Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electric Arc Furnace removal ,acquisition and installation

Closed
W519TC26R028Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The U.S. Army Contracting Command – Rock Island is seeking a contractor to procure, install, commission, and remove foundry equipment at the B212 foundry in Rock Island, Illinois, under solicitation W519TC26R028. The scope includes the demolition and removal of existing 5-ton and 3-ton arc furnaces, concrete work, detailed design engineering, project management, and the installation of a new 5-ton electric arc furnace with an optional second unit, along with a 5-ton AOD system, baghouse dust collection system, compressed air and argon storage tanks, and associated power systems, ductwork, and fume hoods. The contract requires comprehensive training for operators and supervisors on process, safety, preventive maintenance, and practical equipment use, as well as full equipment commissioning. All equipment must comply with stringent marking and labeling requirements, including a main data plate with UID-compliant information such as manufacturer name, model and serial numbers, and contract number, using corrosion-resistant materials and bold English lettering with contrasting backgrounds; lubrication points, hazard labels, and emergency stops must also be clearly identified and labeled in standard English units. The contract is a Firm Fixed Price (FFP) award under the Lowest Price Technically Acceptable (LPTA) methodology, where proposals must pass a pass/fail technical evaluation covering experience—requiring the manufacturer to have supplied similar equipment for at least three years—and strict compliance with the Request for Information and Proposal Description (RIPD). Offers must be submitted electronically by 12:00 PM CST on June 8, 2026, following a site visit scheduled for May 8, 2026. Delivery is due no later than September 17, 2027, under FOB Destination terms to Rock Island, Illinois, with transportation costs borne by the contractor. The contractor must register in SAM and WAWF, comply with cybersecurity requirements including DFARS 252.204-7012, and adhere to DoD antiterrorism and information assurance protocols such as the Random Antiterrorist Measures Program and restrictions on unapproved data storage devices. All equipment must be registered in the IUID Registry, and technical documentation—including operation and maintenance manuals, MSDS sheets, and CDRL data items—must be delivered per specified timelines and formats, with full compliance enforced at destination inspection by DoDAAC W52H1B. Contractors must

General Info

Design, install, demolish 5-Ton Electric Arc Furnace, AOD system, equipment, training at Rock Island.

Agency

Department Of Defense → W6QK Acc-RiView Agency

NAICS

333248 - All Other Industrial Machinery ManufacturingView NAICS

Place of Performance

Rock Island, IL, 61299, USA

Set-Aside

NONE

Documents

(3)

Exhibit+A+CDRL+Contractor+Large+Furnaces.docx

DOCX

Solicitation+-+W519TC26RA028.pdf

PDF

Attachment+0001+RFIPD+dated+24+March+2026.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Ri
Contacts2 people available
OfficeROCK ISLAND, IL, 61299-0000, USA
Organization / Agency
Department Of Defense → W6QK Acc-Ri
View Agency Profile
Office AddressROCK ISLAND, IL, 61299-0000, USA

Full Description

Show more

AMENDED CLOSING DATE:  The closing date for this solicitation has been extended to 8 June Noon CST



U.S. Army Contracting Command - Rock Island (ACC-RI) has a requirement to provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. 


Please review attachments for complete requirement. Note a site visit for this requirement is scheduled for 8 May 2026 at 8am. 

More opportunities from Department Of Defense → W6QK Acc-Ri

Same awarding agency

NAICS: 237110
New
Federal
Install Utilities - RV Campground Site - Rock Island Arsenal (Amendment 0003)
Solicitation # W519TC-26-R-A072
The Army Contracting Command - Rock Island is soliciting proposals for a commercial firm-fixed-price construction contract to install utilities for a new RV campground site at the Rock Island Arsenal in Illinois. This 100% small business set-aside project involves the installation of an 8-inch HDPE water main with a fire hydrant, a 1-inch gas main with a meter, and a 13.8 KV overhead electrical service leading to a 750 KVA transformer. The work must adhere to the 2026 Iowa State Urban Design and Specifications Program (SUDAS) and USACE EM 385-1-1 (2024) safety standards. The contractor is required to complete the project within 180 working days from the Notice to Proceed, with liquidated damages set at 1,000 dollars per calendar day of delay. Proposals are due by September 15, 2026, and must include a total firm-fixed-price bid, a high-level project schedule, resumes for a Quality Control Manager and Site Safety and Health Officer, and evidence of past performance on similar utility projects. The government will award the contract based on the best overall value, conducting a comparative analysis of price, schedule, personnel, and past performance. Required responsibility documents include a bid bond of 20 percent of the bid price or 3 million dollars, whichever is less, and proof of current contractor licensing. Payment will be processed electronically through the Wide Area WorkFlow system.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS