Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Commerce was posted on July 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Construction

Closed
1333ND24RNB190010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing detailed oil testing analysis. Additionally, the contractor is required to evaluate nitrogen blanket systems to ensure positive pressure is maintained, provide on-site training for agency staff on inspection tools, and develop comprehensive standard operating procedures. All work must adhere to strict technical and safety standards, including ASNT Level 1 certification for thermography, ASTM D923 and D924 for oil sampling, and NFPA 70E safety protocols. The agency intends to make a single award to the most capable and cost-effective offeror, evaluating candidates based on their staffing plan, personnel availability, fee structure, and a proven track record of performing similar projects for utilities or industrial facilities. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as non-collusion and workers compensation. The resulting contract will feature fixed pricing for an initial term with potential one-year extensions. Awardees must comply with California Labor Code prevailing wage requirements and maintain strict confidentiality regarding all agency reports and data.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, testing, repairing, and certifying emergency lighting systems across the facility, including the cafeteria, recreation building, and dormitories. Key tasks include performing functional tests by simulating utility outages, replacing failed ballasts with LED-compatible versions, and applying durable labels to fixtures for future tracking. The contractor must ensure full compliance with NFPA 101 (2024 Edition) and NFPA 70 standards, integrate recurring maintenance into the center's Computerized Maintenance Management System, and provide certificates of disposal for hazardous materials. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the Notice to Proceed. Bids are due by December 1, 2026, and must include a detailed cost breakout and a mandatory physical site visit. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This solicitation is set aside for small businesses and various SBA-certified categories. Award decisions will be based on overall best value. Compliance requirements include adherence to the Davis-Bacon Act, Federal Contractor Minimum Wage, and FAR regulations regarding work hours, safety standards, and the Buy American Act.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Gaithersburg, MD, 20899, USA

Set-Aside

SBA

Documents

35

1333ND24RNB190010 Amendment 001

PDF, High priority: read this first1 page · amendment
High

B101 – New Receptacles at Veranda SOW

PDF, High priority: read this first5 pages · sow
High

B101 New Receptacles at Veranda – Statement of Work

PDF, High priority: read this first5 pages · sow
High

Circuit Routing Along Granite Base Amendment 0001

PDF, High priority: read this firstamendment
High

Guidelines for OFPM Contractors and A/E Firms – May 25, 2022

PDF, High priority: read this first21 pages · guidelines
High

List of Attachments - SEED Project SOW and Safety Docs

PDF, High priority: read this first1 page · sow
High

NIST N 7101.64 Electrical Safety Notice

PDF, High priority: read this first37 pages · special-notice
High

NIST Response to RFIs - Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

NIST S 7101.21 Personal Protective Equipment (PPE)

PDF, High priority: read this first21 pages · sow
High

NIST S 7101.24 Incident Reporting and Investigation

PDF, High priority: read this first29 pages · suborder
High

NIST S 7101.55 Hearing Protection Program

PDF, High priority: read this first19 pages · safety-instruction
High

NIST S 7101.56 Control of Hazardous Energy (LOTO)

PDF, High priority: read this first24 pages · sow
High

NIST S 7101.57 Permit-Required Confined Spaces

PDF, High priority: read this first25 pages · sow
High

NIST S 7101.58 Respiratory Protection

PDF, High priority: read this first23 pages · safety-instruction
High

NIST S 7101.66 Ladder Safety

PDF, High priority: read this first18 pages · safety-program
High

NIST S 7101.67 Fall Protection

PDF, High priority: read this first17 pages · safety-directive
High

NIST S 7101.74 Powered Industrial Trucks

PDF, High priority: read this first18 pages · sow
High

NIST S 7401.01 Fire Protection & Life Safety for Design and Construction

PDF, High priority: read this first42 pages · sow
High

NIST S 7401.02 Inspection, Testing, and Maintenance of Fire Protection Systems

PDF, High priority: read this first39 pages · sow
High

NIST S 7401.03 Impairment of Fire Protection and Life Safety Systems

PDF, High priority: read this first20 pages · specifications
High

NIST S 7401.04 Fire Prevention During Welding, Cutting, and Other Hot Work

PDF, High priority: read this first19 pages · specifications
High

Original Power Library Bldg 101 Amendment 0001

PDF, High priority: read this first1 page · amendment
High

Panelboard Pictures Amendment 0001

PDF, High priority: read this firstamendment
High

SF 1442 Solicitation - Electrical Construction MATOC IDIQ

PDF, High priority: read this first49 pages · rfp
High

Veranda Ext Arch Struct Detail Bldg 101 Amend 0001

PDF, High priority: read this firstamendment
High

Wage Determination MD20240053 - Montgomery County, Maryland

PDF, High priority: read this firstwage-determination
High

Attachment 1 - Resume Form for Key Personnel

PDF, Low priority2 pages · other
Low

Attachment 3 - Past Performance Questionnaire (PPQ)

PDF, Low priority5 pages · past-performance-questionnaire
Low

NIST O 7401.00 Fire and Life Safety Order

PDF, Low priority12 pages · directive
Low

NIST P 7400.00 - Fire and Life Safety Policy

PDF, Low prioritypolicy
Low

NIST PR 2103.06 Utility Outages

PDF, Low priority10 pages · procedure
Low

NIST S 7101.20 Hazard Reviews

PDF, Low priority29 pages · policy
Low

NIST S 7101.65 Machines, Power Tools, and Associated Equipment Safety

PDF, Low priority9 pages · safety-policy
Low

Project Data Sheet

PDF, Low priority3 pages · project-data-sheet
Low

Site Visit Sign-In Sheet - PR 1333ND24RNB190010

PDF, Low prioritysite-visit-attendance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Richard 'Trent' Stevens

Full Description

Show more
The National Institute of Standards of Technology (NIST) Office of Facilities and Property Management (OFPM) intends to award an Indefinite Delivery Indefinite Quantity (IDIQ) task order contract(s) for Electrical Construction. The Period of performance shall be a five-year ordering period. All work and services will be ordered by issuance of individual firm-fixed priced task orders. The IDIQ contract is estimated to have a total Contract ceiling over the entire five-year period of performance not to exceed $9,000,000. Individual year task order values may or may not exceed the estimated values. The guaranteed minimum for the life of the Contract, is $4,000. This is a 100% set-aside for Small Business firms. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Proposals must be complete, self-sufficient, and respond directly to the requirements set forth in solicitation. Offerors who fail to submit all required information per the instructions may be deemed non-responsive and may not be considered for award. The following instructions will establish the acceptable requirements for the format and contents of proposals. Proposal Submission. The Government will be accepting electronic submission via email only. Offerors are required to submit their proposals electronically via email to the following addresses: i. Tamela.Lewis@nist.gov ii. Richard.Stevens@nist.gov. Offerors shall use the following email subject line - Electrical Construction IDIQ _ 1333ND24RNB190010 Submission due dates: Site Visit: July 9, 2024, at 10:00am EST RFI Due Date: July 12,2024, at 3:00pm EST RFQ Due Date: July 25,2024, at 1:00pm EST An organized site visit is scheduled for: 10:00am. EST, July 9, 2024. Only one site visit will be conducted. Offerors shall email a list of site visit attendees to Tamela.Lewis@nist.gov and copy to Richard. Stevens@nist.gov by 1:00pm. EST, July 6, 2024, with the following information: a. Name (first, middle, last) as it appears on your Government issued ID. b. Company name. c. Email of a site visit attendee The Government will then site visit details to the emails provided. The Government plans to share the list of site visit attendees with both interested vendors (as found on www.sam.gov) and site visit attendees if email is provided per above. Amend 0001 Is hereby issued to respond to Contractor RFIs, provide a copy of Site Visit Contractor attendance list and extend the RFP due date to July 31, 2024 at 1pm (est).

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS