Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on July 30, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EDC Conveyor Replacement/Upgrade

Awarded
QSDM-B0-120168-NFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333922
SLED
Asphalt Windrow Elevator
Solicitation # 601440000053907
The Texas Department of Transportation (TxDOT) is soliciting proposals for the procurement of one heavy-duty asphalt windrow elevator designed for high-production road paving. The equipment must be compatible with a Dynapac paver D30T and feature a front dolly wheel system to distribute weight, maintain consistent rolling elevation, and attach directly to the paving tractor to prevent material segregation. The solicitation requires the unit to be in current commercial production, with a warranty covering 100 percent of parts and labor for 12 months or 1,200 hours of operation. Delivery is required to Abilene, Texas, and the unit price must include all shipping and transfer costs. Eligible respondents must be official authorized dealers or distributors with at least three years of experience providing asphalt removal and application systems within the last five years. Proposals must be submitted through the Euna Procurement portal by October 30, 2026, and must include ten specific sections, including a pricing schedule in Excel format, vendor qualifications, and certifications regarding the Texas Family Code and procurement compliance. Evaluation is based on a pass/fail review of document inclusion and vendor performance ratings, followed by a best-value determination. Payments are processed via warrant or direct deposit within 30 days of receiving a correct invoice.
Texas Department of Transportation

POSTED

20 days ago

DEADLINE

in 10 days
NAICS: 333922
SLED
CP25013
Solicitation # CP25013
The Lake Charles Harbor and Terminal District is soliciting proposals for the procurement of one new portal mounted traveling import hopper to be installed at Bulk Terminal No. 1 in Sulphur, Louisiana. The contract includes an option for the owner to purchase an additional unit within 12 months. Proposals are due by 4:00 PM CDT on November 6, 2026, and must be submitted both electronically in PDF and Excel formats and as two bound hard copies. The selection process is based on a 125-point evaluation system, though the highest score does not guarantee a contract award. The selected contractor must provide the physical hopper, related parts, and a spare parts allocation equal to at least 5 percent of the purchase price. Key requirements include the use of in-house engineers, English language proficiency, and the ability to provide local sales support in the Southeast United States. Rigorous packaging standards are mandated to protect equipment from sea spray and ultraviolet exposure during transit, and all safety signage must comply with NFPA 70E. Financial and legal protections include a 5 percent bid deposit, a 100 percent performance bond, and a warranty bond required for the final 15 percent payment. Payment is contingent upon the submission of applications for payment, partial lien waivers, and a final certificate confirming the equipment is free of all encumbrances. The project involves a phased acceptance process, including pre-shipment certification and final verification of commercial operations by an engineer, with the owner reserving the right to use a third-party inspection agency.
Port of Lake Charles

POSTED

22 days ago

DEADLINE

in 17 days

General Info

Agency

N/A

Contract Value

$499,749

NAICS

333922 - Conveyor and Conveying Equipment Manufacturing

Place of Performance

Eastern Distribution Center 1900 River Road, BURLINGTON, NJ, 08016, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

11 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 20, 2012 to Jun 21, 2012. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 21, 2012 to Jun 22, 2012. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline time changed from 6:00 PM UTC to 7:00 PM UTC on Jun 22, 2012. The notice description changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 10:00 PM UTC on Jun 22, 2012. The notice description changed.

Notice updated

Response deadline time changed from 10:00 PM UTC to 11:00 PM UTC on Jun 22, 2012. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Steve M. KinsellaContracting Officer
Stacy LoweContracting Specialst

Full Description

Show more
Amd 0010 ***NOTICE*** The answer to Question #92 is changed from as reads: Question: Will legacy OPTO22 control cabinet I/O be replaced along with the BOSS I system? Answer: Cabinets are to remain To read as: Question: Will legacy OPTO22 control cabinet I/O be replaced along with the BOSS I system? Answer: Cabinets/panel replacements are at the discretion of the vendor dependent on the solution provided. The functionality of the I/O are to be included in the vendor's solution. The due date for receipt of proposals has been extended an additional three hours to account for this change.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS