Electrical Distribution System Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract mandates the installation of a 25kV primary electrical distribution system encompassing pad-mounted transformers, switchgear, grounding infrastructure, and all necessary terminations, strictly in accordance with the referenced electrical drawings labeled E101 through E301. This work is scoped as a subcontract under the broader electrical infrastructure initiative by the Board of Regents of the University System of Georgia, with performance expected to meet all technical specifications and safety standards implied by the drawings and industry practices for high-voltage distribution systems. The solicitation was posted on August 7, 2026, with a firm deadline for responses set for September 11, 2026, at 7:00 PM. The North American Industry Classification System code 238210 indicates this is for electrical contracting services, aligning with specialized power system installation activities. Although specific location details for performance or contact points are not provided, the contracting entity is clearly the Georgia agency under the University System of Georgia, and the work is likely situated at one or more of its campuses or facilities governed by the Board of Regents. All bids must fully comply with the technical requirements and timeline, with no set-aside provisions indicated for small or disadvantaged businesses.

General Info

Install 25kV electrical system per drawings E101–E301 for University System of Georgia by September 11, 2026.

Agency

Board Of(university System of Georgia) RegentsView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyBoard Of(university System of Georgia) Regents
ContactsNo contacts available
OfficeN/A
Organization / Agency
Board Of(university System of Georgia) Regents
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 25kV primary electrical distribution system including pad-mounted transformers, switchgear, grounding, and terminations per electrical drawings E101–E301.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
Replacement Fiber Line
Solicitation # Replacement Fiber Line
The contract pertains to the replacement of existing multimode fiber optic cabling with a new 12-strand single-mode fiber optic cable system connecting Building 2436 to Building 2443 at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The work involves removing retired multimode aerial fiber lines and splice boxes from utility poles and the building’s MDF to IDF infrastructure, and installing the new fiber using center-owned utility poles. All labor, equipment, tools, and materials must be furnished by the contractor, including specific approved components such as Belden FS3L0024NS 12-strand OS2 OSP fiber, Belden ECX-01U 1U rack-mounted enclosures, Belden FFSX12LD 12-port adapter panels, and Belden FTSLC900FS01 LC OS2 connectors, or approved equivalents. SFPs are to be provided by Job Corps. The contract is structured as a fee-for-service agreement with a lump sum bid format, and the award will be based solely on best value as determined by Management & Training Corporation, the operator of the center. The place of performance is clearly defined at the Job Corps Center campus, with title to all work vesting in MTC at the F.O.B. point. The solicitation is set aside for small business categories including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Business under NAICS code 238210 with a size standard of $19.0 million. Bidders must self-certify their business status and provide a UEI, tax ID, and DUNS number. Required contractual clauses include Service Contract Labor Standards with Wage Determination WD# 2015-4687 (Rev 31), reporting of executive compensation, small business size representation, and protections when subcontracting. First-tier subcontractors exceeding $30,000 must disclose debarment status. Contractors must comply with the Contract Work Hours and Safety Standards Act, maintain a drug-free workplace, adhere to the Anti-Kickback Act, and report any data breaches to the Department of Labor within one hour. Insurance requirements mandate $1 million per occurrence and $3 million aggregate general liability coverage with MTC named as additional insured, $1 million auto liability, and $500,000 workers’ compensation. In
Earle C. Clements Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 2 days
View Details
NAICS: 238210
New
AEA-0536, VORTAC (ART) Doppler Conversion, Watertown, NY
Solicitation # aea-0536-vortac-art-doppler-conversion-watertown-ny
The FAA is upgrading its existing VHF Omnidirectional Range facility in Watertown, New York, to a modern Doppler VORTAC system with an offset TACAN, requiring the complete demolition of the current infrastructure. The new installation will feature an on-site 37-foot by 37-foot steel building equipped with a 60-foot diameter counterpoise integrated into the roof, along with full foundations, site preparation, and utility connections. Adjacent to the main structure, a standalone 16-foot by 16-foot by 20-foot steel tower will be constructed to support the offset TACAN component, also including dedicated foundations, site work, and utility services. This project represents a significant modernization of navigational aid capabilities in the region, replacing outdated equipment with a more accurate and reliable Doppler-based system. The solicitation for this project is issued under contract number AEA-0536 and is open exclusively to small business concerns as defined by the Small Business Administration, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. The solicitation was posted on August 8, 2026, with responses due by August 28, 2026, and the North American Industry Classification System code is 238210 for site preparation and infrastructure construction. The contracting activity is managed by PTSI Managed Services, Inc., operating as Parsons, with Angela Stydinger from the FAA serving as the primary point of contact for inquiries. The entire project will be performed at the existing facility location in Watertown, New York.
PTSI Managed Services, Inc (Parsons)

POSTED

about 8 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238210
New
SLED
Minority Business Enterprise (MBE) Participation and SubcontractingThe contract seeks to engage certified Minority Business Enterprises (MBEs) in electrical, civil, or supply roles to fulfill the University System of Georgia Board of Regents' policy on diversity and inclusion while ensuring eligibility for state tax credits under O.C.G.A. §48-7-38. Participation is mandatory for contractors to meet set goals, and MBEs must be properly certified to qualify for inclusion in the project workforce or supply chain. This subcontract opportunity is tied to a specific project under NAICS code 238210, indicating an emphasis on electrical contracting services, though civil and supply roles are also included to broaden MBE involvement. The solicitation is open for responses until September 11, 2026, and is posted under the Georgia state procurement system with an active digital portal for access and submissions. The engagement is not a direct government procurement but rather a subcontracting requirement imposed by the agency, meaning prime contractors must demonstrate how they will integrate certified MBEs into their project execution plan. Failure to meet MBE participation targets may jeopardize tax credit eligibility and could result in contract noncompliance penalties. There is no specified location for performance, but the oversight and compliance responsibilities fall under the Georgia state agency, requiring all participants to align with state regulations and reporting standards. This contract is designed to drive economic equity by channeling project opportunities to historically underrepresented business owners within Georgia’s construction and supply sectors.
Board Of(university System of Georgia) Regents

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238210
New
SLED
Cabling Service and Related Products
Solicitation # COOP2026SOL-00008
The Department of Information Resources (DIR) of Texas issued a Request for Offer (RFO) with solicitation number COOP2026SOL-00008 to establish a Master Cooperative Contract for Cabling Services and Related Products, targeting state and local government entities across Texas. The contract scope encompasses the planning, design, installation, maintenance, and support of IT data, video, and voice cabling using balanced copper and fiber optic systems, including related equipment such as data racks, patch panels, wire management, fiber junction boxes, and wall plates. All pricing must include labor, materials, shipping (FOB), delivery, labeling, testing, certification reports, and a 0.75% DIR administrative fee. Respondents must submit detailed pricing for cable pulls (labor only and labor plus materials), hourly rates for ancillary services like troubleshooting and project management, and discounted unit pricing for cabling products based on MSRP. The contract has an initial term of up to two years with two optional renewals—one for two additional years and one for one year—potentially extending the contract to five years, with DIR retaining the right to extend the final term by up to twelve months. Performance is required within designated Texas geographical zones, with hourly and per-unit rates submitted per zone. Responses must be submitted by September 24, 2026, via the BidStamp VIS portal and must include all mandatory exhibits: Response Certification, Company Ability and Responsiveness, Marketing and Customer Support Plan, Subcontracting Plan, Pricing Sheet with scenarios, EDGAR Certification, PDAA Self-Assessment, ACR (VPAT), and VADSIR, along with Letters of Authorization. The evaluation process includes five mandatory pass/fail gates: financial stability verified by Dun & Bradstreet, a signed State Subcontracting Plan, compliance with specific Texas Government Code sections, adherence to accessibility standards under Chapter 2054 and WCAG 2.1 AA, and a non-zero PDAA score—failure in any, particularly the PDAA, results in disqualification. Weighted evaluation factors include pricing (45%), company capability (30%), and marketing/support plan (25%), with award based on best value to the state. Contractors must adhere to rigorous state-mandated requirements including Buy Texas, E-Verify, cybersecurity training under Texas Government Code Section 2063.104, TX-RAMP compliance for cloud services, prohibitions on foreign ownership linked to adversarial nations, human
Department of Information Resources

POSTED

about 16 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 238210
New
International
Mountain View Regional Water Services Commission - Request for Proposal - MVRWSC - Anthony Henday Water Treatment Plant Electrical Upgrades
Solicitation # AB-2026-05588
The Mountain View Regional Water Services Commission is inviting qualified general contractors to submit prequalification applications for the first phase of electrical upgrades at the Anthony Henday Water Treatment Plant, identified under solicitation number AB-2026-05588. This prequalification stage is mandatory for any firm wishing to be considered for the subsequent invitational tender process, which will formally award the contract. Applicants must demonstrate proven experience in electrical upgrades within operational water treatment facilities and show an ability to manage construction without disrupting critical plant operations or compromising regulatory compliance. Attendance at a mandatory site assessment meeting on August 20, 2026, is required to remain eligible, and all submissions must be received by the deadline of August 27, 2026, via email. Successful prequalified contractors may be invited to bid on this initial project and potentially on up to three additional planned upgrades over the next three years, with the Owner retaining discretion to assign follow-up work through change orders or competitive RFPs to maintain consistency in execution. The scope of work involves extensive electrical infrastructure replacement and integration, including removal and disposal of existing 4160V and 4160V/600V transformers and switchgear, installation of new owner-supplied 4160V switchgear and a 2 MVA transformer, and construction of new underground conduit and cable bus routes connecting key components. Contractors must supply and install temporary power systems to maintain service during shutdowns, transition all 600V loads from legacy distribution panels to a new 600V power distribution panel, and deploy new PLC remote I/O control panels with associated wiring. Additional responsibilities include coordinating de-energization and re-energization of utility connections with Fortis, managing excavations and trenching, conducting pre-startup inspections, participating in bi-weekly progress meetings, overseeing commissioning, and delivering comprehensive record documentation. The prime contractor is fully accountable for occupational health and safety compliance on site and must ensure all activities adhere to regulatory standards. All submissions must comply with the detailed requirements outlined in the solicitation, and only those who meet the prequalification criteria will advance to the next procurement stage.
Mountain View Regional Water Services Commission

POSTED

about 16 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Board Of(university System of Georgia) Regents

Same awarding agency

NAICS: 541611
New
SLED
Project Documentation and Compliance ManagementThe contract entitled Project Documentation and Compliance Management requires the successful vendor to oversee the complete administration of bonding, insurance compliance, and subcontractor documentation, with strict adherence to A.M. Best-rated insurance standards and public works regulations. This includes ensuring all parties meet the required financial and legal thresholds for surety bonds, liability coverage, and worker protections dictated by state and federal public construction mandates. The vendor must maintain accurate, auditable records and coordinate with subcontractors to verify their compliance before work commences and throughout project execution. Managed under the Board of Regents of the University System of Georgia, this subcontract is tied to infrastructure or construction initiatives within the state and demands a thorough understanding of Georgia’s public works laws and insurance requirements. The solicitation was posted on August 7, 2026, with responses due by September 11, 2026, and is classified under NAICS code 541611 for management consulting services, indicating the role focuses on administrative oversight rather than direct construction. The place of performance and exact project location are not specified, suggesting the scope may span multiple sites under the university system’s jurisdiction, and all work must align with the state’s procurement and contracting protocols.
Administrative Management and General Management Consulting Services

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 423610
New
SLED
Supply of Pad-Mounted Transformers and Electrical EquipmentThe contract entails the supply of six 25kV pad-mounted transformers labeled ST-1 through ST-6, along with all necessary associated electrical components such as switches, terminations, and grounding kits required for full operational integration. These components must meet specified technical and safety standards to ensure reliable performance in utility or campus electrical distribution networks. The equipment is intended for delivery and installation at an unspecified location under the jurisdiction of the Board of Regents of the University System of Georgia, with performance expected to align with the functional and operational demands of the Georgia public university infrastructure. The solicitation, issued under the NAICS code 423610 for Electric and Other Utilities Distribution, is structured as a subcontract and was posted on August 7, 2026, with a firm response deadline of September 11, 2026, at 7:00 PM. While no set-aside classification or point of contact is provided, the procurement is managed through the Georgia state procurement system via the designated UI link. Suppliers must ensure compliance with all technical specifications, delivery timelines, and installation readiness requirements without detailed performance location information provided, implying that final site details may be coordinated directly after award.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details