Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Eaton Wash Stormwater Capture Project - Engineering Design Services

Closed
2024-RFP-0268State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 10 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 13 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The City of Pasadena is spearheading the Eaton Wash Stormwater Capture Project to enhance regional efforts in reducing pollutants such as bacteria in the Eaton Wash, Rio Hondo River, and downstream Los Angeles River. The project involves diverting dry weather and stormwater flows from Eaton Wash into vegetated treatment ponds, followed by storage in a subsurface basin, with the aim of intercepting a significant portion of stormwater runoff from the watershed. The site is located on public property within the Rio Hondo watershed, covering an area of approximately 10,254 acres, predominantly in Los Angeles County. Two potential sites have been identified for development: the primary site at 159 South Kinneloa Avenue, a vacant, brownfield parcel currently used for storage, and a secondary site at 3160 East Del Mar Boulevard, which offers more land for improvements. The primary site is about 55,000 square feet of improvable space on a 128,737 square foot parcel, situated near Eaton Canyon Wash and surrounded by commercial and institutional facilities. The secondary site provides roughly 80,000 square feet of land, bordered by similar land uses. The project aims to incorporate a drop-inlet structure and subsurface BMPs to effectively capture and treat stormwater prior to infiltration, contributing to regional water quality goals. The contract for engineering design services was posted in July 2024, with a response deadline in August 2024, and is valued between $500,000 and $2 million. The project is managed by the Pasadena Public Works Department, with Dawn Petschauer serving as the primary contact.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department, Engineering (American Institute of Architects)
Contacts1 person available
OfficeN/A

Full Description

Show more
The City of Pasadena is leading the development of the Eaton Wash Stormwater Capture Project (Project) to continue the regional scale progress to achieve pollutant load reductions for Bacteria and other priority pollutants in the Eaton Wash, Rio Hondo River, and downstream Los Angeles River. This project proposes to divert dry weather and stormwater flows from Eaton Wash for treatment through a series of vegetated treatment ponds prior to capture in a subsurface storage reservoir. The site is on public property owned by the City of Pasadena and is located within the Rio Hondo watershed. The drainage area for the project is approximately 10,254 acres and is located within the City of Pasadena (15.6%) and the County of Los Angeles (84.4%). The Project is intended to intercept a sizeable portion of stormwater flows from the adjacent Eaton Canyon Wash partially managed by City of Pasadena. A drop-inlet structure is proposed across Eaton Wash on the upstream side of the parcel. A subsurface storage basin infiltration best management practice (BMP) is proposed at the Project site to capture stormwater from the diverted drainage pipe. There are two potential sites that can meet the City's goals.The Primary location, located at 159 South Kinneloa Avenue, is a 128,737 SF parcel that abuts Eaton Canyon Wash to the west, a commercial development to the north, and an urgent care center to the south. It is currently an un-developed site that is used by the City to store concrete k-rail and crash cushions with approximately 55,000 SF of improvable space. The site is also a known brownfield site. Previous soils testing reports and evaluations are provided in the Attachments for reference. The Secondary location, located at 3160 East Del Mar Blvd, has approximately 80,000 SF available land for improvements, that is surrounded by an urgent care to the north, Eaton Canyon Wash to the west and a Boys and Girls Club to the east. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS