Electrical and HVAC Equipment Replacement by San Diego Convention Center Corporation at the San Diego Convention Center

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Diego Convention Center Corporation plans to replace aging electrical and HVAC infrastructure within the Convention Center’s central plant, including the switchgear, backup generator, boilers, chillers, and associated pumps, to ensure reliable heating, cooling, and power services. The switchgear and generator will be replaced with new equipment of identical size and capacity, with delivery and installation occurring entirely indoors via the Convention Center’s loading docks. Work is scheduled to begin in October 2027 and conclude in January 2028 for this component, while the broader central plant renovation will span from August 2027 to March 2029, requiring phased removal and installation of multiple systems over approximately 1.5 years. To facilitate equipment removal and delivery, a crane will be positioned on a section of the adjacent Marriott Marquis parking lot near the Harbor Drive entrance to the Convention Center’s parking garage. This will necessitate temporary closures of the second-floor mezzanine pathway and the Canyon Path during four specific periods: August–September 2027, February–March 2028, August–September 2028, and February–March 2029. A detailed Public Access Program, including signage, detours via the Grant Stairway and Marina Walk, and maintenance of promenade access, must be submitted for approval 45 days prior to any closure. All access routes will be restored immediately if any delivery or removal activity finishes ahead of schedule.

General Info

Replace electrical and HVAC systems at Convention Center 2027–2029 with crane work causing temporary path closures.

Agency

California → San Diego Unified Port District

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

San Diego Convention Center Electrical and HVAC Equipment Replacement Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Luis DuranSenior Planner
Anselmo MartinezDirector of Engineering and Capital Projects

Full Description

Show more
The proposed project would involve replacement of an existing switchgear, backup generator, and chiller/boiler equipment inside the Convention Center's central plant by the San Diego Convention Center Corporation ("Applicant) in the city of San Diego, California. The project would replace aging infrastructure with new equipment to provide appropriate heating, ventilation, air conditioning (HVAC) and electrical power service to the Convention Center. Work to specifically complete the proposed project would involve the following: • Generator and Switchgear Replacement - Replacement of existing switchgear and backup generator. New equipment would be delivered via the Convention Center's loading docks, and all work would be internal within the Convention Center. The size and capacity of the new switchgear and generator would be the same as existing. Construction would begin in October 2027 and complete in January 2028 • Central Plant Renovation - Phased removal and replacement of all existing boilers, chillers, pumps and associated equipment in the Central Plant. A crane would be placed on a portion of the Marriott Marquis's parking lot near the entrance of the Convention Center's parking garage accessed through Harbor Drive for removal and replacement of equipment. For the safety of the public during removal, delivery, and replacement of equipment, temporary closures of the second-floor mezzanine pathway and the "Canyon Path" would be necessary. Applicant shall provide a Public Access Program for District's review and approval 45 days before the commencement of any closures. The Public Access Plan shall detail public access to promenade, including relevant signage and detours through the ·Grant Stairway" as well as through the "Marina Walk". The projected dates for the Canyon Path and mezzanine path closures are: o August - September 2027 o February - March 2028 o August - September 2028 o February - March 2029 Construction of the proposed project is anticipated to occur between August 2027 and March 2029 and would take approximately 1.5 years to complete with ongoing installations, modifications, maintenance, and removal as needed. If any removal and delivery date is completed early, all access shall be opened immediately.