This Solicitation opportunity from California was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Eldwayen Park Point Walkway Improvements Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Eldwayen Park Point Walkway Improvements Project in Pismo Beach, California, entails comprehensive site improvements including the removal and disposal of existing Portland cement concrete pathways and the installation of new ADA-compliant decomposed granite walkways. The contract requires the removal and relocation of existing park amenities such as chain barriers, wood posts, benches, tables, and barbeque grills, followed by the installation of new ADA-compliant picnic tables, grills, and benches. Additional work includes minor surface leveling, hydroseeding, and full site cleanup. The contractor must ensure continuous safe access for pedestrians and vehicles, particularly due to the proximity of ocean bluffs, and install temporary fencing whenever permanent barriers are removed. Work is to be performed in strict compliance with the City of Pismo Beach’s 2024 Standard Specifications for Public Works Construction, the 2026 California MUTCD for traffic control, and referenced Caltrans standards, with all materials and methods subject to approval by the City Engineer. Testing must follow nationally recognized laboratory practices and compliance certificates must be submitted, though these do not absolve the contractor of ultimate responsibility for quality and conformance. The contract mandates completion within 35 consecutive working days, beginning 15 calendar days after receipt of a written Notice to Proceed. Liquidated damages apply for late completion, and time extensions may be granted for delays beyond the contractor’s control. Payments are made on a progress basis, with up to 95% of completed work and material value paid periodically, and retention released within 35 days of formal completion notice. The award basis is the base bid, indicating a cost-driven selection process for technically acceptable proposals. All proposals must be submitted electronically via the PlanetBids portal and include legally binding documents such as bid bonds, performance bonds, labor and material bonds, maintenance bonds, insurance certificates, and affidavits including non-collusion and affirmative action. While no federal FAR clauses apply, local clause-like provisions govern substitutions, inspections, and work standards. The City Engineer serves as the primary authority for inspections, change orders, and acceptance recommendations, with final acceptance residing with the City Council. Although pricing details are blank across all line items, the project scope is clearly defined and bound by municipal specifications, with no FOB terms, federal accounting codes, or military standards referenced. The place of performance is exclusively at Eldwayen Park Point in Pismo Beach, and no alternate delivery locations or packaging requirements are specified beyond general material storage and preservation standards.
General Info
Agency
NAICS
Place of Performance
Pismo Beach, CA, 93449, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
