Mountain View Regional Water Services Commission - Request for Proposal - MVRWSC - Anthony Henday Water Treatment Plant Electrical Upgrades
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Mountain View Regional Water Services Commission is inviting qualified general contractors to submit prequalification applications for the first phase of electrical upgrades at the Anthony Henday Water Treatment Plant, identified under solicitation number AB-2026-05588. This prequalification stage is mandatory for any firm wishing to be considered for the subsequent invitational tender process, which will formally award the contract. Applicants must demonstrate proven experience in electrical upgrades within operational water treatment facilities and show an ability to manage construction without disrupting critical plant operations or compromising regulatory compliance. Attendance at a mandatory site assessment meeting on August 20, 2026, is required to remain eligible, and all submissions must be received by the deadline of August 27, 2026, via email. Successful prequalified contractors may be invited to bid on this initial project and potentially on up to three additional planned upgrades over the next three years, with the Owner retaining discretion to assign follow-up work through change orders or competitive RFPs to maintain consistency in execution. The scope of work involves extensive electrical infrastructure replacement and integration, including removal and disposal of existing 4160V and 4160V/600V transformers and switchgear, installation of new owner-supplied 4160V switchgear and a 2 MVA transformer, and construction of new underground conduit and cable bus routes connecting key components. Contractors must supply and install temporary power systems to maintain service during shutdowns, transition all 600V loads from legacy distribution panels to a new 600V power distribution panel, and deploy new PLC remote I/O control panels with associated wiring. Additional responsibilities include coordinating de-energization and re-energization of utility connections with Fortis, managing excavations and trenching, conducting pre-startup inspections, participating in bi-weekly progress meetings, overseeing commissioning, and delivering comprehensive record documentation. The prime contractor is fully accountable for occupational health and safety compliance on site and must ensure all activities adhere to regulatory standards. All submissions must comply with the detailed requirements outlined in the solicitation, and only those who meet the prequalification criteria will advance to the next procurement stage.
General Info
Agency
NAICS
Place of Performance
Innisfail, AB, CANSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
A Site Assessment Meeting is scheduled for August 20, 2026 at 09:00 AM at the Anthony Henday Water Treatment Plant, located at 35566 Range Rd 10, Red Deer County, AB T4G 0H5. For a prequalification and opportunity to submit a subsequent bid to be considered, it is a mandatory for Applicants to attend this briefing. All attendees will be required to wear appropriate PPE (safety boots, hard hat, and vest. Interested Applicants can register for the meeting by emailing Ryan Jalowica, P.Eng., at jalowicar@ae.ca on or before August 18, 2026. Submissions to the Prequalification will be received via Email to: jalowicar@ae.ca, before the time and date described in Appendix C. Submissions received after the deadline will not be considered. Refer to Section 2 for complete submission details and requirements.