Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from General Services Administration was posted on March 2, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electric Vehicle Equipment Feasibility Study

Closed
SPD-EV-Feasibility-2022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 17 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

DC, USA

Set-Aside

SDVOSBC

Documents

4

Amendment+0001+EVSE+Feasibility+Study+Final+2022+3+2.pdf

PDF

Attachment+A+-+List+of+VAMCs+included+in+Feasibility+Study+%282%29+%281%29.pdf

PDF

Sources+Sought+Synopsis+Electric+Vehicle+Equipment+Feasibility+Study+2022+1+26.pdf

PDF

SOW+-+EV+Charging+Feasibility+Study+V2+%282021-10-20%29+-+10-29-21_MBR+%28002%29+%281%29+%282%29.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R00 Special Programs Division
Contacts2 people available
OfficeWASHINGTON, DC, 20405, USA
Office AddressWASHINGTON, DC, 20405, USA

Full Description

Show more
The Government requires a comprehensive analysis, evaluation, and report for the installation of Electrical Vehicle Charging Stations (EVSE) at the VHA Medical Centers (VAMCs) identified in Attachment A. This work shall include the analysis and evaluation of the existing electric utility supply capacity, solar photovoltaic (PV) power system energy production (if applicable), and existing electrical power distribution system condition, capacity, loading, and available space, along with providing recommendations, phasing, preliminary scopes of work, budgetary estimates, and life cycle cost analysis for converting 100% of the existing Department of Veterans Affairs Medical Center (VAMC) gasoline-powered light duty vehicle fleet to all electric vehicles (EVs) at each VAMC identified in Attachment A per the attached Statement of work (SOW). The Government anticipates award of a Firm Fixed Price contract with the contract performance period of seven hundred thirty (730) calendar days. The work shall be performed for the Department of Veterans Affair and the Medical Centers (VAMCs) for 135 sites (option up to 172 sites) across the contiguous United States. This project is not funded at this time and will be funded prior to award. The disclosure of magnitude for this project is $10,000,000 and $15,000,000.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS