Electrical Distribution System Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract mandates the installation of a 25kV primary electrical distribution system encompassing pad-mounted transformers, switchgear, grounding infrastructure, and all necessary terminations, strictly in accordance with the referenced electrical drawings labeled E101 through E301. This work is scoped as a subcontract under the broader electrical infrastructure initiative by the Board of Regents of the University System of Georgia, with performance expected to meet all technical specifications and safety standards implied by the drawings and industry practices for high-voltage distribution systems. The solicitation was posted on August 7, 2026, with a firm deadline for responses set for September 11, 2026, at 7:00 PM. The North American Industry Classification System code 238210 indicates this is for electrical contracting services, aligning with specialized power system installation activities. Although specific location details for performance or contact points are not provided, the contracting entity is clearly the Georgia agency under the University System of Georgia, and the work is likely situated at one or more of its campuses or facilities governed by the Board of Regents. All bids must fully comply with the technical requirements and timeline, with no set-aside provisions indicated for small or disadvantaged businesses.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts