Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Electrical & Generator Systems Engineering

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

A new 75-kW permanent generator system is being designed with comprehensive engineering specifications that include detailed load calculations to ensure proper sizing and performance under operational demands. The scope entails upgrades to the existing electrical distribution infrastructure to accommodate the generator’s output and integrate seamlessly with current systems. All design work must comply with the National Electrical Code (NEC) requirements for clearance, spacing, and safety distances, as well as incorporate flood protection measures to safeguard the generator and associated equipment from water damage under extreme weather conditions. The project is structured as a subcontract under the NAICS code 541340 for Engineering Services and is being managed by the Finance agency in Florida. Proposals must be submitted by September 9, 2026, and the work is expected to be performed in alignment with federal and local regulatory standards to ensure long-term reliability and operational safety.

General Info

75-kW generator system design with NEC compliance, flood protection, and infrastructure upgrades under NAICS 541340.

Agency

Florida → FinanceView Agency

NAICS

541340 - Drafting ServicesView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Finance
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Finance
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design for a new 75-kW permanent generator including load calculations, electrical distribution upgrades, and compliance with NEC clearance and flood protection standards.

Similar Contracts

Same NAICS industry code

NAICS: 541340
New
International
Commissioning, Testing, and System ValidationThe contract involves the commissioning, testing, and system validation of uninterruptible power supply (UPS) systems at an airport facility in Jamaica to ensure functional integrity, load capacity, and failover reliability under operational conditions. The work is scoped to include comprehensive performance testing under real-world and simulated stress conditions to verify that the UPS systems can maintain critical power continuity during grid fluctuations or outages, directly supporting the airport’s operational readiness and safety protocols. The testing scope encompasses not only initial functional checks but also load testing to confirm system capacity under full demand and failover validation to ensure seamless transitions between power sources without disruption to essential airport services. This subcontract is issued under the Government of Jamaica’s JCA Project and Initiatives Implementation division, classified under NAICS code 541340 for engineering services, and is intended to support infrastructure reliability critical to aviation operations. The posting date indicates an anticipated award timeline in 2026, with no solicitation number or set-aside details provided, suggesting a direct award or internal procurement process. All testing activities are to be performed at the airport’s location, with the full responsibility for execution, documentation, and validation resting with the selected contractor to meet stringent performance benchmarks required for a high-traffic transportation hub.
JCA Project and Initiatives Implementation

POSTED

2 days ago

DEADLINE

N/A
View Details

More opportunities from Florida → Finance

Same awarding agency