline: All proposals must be submitted no later than June 4th at 4:30pm. Late submissions will not be considered. Contact Information: For inquiries and proposal submissions, please contact: Jake Garland Highway Foreman +1 (555) 000-0000 contact@example.gov Disclaimer: The Town of Wardsboro reserves the right to reject any or all proposals received, to waive any informalities or irregularities in the proposals received, and to accept the proposal deemed to be in the best interest of the Town, regardless of price. This RFP does not commit the Town of Wardsboro to award a contract, nor to pay any costs incurred in the preparation of a proposal in response to this request.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS