Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

EDS Equipment Supply & Specialized Installation

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract through the Department of Homeland Security's Workforce and Enterprise Operations involves the supply and specialized installation of Explosive Detection System units for prime contractors on TSA CBIS projects. The scope of work includes the precision placement of units, management of removal routes for decommissioned equipment, and system configuration to ensure all TSA functional specifications are met using specialized rigging equipment. To qualify, providers must hold manufacturer certification for installation and adhere to TSA commissioning standards to deliver fully calibrated units. The opportunity is categorized under NAICS code 334510, with a response deadline set for March 27, 2027.

General Info

DHS subcontract for installing and configuring TSA Explosive Detection Systems by March 2027.

NAICS

334510 - Electromedical and Electrotherapeutic Apparatus Manufacturing

Place of Performance

VA

Set-Aside

NONE

Documents

This scope was carved out of TSA25-04-03026.

The full solicitation package (18 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Planning Guidelines and Design Standards (PGDS) Version 9.0 for Checked Baggage Inspection Systems

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 132 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 18 documents on the prime contractFrom Planning Guidelines and Design Standards (PGDS) Version 9.0 for Checked Baggage Inspection Systems
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Workforce & Enterprise Operations
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs Explosive Detection System (EDS) units for prime contractors on TSA CBIS projects. Performs precision placement of EDS units and manages the removal route for decommissioned equipment. Configures systems to meet TSA functional specifications using specialized rigging equipment. Requires manufacturer certification for EDS installation and TSA commissioning standards. Delivers installed and calibrated EDS units ready for commissioning.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Homeland Security → Workforce & Enterprise Operations

Same awarding agency

NAICS: 488190
Federal
Planning Guidelines and Design Standards (PGDS) Version 9.0 for Checked Baggage Inspection Systems
Solicitation # TSA25-04-03026
The Transportation Security Administration (TSA) has issued an update to the Electronic Baggage Screening Program, introducing the Planning Guidelines and Design Standards for Checked Baggage Inspection Systems Version 9.0 and the CBIS Funding Policy Memo Version 8.0. The PGDS v9.0 establishes mandatory requirements and best practices for the design, implementation, and commissioning of cost-effective checked baggage screening systems, covering the entire project lifecycle from initial schematic design through final testing. All new system designs must comply with these standards, with mandatory practices denoted by the term shall and recommended guidance denoted by should. To facilitate industry collaboration, a comment period for PGDS v9.0 is open until March 31, 2027. The accompanying CBIS Funding Policy Memo v8.0 outlines the eligibility and processes for TSA funding via Other Transaction Agreements (OTAs). It defines the criteria for allowable, allocable, and reasonable costs associated with in-line projects and establishes funding responsibilities for stand-alone Explosive Detection System projects. Project execution involves rigorous oversight, including a multi-stage design review process (30%, 70%, and 100% submissions) and a comprehensive testing regime. This regime includes Site Acceptance Testing (SAT) conducted by the OEM and TSA, and Integrated Site Acceptance Testing (ISAT) conducted by the TSA, followed by a 14-day operational run-in period to validate performance metrics such as throughput capacity and jam rates.
Other Support Activities for Air Transportation

POSTED

about 2 months ago

DEADLINE

in 4 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS