Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Engineering & System Design

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 10 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This subcontract, titled Electrical Engineering and System Design, supports prime contractors on projects for the Army Contracting Command-Rock Island facility under the Department of Defense. The scope of work involves evaluating existing machinery to develop electrical schematics and a comprehensive retrofit package specifically for a Cincinnati MO 5305U18 lathe. The project requires the use of CAD software and strict adherence to NEMA enclosure and OSHA arc flash safety standards to ensure all designs meet regulatory and safety requirements. The final deliverables include a complete engineering design package, detailed electrical schematics, and a procurement list. This opportunity is designated as a total Small Business Set Aside under NAICS code 541330, with the place of performance located in Rock Island. The response deadline for this requirement is September 11, 2026.

General Info

Electrical engineering retrofit for Army lathe in Rock Island, due September 11, 2026.

Agency

Department Of Defense → W6QK Acc-RiView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Rock Island, IL, 61299, USA

Set-Aside

SBA

Documents

This scope was carved out of W519TC-26-Q-A181.

The full solicitation package (28 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cincinnati Lathe MO Retrofit

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Ri
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W6QK Acc-Ri
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical engineering and design for prime contractors on Army Contracting Command-Rock Island facility projects. Evaluates existing machinery to engineer electrical schematics and design a retrofit package for a Cincinnati MO 5305U18 lathe. Utilizes CAD software and adheres to NEMA enclosure and OSHA arc flash safety standards. Delivers the engineering design package, electrical schematics, and procurement list.

More opportunities from Department Of Defense → W6QK Acc-Ri

Same awarding agency

NAICS: 333517
New
Federal
Cincinnati Lathe MO Retrofit
Solicitation # W519TC-26-Q-A181
The Army Contracting Command-Rock Island is soliciting a total small business set-aside for an electrical retrofit of a Cincinnati Lathe MO 5305U18-88-013 located at the Rock Island Arsenal Joint Manufacturing and Technology Center in Illinois. The project requires a qualified contractor to engineer, procure, manufacture, install, and debug a comprehensive electrical retrofit package, featuring a FANUC Oi-TF Plus Control series with a 15 inch LCD display, updated servo and spindle motors, and new wiring and enclosures meeting NEMA standards. The contractor must also provide operator training and ensure the equipment can execute qualification cuts exceeding six feet with a dimensional tolerance of plus or minus 0.0005 inches. All work must adhere to OSHA safety standards for arc flash and lockout/tagout procedures. The government intends to award a single firm-fixed-price purchase order to the lowest-priced, responsive, and responsible vendor following a technical review for acceptability. The period of performance is not to exceed 34 weeks after contract award, with a target delivery date of November 1, 2026. Quotes are due by 6:00 PM on September 11, 2026, and must include shipping to Rock Island Arsenal and a Certificate of Conformance for all items. Payment will be processed electronically via the Wide Area Workflow system.
Machine Tool Manufacturing

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS